E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.

Slides:



Advertisements
Similar presentations
Preparedness for Oil-polluted Shoreline cleanup and Oiled Wildlife interventions (POSOW) Gabino Gonzalez 6th of February 2012 Preparedness project for.
Advertisements

Knowledge Platform for assessing the costs and benefits of flood prevention FLOOD CBA Presentation: Ms Vasiliki Papadopoulou, SIGMA CONSULTANTS Ltd Kick-Off.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
Gesundheits- und Soziale Dienste Charlotte Strümpel PrepAGE – Enhancing disaster management and preparedness for the older population in the EU Kick-off.
CIRAS PROJECT OVERVIEW
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Mass Shelter Capability Project
Portada 2013 CALL FOR PROPOSAL PREVENTION AND PREPAREDNESS Agreement Number – ECHO/SUB/2013/ Autonomous Underwater Vehicles Ready for Preparedness.
This project has been funded with support from the European Commission, the Civil Protection Financial Instrument, – Directorate General for Humanitarian.
SIBYL SeIsmic monitoring and vulneraBilitY framework for civiL protection.
Kick-off meeting DG ECHO 20 January 2015, Brussels
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
FROM GAPS TO CAPS Risk Management Capability on Gaps Identification in the BSR Neringa Brogaitė-Karvelienė Fire and Rescue Department under MoI of Lithuania.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: An outline NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by the.
Enhancing Volunteer Awareness and education against Natural Disasters through E-learning (EVANDE) Dr C. Fassoulas, Project Coordinator Natural History.
Work programme Identifies eligible actions for financial assistance on a yearly basis under Union CP Mechanism in prevention, preparedness and public awareness.
Headquaters Kick-Off Meeting Brussels 17 January 2013 Aware and Resilient Project overview – Austrian Red Cross.
EUROWA Module European Module for Oiled Wildlife Emergency Response Assistance.
With the support of the Civil Protection Financial Instrument European Commission – Directorate General for Humanitarian Aid and Civil Protection - ECHO.
An Integrated Methodological framework for Emergency Logistics - MELOGIC Dr Georgios Boustras Associate Professor in Risk Assessment Dean of the Ioannis.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
MATILDA Project Bruxelles, 20 January 2015 Kick off meeting for the selected projects under the 2014 Call for proposals for prevention and preparedness.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” September 2005.
The Preparatory Phase Proposal a first draft to be discussed.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
Operational and Financial aspects Part 1 Gilles GERVAIS and Misia COGHLAN Project Advisors Brussels, 23rd January 2012.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
E-Learning: Fight Against Oil Spills Kick off meeting Brussels 22 january 2014 Call for proposals for prevention and preparedness projects.
Spanish-Portuguese Meteorological Information System for Trans-Boundary Operations in Forest Fires Agreement number ECHO/SUB/2014/
LLP-LDV/TOI/07/IT/016. F-MU.S.EU.M. PROJECT: STATE OF THE ART AND INTERMEDIATE REPORT TO SUBMIT AT 15 DECEMBER Marco Merlini F-M U.S.EU.M. (Form Multimedia.
BlogForever Project Presentation Vangelis Banos, Project Manager, ALTEC Software Stratos Arampatzis, Dissemination Manager, Tero Dr. Alexandra Cristea,
Jenny Linnerud, 27/10/2011, Cologne1 ESSnet CORE Common Reference Environment ESSnet workshop in Cologne 27th and 28th of October 2011.
Collaborative Reformation of Curricula on Resilience Management with Intelligent Systems in Open Source and Augmented Reality Dissemination Activity (May.
ΕCOSHAZ E CONOMICS OF P REVENTION M EASURES A GAINST C OASTAL E ROSION SIGMA CONSULTANTS Ltd Tel
Cooperation project on strengthening EU's Nordic USAR modules Acronym: EU-NU Grant Agreement n:o ECHO/SUB/2014/
Improvements of Shorelines Defences Against Marine Pollution ISDAMP+ project 2012/PREP/17 Frédéric MUTTIN (EIGSI La Rochelle) Kick-off meeting selected.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AND CIVIL PROTECTION - ECHO ECHO/SUB/2015/713774/PREP04.
ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.
PRO TECTING ME DITERRANEAN CULTURAL HE RITAGE DURING DISASTERS ( PROMEDHE) Brussels 20 January 2016.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
RISKS CONSORTIUM Seismic and volcanic risks Ciência 2010 Lisboa, 5-6 Julho, 2010.
Integrating Cost Benefit Analysis in the Development of Standards for Flood Protection & Safety – FLOOD CBA#2 Project Brussels Kick-Off Meeting
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
Brussels, January 16th, Overview and status of the project.
AMICI WP1 – Management, coordination and dissemination
Kick-off meeting DG ECHO 20 January 2015, Brussels
MULTIPLIER EVENT January , Brussels.
Multi-hazard service EC Project ARISTOTLE
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
The ESS vision, ESSnets and SDMX
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Risk management via an Innovative System based on Knowledge
Advanced systems for prevention & early detection of forest fires (ASPires) KICK OFF MEETING Call for proposals for prevention and preparedness project.
Common Standard Operational Procedures for the Union Civil Protection Mechanism Modules and Teams (UCPM SOPs) – UCPM SOPs – UCPM-2017-PP-AG This.
Local resilience capacity building for flood mitigation CAPFLO
Susanne Wacht (THW) Kick-off meeting 18 January 2017 at DG ECHO / ERCC
Project background In most of the European countries the knowledge regarding measures taken in self-help and -protection is very poor An effective and.
Civil Protection Financial Instrument – Prevention Projects
Risk Management Capability on Gaps Identification in the BSR
AMICI WP1 – Management, coordination and dissemination
ESS.VIP ADMIN Sorina Vâju.
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
The basics ESSnet on SDMX prepared in 2008/2009
SMEDATA Ensuring the Highest Degree of Privacy and Personal Data Protection through Innovative Tools for SMEs and Citizens Brussels, 3 December 2018.
PACES Preparedness for Appropriate accommodation in Emergency Shelters
Presentation transcript:

E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens (UoA) 20 January 2015 ECHO, European Commission, Brussels

Project Objectives Facilitate drill preparations against natural hazards Design and evaluate drills and exercises Identify and implement best practices from previous EU projects Create smart tools to simulate and test an evacuation plan Customize school and campus environments Collaborate with interested parties Include pupils with disabilities and special needs 20 January 2015 ECHO, European Commission, Brussels

Consortium 20 January 2015 ECHO, European Commission, Brussels

Actions Requirement analysis  Definition of actors and roles  Studies on the special needs for each participating country System design and development  In-field dynamic assessment module  Evaluation web portal Pilot demonstration and validation  Field trials on earthquake, flood and volcanic eruption hazards  Evaluation reports Dissemination activities 20 January 2015 ECHO, European Commission, Brussels

In-field Dynamic Assessment Module Set up the exercise environment Specify the evacuation plan Sensor infrastructure  Data concentrator  Profiler for handling the user localization  Spatial information repository with building blueprints Proximity sensors  Lightweight wearable sensors  Wall-mounted sensors 20 January 2015 ECHO, European Commission, Brussels

In-field Dynamic Assessment Module 20 January 2015 ECHO, European Commission, Brussels

Evaluation Web Portal Online forms for the expected level of preparedness Definition of metrics for in-field evaluation Integrated methodology for qualitative and quantitative assessment User-friendly graphical interface

Field Trials and Training Courses Protection against natural hazards in school environments Training courses  Local workshops and seminars  Guidelines including the main functionalities of the system Field trialInvolved OrganizationCountry Earthquakea. EPPO b. UoC-NHMC c. URBAN-INCERC Greece Romania FloodCEIBulgaria Volcanic eruptionVesuvius ObservatoryItaly 20 January 2015 ECHO, European Commission, Brussels

Deliverables TaskStart DateEnd DateDeliverables Project management01/01/201531/12/2016 -Risk analysis and prevention plan -Report on end-users and their activities -Intermediate progress report A -Intermediate progress report B -Final project report User needs01/01/201531/08/2015-State-of-the-art technologies and refinements -Report on user needs and requirements -Proof-of-concept scenarios System design, implementation and testing 01/07/201530/06/2016-Detailed design of the E-PreS architecture. -Prototype implementation of the E-PreS evaluation web portal -Prototype implementation of the E-PreS in-field dynamic assessment module -E-PreS Integration report and testing Pilot demonstrations and system validation 01/05/201631/12/2016-Report on E-PreS field trials -E-PreS training courses -System validation according to all trials Dissemination01/01/201531/12/2016-Dissemination Plan -E-PreS web-site -E-PreS brochures and e-Newsletter (6 issues) -Guidelines and training materials -Publications and press releases -Video-dossier 20 January 2015 ECHO, European Commission, Brussels

Administrative overview Financial instrument: Preparedness and prevention projects Grant Agreement No. : ECHO/SUB/2014/ Project duration: 24 months - 01/01/2015 – 31/12/2016 Total eligible costs: EUR Requested EC contribution: EUR January 2015 ECHO, European Commission, Brussels