PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.

Slides:



Advertisements
Similar presentations
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Advertisements

ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Louisiana Safe Routes To School Program
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
Utah’s Use of CMGC & Project Delivery
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
Small City Funding Opportunities Transportation Improvement Board June 2010.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Design Exceptions Presented by David Joe Polly PE, PLS, WRE Senior Standards Engineer Roadway Engineering Unit
Genesis Solar Module Brochure ™
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Initiating and Planning Systems Development projects
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
PLANNING FOR DESIGN Shawn Dikes, AICP FHWA / KYTC / ACEC Partnering Conference 2015.
Project Management Requirements
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
August 30, 2012 Cost Estimate Review Closeout Presentation St. Croix River Crossing Project Minnesota and Wisconsin.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
Contractor Alternate Design Serving the Public’s Best Interest.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Value Engineering Study and Risk Assessment
FOR LOCAL AGENCY FEDERAL AID PROJECTS
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Presentation transcript:

PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS

NEED FOR PROJECT SCOPING

Scoping is the foundation upon which your entire project is built Just as you would not consider building a house without a proper foundation, you should not consider developing a project without a proper scope Your project is only as good as the foundation upon which you built it

Scoping verifies and documents the purpose and need for your project What is the problem? What are the alternatives? What are the impacts? What are the goals of your project?

Benefits of Good Scoping Verifies and fixes the right problem Project is correctly programmed Project is kept within budget and on schedule

Proper Scoping Can Save You Months of wasted time Hundreds of hours of staff time Thousands of dollars in PE costs Millions of dollars in construction costs

GETTING STARTED Project Research Scoping Team Scoping Site Visit Project Prospectus

OFFICE RESEARCH

RESEARCH Project purpose and need statement – What is the problem we are trying to correct Design standards to be used – Does the current alignment meet standards Current and future traffic volumes- Build year and design year

Accident history, accident rate, analysis of accident “hot spots” Existing pavement conditions and preliminary ideas for surfacing treatments Bridge inspection reports and recommended actions Vicinity maps, Right of Way Maps, and as constructed drawings

SCOPING TEAM

MEMBERS Project Leader (Local, ODOT/Consultant) Engineering - Roadway, Bridge, Traffic Right of Way Environmental Utility Specialist Construction Project Management

Additional Members Geo/Hydro Pavements Planning Surveying Rail Safety Public Affairs Access Management

SITE VISIT

Take good notes and document Safety concerns and possible solutions Pavement conditions and surfacing design alternatives Stage construction concerns and alternatives Right of Way impacts and needs

Access issues Utility impacts Pedestrian and bicycle needs ADA needs, ramps, sidewalks, driveways Level of Survey work required

Environmental impacts –Wetlands –Hazmat –Threatened and Endangered Species (ESA) –Historic –Archaeological

PROSPECTUS

PROJECT PROSPECTUS The project prospectus is a tool to convey information about projects to various organization inside and outside of ODOT It starts the process of identifying a problem to be solved and presents ideas on how to solve it

It also contains information on the Project: –Costs –Funding sources –Funding years –Right of Way impacts –Environmental impacts

Part 1 provides information on: The project location Overview of the project Problem statement Proposed solution Cost estimates for PE, CE, Right of Way, and construction

Part 2 defines: Who is responsible for completing different categories of the project design Base design requirements Roadway element widths Structure size and cost Right of Way information

Part 3 – Environmental details: Details environmental impacts Environmental baseline information Required permits, reports and clearances

COST ESTIMATING PE Costs - Identify all tasks that will be involved in developing project, Engineering, Right of Way, Environmental documentation, Utilities, etc. Construction Costs – Identify all project bid items Research recent cost trends and assign reasonable prices to all items.

FEDERAL PROGARAMING Before federal funds can be programmed for the project: –It must be in the STIP –The prospectus must be completed –The project IGA must be completed