NSTX NSTX Team Meeting –Masa Ono April 25, 2014 NSTX-U Team Meeting April 25, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

V. A. SOUKHANOVSKII, NSTX-U FACILITY ENHANCEMENT BRAINSTORMING, 7 February 2012 Proposed Facility Enhancements for NSTX Upgrade V. A. Soukhanovskii for.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
NSTX NSTX Team Meeting –Masa Ono Feb. 11, 2014 NSTX-U Team Meeting February 11, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
NSTX-U 5 year plan text finalization J. Menard 5YP Update Meeting B318 March 28, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Particle control task force early run discussion R. Maingi, J. Canik Particle Control Task Force Meeting PPPL LSB B318 January 20, 2015 NSTX-U Supported.
NSTX Status and Plans College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York.
NSTX-U Collaboration Status and Plans for: ORNL Boundary Physics and RF Research J.M. Canik, J.B.O. Caughman, J.-W. Ahn, S.J. Diem, T.K. Gray, D.L. Green,
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Program Update J. Menard For the NSTX-U Research Team NSTX-U Team Meeting PPPL – B318 June 5, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Non-axisymmetric Control Coil Upgrade and related ideas NSTX Supported by V1.0 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
Second Switching Power Amplifier (SPA) Upgrade Physics Considerations Discussion S.A. Sabbagh 1, and the NSTX Research Team 1 Department of Applied Physics,
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
Wave Heating and Current Drive TSG: XMP/XPs for the 2015 NSXT-U Campaign RF-TSG R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli Univ. Rep: P.
Overview of Results from the FY10 National Spherical Torus Experiment Run Eric Fredrickson For the NSTX Team NSTX Supported by College W&M Colorado Sch.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting –Masa Ono May 1, 2015 NSTX-U Team Meeting May 1, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
V. A. Soukhanovskii, XP1002 Review, 9 June 2010, Princeton, NJ 1 of 9 XP 1002: Core impurity density and P rad reduction using divertor condition modifications.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U Team Meeting August 14, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 NSTX-U Team Meeting April 25, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI NFRI KAIST POSTECH Seoul National U ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin NSTX-U Supported by

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 Time: 1:30 ~ 3:00, April 25 (Friday), 2014 Place: LSB 318, PPPL General Items (15 minutes) Program Item (20 minutes) Upgrade Project (20 minutes) Facility Engineering Operations (15 minutes) Research Operations (20 minutes) NSTX-U Team Meeting Agenda 2

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 ES&H Issues (J. Levine) NSTX-U operational preparation activity (e.g., diagnostic installation) is commencing and we need to be extra cautious regarding safety! With nice spring weather, the outdoor activities could bring hazards - Proper protective clothing (e.g., long sleeve shirts and pants) - Mindful of Ladder safety - Gloves, mask, and eye protection - Watch out for bees and other insects Safely, Safely, Safely 3

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 NSTX-U Department Activities in Q2 FY 14 Significant collaboration research contributions are being made in diverse science areas by the NSTX-U research team. On-going active research collaboration particularly with DIII-D and EAST. Several activities resulted in IAEA synopses. A good set of IAEA synopses (~ 30) accepted by IAEA. Favorable budget should enable preparation for the NSTX-U operation while completing the Upgrade Project. Some resources maybe available to start the design work on high priority five year plan enhancements. –MG motor generator repair procurement should be concluded in the near future and the work to start in May. –Firing generators were installed. It is ready for test when the DCPS is avaiiable. –HHFW antenna should be re-installed in early May along with the P-CHERs passive plates. –In-vessel diagnostic installation/reinstallation work is in progress. NSTX-U OFES BPM visit / presentation took place on April 17,

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 Formulating Strategy for Successful Implementation of FY14 Milestones Mainly Through Data Analyses, Theory/Modeling, and Collaborations

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 FY 14 NSTX-U PEMP Notable Outcomes Goal 1.0Mission Accomplishment FES: Carry out scenario modeling and research planning to ensure a strong NSTX-U research program in FY (Objective 1.1) Part of the high priority NSTX-U research activities including enhanced modelling of NSTX-U current ramp-up by Francesca Poli (PPPL). Favorable budget helping this area of program activity. FES: Analyze experimental data from FES major facilities to investigate and quantify plasma response to non-axisymmetric (3D) mangetic fields in tokamaks, in support of the FES joint research target. (Objective 1.1) NSTX-U researchers, Jong-kyu Park (PPPL) and John Canik (ORNL) are co-leading the effort at PPPL. Goal 2.0 Design, Fabrication, Construction and Operation of Research Facilities FES: Continue to maintain the NSTX-U project with 10% of cost and schedule. (Objective 2.2) The NSTX Upgrade project is supported at the highest priority from the NSTX Program side. The preparation for operation of the NSTX-U research facility has begun by the NSTX-U engineering and research operations team. Favorable budget is helping this area of program activity. Ron Hatcher’s recent passing has created special challenges in various areas including DCPS, CHI, and ISTP. Goal 3.0 Program Management. FES: Expand engagement with university scientists to enhance the NSTX-U program. (Objective 3.2) C-Mod collaboration contract in place, but postponed at least 1 year due to C-Mod operations. Favorable budget helping fund collaborators, also holding team-wide meetings to identify ways of expanding university engagement.

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 NSTX-U diagnostics to be installed during first 2 years Diagnostics presently being installed prior to the center-stack installation MHD/Magnetics/Reconstruction Magnetics for equilibrium reconstruction Halo current detectors High-n and high-frequency Mirnov arrays Locked-mode detectors RWM sensors Profile Diagnostics MPTS (42 ch, 60 Hz) T-CHERS: T i (R), V  (r), n C (R), n Li (R), (51 ch) P-CHERS: V  (r) (71 ch) MSE-CIF (18 ch) MSE-LIF (20 ch) ME-SXR (40 ch) Midplane tangential bolometer array (16 ch) Turbulence/Modes Diagnostics Poloidal Microwave high-k scattering Beam Emission Spectroscopy (48 ch) Microwave Reflectometer, Microwave Polarimeter Ultra-soft x-ray arrays – multi-color Energetic Particle Diagnostics Fast Ion D  profile measurement (perp + tang) Solid-State neutral particle analyzer Fast lost-ion probe (energy/pitch angle resolving) Neutron measurements Edge Divertor Physics Gas-puff Imaging (500kHz) Langmuir probe array Edge Rotation Diagnostics (T i, V , V pol ) 1-D CCD H  cameras (divertor, midplane) 2-D divertor fast visible camera Metal foil divertor bolometer AXUV-based Divertor Bolometer IR cameras (30Hz) (3) Fast IR camera (two color) Tile temperature thermocouple array Divertor fast eroding thermocouple Dust detector Edge Deposition Monitors Scrape-off layer reflectometer Edge neutral pressure gauges Material Analysis and Particle Probe Divertor VUV Spectrometer Plasma Monitoring FIReTIP interferometer Fast visible cameras Visible bremsstrahlung radiometer Visible and UV survey spectrometers VUV transmission grating spectrometer Visible filterscopes (hydrogen & impurity lines) Wall coupon analysis New capability, Enhanced capability 7

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 The NSTX Upgrade Project Team is focused on CD-4 completion in December, The NSTX-U Research Team should focus on starting in March Complete as much research run preparation tasks as possible prior to CD- 4 to minimize the period between CD4 and the research plasma operation. Assume the machine accessibility decreases as time goes on. Get your work done early!! Schedule will Provide Exciting Research Operation in FY15 18 Run-Week commitment means we must start the run in mid-March Res. Op Nov. 2014Dec. 2014Jan. 2015Feb. 2015Mar Bakeout ISTP/Com m CD4 Research Run Prep Research Preparation for FY 2015 Run 8 ISTP/Com m Apr. 2014May 2014Jun. 2014Sep. 2015Jul. 2014Aug 2014Oct Pump down Install CS OH VPI OH Winding Research Run Prep

NSTX NSTX Team Meeting –Masa Ono April 25, New center-stack 2nd NBI Start-up and Ramp-up Scenarios and Control Boundary Physics Materials and PFCs MHD Transport & Turbulence Waves and Energetic Particles Liquid metals / lithium Upgrade Outage Upward LiTER Li granule injector High-Z first- wall + lower OBD tiles NCC SPA upgrade Enhanced MHD sensors Divertor Thomson High-Z PFC diagnostics MGI disruption mitigation High k  Partial NCC 4 coil AE antenna 1 coil AE antenna  B polarimetry 1 MW ECH/EBW up to 1 MA plasma gun Lower divertor cryo-pump High-Z tile row on lower OBD Upgraded CHI for ~0.5MA LLD using bakeable cryo-baffle MA CHI Metallic PFCs, 5s  10-20s Extend NBI duration to s and/or implement 2-4 MW off-axis EBW H&CD Hot high-Z FW PFCs using bake-out system Flowing Li divertor or limiter module Full toroidal flowing Li lower OBD Full NCC 1.5  2 MA, 1s  5s High-power AE antenna HHFW straps to excite EHO Charged fusion product, neutron-collimator HHFW limiter upgrade DBS, PCI, or other intermediate-k All high-Z PFCs Upper divertor cryo-pump Establish control of: 2 MW Control integration, optimization with long- pulse and full metal wall Control integration, optimization Rotation Divertor P rad q min Snowflake nene Run Weeks: Inform choice of FNSF: aspect ratio, divertor, and PFCs 9 Significant Near Term Upgrade Scopes Are Highlighted ECH, Cryo-Pump and NCC system require resources starting in 2015

NSTX NSTX Team Meeting –Masa Ono April 25, 2014 Draft NSTX-U Facility/Diagnostic Milestones Crucial to complete ECH/EBW and Cryo-pump Design in FY