Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Advertisements

Transport Canada Mineral Development Advisory Group (MDAG) Newmont Mining Corporation Hope Bay & Doris North Project Nunavut, October , 2010.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Baker Lake Community Information Session Public Hearing Decision September 1, 2009.
Mary River Project Early Revenue Phase NPC Oral Hearings January 2014.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
NUNAVUT IMPACT REVIEW BOARD Targeting Increased Effectiveness in a Changing Landscape Nunavut Mining Symposium, Iqaluit, April 17, 2012.
The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services Engineering and Design Considerations for the Americans with Disabilities.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Hope Bay Mining Ltd Doris North Project/ Phase II MDAG Meeting Oct 27, 2010 Cambridge Bay, NU.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Overview of Land and Resource Management in the NWT.
Kiggavik Project Final Hearing Presentation
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
Institutional Control Program Long Term Care and Control of Decommissioned Mine/Mill Sites Located On Crown Land Saskatchewan Ministry of the Economy April.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Overview – Phase 1 Doris North Project Changes and Phase 2 Hope Bay Project Proposal Mineral Development Advisory Group Meeting October 26-27, 2010 Chris.
ENVIRONMENTAL RISK MANAGEMENT AUTHORITY NGĀ KAIWHAKATŪPATO WHAKARARU TAIAO What is happening in 2005? Hazardous Substances.
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
Izok Corridor Project: Kitikmeot Community Visit
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
1 PARLIAMENT BRIEFING 08 AUGUST 2007 DRAFT NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE BILL.
Review of Interventions ____________ CanZinco Ltd.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
KNK5 wmoEp5 vtmp5 GwmoEp5H kNo1k5 ne6tbw5 ckE5]giz “A” wm6j5 Mwnodt5 W5J]y5 b5hjz X=8M8 xwC8 s/C4ys6t5 fxS]En8 GX=8M8f5H k9]l/4 WoExz Community Session.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
1 Application Process Gwich’in Land & Water Board WG 6 Document Review Prepared by Johnny Edwards.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Newmont Mining Corporation Welcome to the Mineral Development Advisory Group Meeting (“MDAG”) for Newmont Mining Corporation Cambridge Bay, Nunavut October.
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Overview of the NC Mining and Energy Commission Presented to the Environmental Management Commission January 10, 2013 Presented by: Tracy E. Davis, PE,
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Nunavut Water Board Public Hearing
Phase 2 Hope Bay Belt Project
Nunavut Water Board Technical Meeting & Pre-Hearing Conference
PUBLIC HEARING ANNOUNCEMENT
TMAC Resources January 28, 2016 Cambridge Bay
Recent Changes to Nunavut’s Regulatory System
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
NRC Export and Import Licensing 10 CFR Part 110
Nunavut Impact Review Board (NIRB)
Water Quality Rulemaking in Response to S.L
Environmental Assessment and Licensing (EAL) in Manitoba
National Radioactive Waste Management Agency Bill
Mary River Project Phase 2 Proposal Freshwater Environment
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)

Overview General Information General Information Current Licences Issued (HBML) Current Licences Issued (HBML) Typical Type A Process Typical Type A Process Project Specific Considerations Project Specific Considerations Amendments and Implications Amendments and Implications

General Information – Institution of Public Government established under Article 13 of the NLCA – Regulation, use, and management of water in the NSA – Nunavut Land Claims Agreement (NLCA), Articles 13 and 20 – Nunavut Waters and Surface Rights Tribunal Act (NWSRTA) c.10 – NWT Waters Regulations (NWTWR) (SOR/ ) – Nunavut Specific Water Regulations (Pending)

Current Licences Issued (HBML) 1.2AM-DOH0713 (Type A) – Term: September 19, 2007 to September 30, 2012 – Allows for the use of water and the disposal of waste in support of mining and milling activities 2.2BE-HOP0712 (Type B) – Term: May 20, 2007 to June 30, 2012 – Allows for the use of water and the disposal of waste in support of mining exploration activities

Current Licences Issued (HBML) (Cont.) 3.2BB-BOS0712 (Type B) – Term: July 6, 2007 to July 31, 2012 – Allows for the use of water and the disposal of waste in support of a bulk sampling program

Typical Type A Process Streamlined Coordinated Process for NIRB’s Part 5 Review and NWB Type A Water Licence Streamlined Coordinated Process for NIRB’s Part 5 Review and NWB Type A Water Licence Standard Process Standard Process

Application to NPC for conformity NIRB for Screening or Review NWB Issues Guideline to the Proponent NIRB Issue Project Certificate Revised Water Licence Application Review for Conformity to Guidelines Technical Review of the Application Pre-hearing/Technical Meeting Public Hearing NWB Decision/Licence to the Minister Minister Decision Licence Issued Enforcement and Compliance by INAC Processes governed by other IPGs’ NWB Licensing process for a Type A licence; may also apply to some Type B licences Figure 1: Typical Type A process

Process Time Lines NWB Issues Guideline to the proponent: 30 days NWB Issues Guideline to the proponent: 30 days Revised Water Licence Application: Applicant driven Revised Water Licence Application: Applicant driven Review for Conformity to Guidelines: 15 Days Review for Conformity to Guidelines: 15 Days Notice of Application / Technical Review, and Notice of Application / Technical Review, and Pre-hearing / Technical Meeting: 50 days Public Hearing: 60 day notice required Public Hearing: 60 day notice required NWB Decision/Licence to Minister: days NWB Decision/Licence to Minister: days Minister Decision: may take up to days Minister Decision: may take up to days Licence Approval by the Minister Licence Approval by the Minister Enforcement and Compliance by INAC: Ongoing Enforcement and Compliance by INAC: Ongoing

Project Specific Considerations – Confirm amount of fuel required and for what purposes – What project components require approval by June 2011 – Clarify the purposes for which water from Doris Lake will be used – Clarify the volume of waste rock generated and infrastructure to be constructed from the rock – Confirm whether the type A and type B licences will be amalgamated – Clarify the phases of the project

Amendments & Implications 2AM-DOH0713 (Anticipated amendment No.2) – Commence construction of additional fuel storage & containment facility by March 2011 – Approval to construct other components by June 2011 – Use of quarried rock during construction – Construct a short all-weather road bypassing airstrip and extend airstrip

– Change water source and pipe route from Doris Lake to Windy Lake – Construct secondary containment for Cyanide storage and relocate the storage – Use waste rock from underground mining activities to construct infrastructure 2AM-DOH0713 (Anticipated amendment No.3) – Expand waste rock and ore storage areas – Expand Doris North facilities – Renew Type A Licence to allow mining until 2017 – Increase domestic water consumption and construction of a water treatment plant

2BE-HOP0712 (Anticipated Amendments) 2BE-HOP0712 (Anticipated Amendments) – Carry out underground exploration of Doris and Madrid Deposit, Q4, 2011 – Develop infrastructure for Hope Bay Greenstone Belt including mining & milling for the Madrid and Boston deposit 2BB-BOS0712 (Anticipated amendments) 2BB-BOS0712 (Anticipated amendments) – Not stated

Additional Information NWB has developed Supplemental Information Guidelines for Mine Development (MM3) NWB has developed Supplemental Information Guidelines for Mine Development (MM3) Water Licence Application Process Guidelines 1 to 7, approved April 2010 (Guidelines 4, 5, 6 and 7 are of particular importance) Water Licence Application Process Guidelines 1 to 7, approved April 2010 (Guidelines 4, 5, 6 and 7 are of particular importance) NIRB/NWB Coordination Framework NIRB/NWB Coordination Framework

Contact Information Nunavut Water Board P.O. Box 119 Gjoa Haven, Nunavut X0B 1J0 Tel: Fax: Ftp site: Web Site:

Licensing & Technical Staff Executive Director: D. Filiatrault Executive Director: D. Filiatrault Director of Technical Services: D. Hohnstein Director of Technical Services: D. Hohnstein Manager of Licensing: P. Beaulieu Manager of Licensing: P. Beaulieu Licensing Administrator: R. Dwyer Licensing Administrator: R. Dwyer Technical Advisor: K. Kharatyan Technical Advisor: K. Kharatyan Technical Advisor: S. Joseph Technical Advisor: S. Joseph

Thank You Any Questions?