BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.

Slides:



Advertisements
Similar presentations
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Advertisements

Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) ESLS-RF Meeting ESRF Status of RF at HZB and SRF at BERLinPro.
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
SUPERCONDUCTING RF (SRF) SYSTEMS Peter McIntosh (STFC) Accelerator-driven Production of Medical Isotopes 8 th – 9 th December
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Slice emittance measurements at HZDR and Pb cathode SRF gun at HZB | T. Kamps | HZB | WP10.7 Slice emittance measurements at HZDR and Pb cathode SRF gun.
Euclid TechLabs LLC, founded in 1999 is a company specializing in the development of advanced designs and new dielectric materials for particle accelerator.
BERLinPro The Berlin Energy Recovery Linac Project Why, How and Status
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
HZB Proposals for EUCARD2 Research V1.0 O. Kugeler | HZB | T. Kamps | HZB |
Q34: Discuss the support of the accelerator community for your technology and to whatever extent your technology has outreach into other accelerator areas?
WP10.6 Advanced Photocathodes Developement DESYJacek Sekutowicz HZBThorsten Kamps HZDRJochen Teichert IOE MUTHenryk Fiedorowicz IPJRobert Nietubyć BNLJohn.
ERL and Frequency Choice Rama Calaga, Ed Ciapala, Erk Jensen, Joachim Tückmantel (CERN)
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
BERLinPro An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
1 SPAFOA meeting May 21, 2015 BNL Center Accelerator Stewardship Test Facilities Pilot Program at BNL Ilan Ben-Zvi Head, Accelerator R&D Division, C-AD.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
I.V. Bazarov, CHESS user mtg, June 2012 CLASSE Cornell University CHESS & ERL Cornell Laboratory for Accelerator-based ScienceS and Education (CLASSE)
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
SRF Gun Development for BERLinPro | T. Kamps | SRF Gun Development for BERLinPro T. Kamps | Ultra Bright.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Intro to WG, part II T. Kamps, C. Hernandez-Garcia FLS 2012 Workshop – FLS 2012 | Intro to WG eSources | Thorsten Kamps.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
O. Kugeler – TTC Meeting February 28 – March – Milano, Italy TTC-meeting Februar 28 – March – Milano, Italy O. Kugeler (based on talk given.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
The Beauty of an ERL for LHeC … and the interest to collaborate Erk Jensen, Ed. Ciapala (with lots of material provided by Rama Calaga, Joachim Tückmantel.
Overview of CW input coupler for ERL
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
UBW2012, A. Matveenko Michael Abo-Bakr (presented by Alexander Matveenko) Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Seesion1 summary Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy Recovery Linacs.
Status of BESSY II and bERLinPro
FFAG Recirculation and Permanent Magnet Technology for ERL’s
Experience with high loaded Q cavity operation at HZB
Degradation and Recovery of Cavity Performance
WG3 Summary High current and CW accelerators
Hosting Orsay Walid KAABI
Overview MESA SRF system and machine design
Joint Accelerator Research JGU & HZB
J. Sekutowicz Topical Workshop on High Repetition-Rate XFEL
Dark current and halo tracking in ERLs
BriXS – MariX WG 8,9 LASA December 13, 2017.
InterActions Meeting--- October 2006 Report from Cornell
Wolfgang Anders, BESSY, Berlin
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
Perspectives of SRF gun development for BERLinPro T. Kamps (HZB)
SRF Pb/Nb photoinjector; recent results
Perspectives of SRF gun development for BERLinPro T. Kamps (HZB)
ERL Main-Linac Cryomodule
آشنایی با توربین انبساطی و کاربرد آن‌ در نیروگاه‌های تولید برق
ERL2015 WG4: RF & superconducting RF for ERL
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Expression of Interest for future flagship projects
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Axel Neumann SRF Science and Technology Helmholtz-Zentrum Berlin
Microphonics A. Neumann Helmholtz-Zentrum Berlin
Presentation transcript:

BERLinPro P. Kuske

P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction of a 100-MeV superconducting RF CW LINAC with energy recovery at Berlin-Adlershof. Building on the existing SRF program at HZB-ME/BESSY, this new facility is designed to develop and demonstrate the CW LINAC technology and expertise required to drive next-generation light sources that are based on the Energy Recovery LINAC (ERL) principle. *DESY HZB/BESSY FZK Cornell Co-Production E. Jaeschke, J. Knobloch

P. Kuske, ESLS08 3 BERLinPro E. Jaeschke, J. Knobloch

P. Kuske, ESLS08 4 Schwerlasthalle E. Jaeschke, J. Knobloch BERLinPro – Building Site

P. Kuske, ESLS08 5 BERLinPro: HoBiCaT – Gun Test Stand E. Jaeschke, J. Knobloch, W. Anders