Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

LEAK TESTING in SMACC Cold vacuum system recall Phase 1, 2 & 3 VSC activities Resources, Infrastructure Still to do Paul Cruikshank on behalf.
Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
Overview of SMACC-QA 1.Recall of SMACC-QA organization 2.Tuning the procedures 3.Main results from the QC teams 4.Auditors findings Ranko Ostojic 23 July.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Consolidation and Upgrade plans for the LHC Vacuum System
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Teleconf ACS – FREIA 28th March 2017
PROTECTION SHELLS TE-VSC.
Roadmap for triplet cryostats
TE-MSC activities in SPS during LS2
SMACC Tenth report [15 min] 13/09/2013
Cryostat procurement, status and plan, QA/QC
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Update of cryogenic activities
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
Cedric Garion, TE-VSC-DLM, WP12
Consequences of warming-up a sector above 80 K
SPS Planning for the EYETS Meeting 8 (07/12/2016)
J.M. Jimenez On behalf of TE-VSC group
K. Foraz on behalf of OSS members
On behalf of TE-VSC group
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
Closing of sector 7/8 Interconnections of LHC cryomagnets
Presentation transcript:

Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12

VSC consolidation – Beam Vacuum (1) 1.Eliminate critical PIM  Corrective action: ~14  Ball tests  localization of buckled fingers and finger exchange  Endoscopic inspections  Preventive consolidation (TETM, 17/01/2011)  Arc extremities : 18  Magnet exchanges: 18*4  Damage bellows: ~10

1.Ball test (TE/VSC & BE/BI) 2.Interconnection opening (SIT) 3.Beam line cutting (SIT) 4.Dummy PIM installation 5.PIM reconditioning (VSC) // Lip measurements* (ICIT) // Endoscopy (ICIT) 6.PIM positioning, tack welding and PIM bellows protection (VSC) 7.PIM welding (SIT) 8.Beam line leak test (VSC) 9.Ball test (VSC) VSC consolidation – Beam Vacuum (1) Work is done in collaboration with the Special Intervention Team (SIT) Simplified PIM consolidation sequence: Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12 * Required for PIMs at magnet exchanges and for damaged bellows In case of buckled RF fingers, the same PIM body is re-installed at the same location (PIM WG, 2/12/08)

Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12 2. Protect against overpressure:  Install rupture disks and non-return valves  Install protective shells to limit the bellows deformations 3.Protect against electrical arcs and melted particle projection  Install protective shells (PEI) VSC consolidation – Beam Vacuum (2)

Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12 4. Protect against pressure wave, cold gas and debris propagation (no impact on SMACC):  Reduce sector valve closure time  Install fast shutter valves close to the RF cavities VSC consolidation – Beam Vacuum (3)

VSC Support – Beam Vacuum (1) Check integrity of bellows:  Beam screen, PIM and X line bellows  Visual inspections of bellows after opening and before closure  Installation of temporary protections in place throughout the period during which the interconnections are open: rubber strip + stainless steel foil Additional protections (1 protective half shell per line) will be installed during (at least) the cutting activities. Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12

1.Interconnection opening (MSC): W bellows, thermal and radiative shields 2.Rubber protections on V1, V2 and X bellows (MSC) 3.M bellows shell dismounting (MSC) 4.Interconnection inspection and thermometers disassembly (IC QA) 5.Rubber protection removal and bellows inspection (ICIT) 6.Rubber and stainless steel foil protection installation (ICIT) 7.Installation of additional dedicated protective half shell before the cutting train and removal after ~1 week (recycling) (ICIT) 8.Beam vacuum line leak tests (VSC) 9.Temporary protection removal and bellows inspection (ICIT) 10.Installation of permanent protective half shells (ICIT) 11.Interconnection inspection and thermometers assembly (IC QA) 12.M bellows shell assembly (MSC) 13.Interconnection closure (MSC) VSC Support – Beam Vacuum (2) Opening/closure and inspection/protection sequence: Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12

VSC Support – Beam Vacuum (3) Inspection work flow:  The status of existing non-conformities is available (based on EDMS data) Expected state 1 st inspection: state conformed to expectations YesNo NC follow up (if exists): to cut or not to cut? Visual localisation of damage, if any, and protections Other activities: splice, leak tests,ELQA,… 2 nd inspection: state conformed to expectations NC follow up: to cut or not to cut Delete of damage localisation marks, Installation of the protective half shells NC opening Yes No NC opening NC closure

VSC Organization LHC cold beam vacuum LBV:  RF Ball tests,  Rupture disks and non- return valves, EIV:  PIM repair/consolidation  Beam line inspection and protection  Protective half shells Extra resources:  1 tech. student (traceability)  0.5 FSU (PIM)  6 staffs from polish collaboration: cold beam line inspections and protections Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12

Status Component procurement  Protective half shellsReceived  Temp. V bellows protection (& X)Received  Spare PIMsReceived  Tools Received or ordered Documentation & workflow  Existing NC on bellowsOK  ProceduresEDMS : to be released  WISH toolOn-going  ECREDMS : to be released Cédric Garion TE/VSC Beam Vacuum Quality Control 3 rd LHC Splice Review, Nov ‘12

Thanks for your attention!