Advanced Metering Implementation in ESPCs Drivers 1) Legislation Mandate – No $ 2)M&V Requirements in ESPCs 3)Utilities Cost allocation (e.g. tenants)

Slides:



Advertisements
Similar presentations
NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
Advertisements

DOE O 430.2B Metering Requirements and Status
Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
Energy Sub-Metering for Measurement and Verification
Building Upgrade Tool City of Melbourne Ed Brown June 2013.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
ENERGY PERFORMANCE CONTRACTS: The Role of the HUD Field Office and the HUD Energy Center GREEN FUNDING OPPORTUNITIES FOR ILLINOIS PUBLIC HOUSING AUTHORITIES.
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Energy Performance Analysis with RETScreen
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
ORNL ESPC Overview GovEnergy ESPC Project Summary  $89M project funded by $8.2M in guaranteed annual savings  Energy Conservation Measures: 1.Select.
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
Advanced Metering Infrastructure
The Business Case for Metering Mitchell Stein, Quadlogic.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Genesis Solar Module Brochure ™
M&V Planning Working Group Update M&V Summit, New Orleans 5/5/03 Satish Kumar and Venkat Kumar.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
FEMP Assistance Meeting Forest Service Needs Energy Savings Performance Contracting ESPC.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,
Presentation to the: Pennsylvania Public Utility Commission Demand-Side Response Working Group December 8, 2006 Gas Utility Decoupling in New Jersey A.
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Overview of US Army Corps of Engineers (USACE) ESPC & UESC Programs
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Phoenix Convention Center Phoenix, Arizona FEMP’s New ESCO Selector Tool Project Financing Tools for a Successful Project Scott Wolf Oak Ridge National.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
1 Operation & Maintenance Savings M&V Summit Kansas City, MO 6 November 2002.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Highlights from the FEMP Advanced Metering Workshop September 25, 2003 Golden, Colorado.
Santee Cooper Encouraging Energy Efficiency APPA National Conference June 15, 2009.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
THE COMPLETE SOLUTION IN ELECTRICITY AND ENERGY SAVINGS.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
Technical Working Group Status Updates Federal ESPC Quality Assurance Steering Committee January 25th, 2004 Washington,
Financial ESPC Training Work Session. Proprietary Information Of Energy 2013 Assistance from DOE National Laboratories FEMP works with DOE National Laboratories.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
2 Breakout Session # 506 Daryl Berg, DOE Contacting Officer Julia Trautman, DOE Contract Specialist Date April 15, 2008 Time3:20 – 4:20 p.m. Energy Savings.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
M&V Commissioning Sub Committee Report Doug Dahle - NREL Steve Dunnivant - EMP2 FEMP M&V Summit - Kansas City November 6, 2002.
Supporting NCCU’s Educational Mission – with “Real-Time” Energy Measurement & Reporting.
Clean Energy Incentive Program Michigan Energy Optimization Collaborative October 20, PRESENTATION.
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
Army Policy Guidance for Utility Energy Services Contracts Randy Smidt, Headquarters Dept of Army, Office of the Assistant Chief of Staff for Installation.
Overview Federal Project Financing Vehicles by David McAndrew Federal Energy Management Program.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
US Army Corps of Engineers BUILDING STRONG ® Capital Investment Strategy (CIS) to Achieve Total Netzero Energy, Waste, and Water Porscha Porter USACE Engineering.
Energy Savings Performance Contracts & Energy Service Companies
Seminar On Energy Audit Submitted To: Submitted By:
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Developing and Issuing the RFP
Presentation transcript:

Advanced Metering Implementation in ESPCs Drivers 1) Legislation Mandate – No $ 2)M&V Requirements in ESPCs 3)Utilities Cost allocation (e.g. tenants) based on actual energy consumption 4)Retro & Continuous Cx opportunities

Advanced Metering Implementation in ESPCs Discussion A)Review Technology Categories in IDIQ B)DES or ECM Cost Basis C)M&V Plan B  ECM Metering C/D  Bldg Meter (install early part of DES) D)How can metering generate ECMs

Proposed Advanced Metering implementation in ESPCs Submit cost for DES metering at IP –(Min - meter for buildings w/ECMs) NOI a)Metering plan & estimated Price See Advanced Utility Metering Subcontract Report, Sep 03, NREL/SR 710/33539 Install meters during DES –(Even if no DO- agency has metering – known cost) Submit with DES metered data for each building (electricity, natural gas, water) –ID ECM energy use as percentage of building –Agency access to data with ESCO (web based)

Benefits of Metering in ESPC (What motivates Agency & ESCO) Meets agency mandate Does not preclude stipulated M&V where appropriate ESPC Program – ESCO credibility Better data for baseline and ECM performance monitoring Increased opportunity to find/mine new savings - ECMs & Retro/Continuous Cx activity –(mod DO – negotiate % of savings for Cx) Real-time diagnostics of buildings’ performance (ESCO/Agency access to web based data) Large (tenant) installations energy billing/allocation

Metering Requirements Web-Based Utility Data

Advanced Metering Implementation in ESPCs Action Plan – Form FEMP/ESCO M&V work ESPC process integration Metering guidance input Pilot project

Other Metering Applications Identify metering plan for site – part of Save Energy Audits FEMP/Agencies –Offer REM like diagnostics of metered data for agency, cost of REM from Agency share of verified savings