Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
Office of Science U.S. Department of Energy 1 The ILC Program Paul Grannis March 14, 2006 Much progress, much that could have gone wrong has not … but.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Global design effort 1-2 May 06 LCFoA Meeting Global design effort Americas 1 G. Dugan ILC/GDE and Cornell University LINEAR COLLIDER FORUM OF AMERICA.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
6-7 April 06 MAC Review Global Design Effort 1 The Global R&D Board Bill Willis GDE Columbia University.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global design effort Americas 20 April 06 P5 meeting 1 G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 ILC-Americas Regional Program.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
EDR Planning, Cost Review and Technical Risk Analysis
ILC Project Management Status
Report on plan to produce an Engineering Design Report
ILC Cavity & Cryomodule Overview
ILC Global Design Effort
Barry Barish GDE Caltech
Presentation transcript:

Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE

ILC MAC April 07 Global Design Effort 2 Americas Region Efforts & Resources ART Organisation Program Elements FY06 actuals FY07 actuals FY08 (presidential budget) Summary

Global Design Effort The Global Design Effort Mission Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, and a siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.) Global R&D program Reference Design Report (RDR) Engineering Design Report (EDR) Value estimate

ILC MAC April 07 Global Design Effort 4 ICFA FALC Resource Board ILCSC GDE Directorate GDE Executive Committee (EC) Global R&D Program RDR Design Matrix GDE R & D Board GDE Change Control Board GDE Design Cost Board GDE Organization ILC Design Effort ILC R&D Program

ILC MAC April 07 Global Design Effort 5 Organization of the ILC-Americas Program The work is broken down into a series of technically-based work packages, documented in MoU’s detailing the co-operative arrangement for the execution of work packages at each lab. Labs report financial status at the work package level quarterly, and technical status semi-annually. The program comprised ~93 work packages for FY06. In FY07, there are ~112 work packages. Starting in FY07, planning and prioritization of the work has been coordinated with plans of the GDE Global R&D Board. The work packages are organized in a WBS structure.

ILC MAC April 07 Global Design Effort 6 WBS structure-level 1 WBS 1: Management (GDE, ART, ILC lab groups) WBS 2: Accelerator design WBS 3: Accelerator R&D WBS 4: Technical Systems design and engineering WBS 5: Infrastructure and test facilities WBS 6: University accelerator R&D WBS 7: Regional Interest In FY08, WBS 4 and 6 will be integrated into WBS 2 and 3

ILC MAC April 07 Global Design Effort 7 WBS structure-level 2 WBS x.2: Global Systems (Commissioning and operations, global controls, installation, instrumentation and feedback, survey and alignment) WBS x.3: Electron sources WBS x.4: Positron sources WBS x.5: Damping rings WBS x.6: Ring to Main Linac WBS x.7: Main Linac: Optics and beam dynamics WBS x.8: Main Linac: RF systems WBS x.9: Main Linac: Cavities and Cryomodules WBS x.10: Beam delivery system WBS x.11: Conventional facilities and siting. x may be 1,2,3, 5, or 7:

ILC MAC April 07 Global Design Effort 8 ART WBS level 2 managers WBS x.2 Global systems:-J. Carwardine* (ANL), R. Larsen (SLAC) WBS x.3 Electron sources-A. Brachmann (SLAC)*, M. Poelker (Jlab) WBS x.4 Positron sources-J. Sheppard (SLAC)*, J. Gronberg(LLNL) WBS x.5 Damping rings-M. Zisman(LBNL)*, M. Palmer (Cornell) WBS x.6 Ring to Main Linac and WBS x.7 Main Linacs: Optics, beam dynamics, P. Tenenbaum (SLAC)*, N. Solyak (FNAL), WBS x.8 Main Linacs: RF systems-C. Adolphsen (SLAC)*, S. Nagaitsev (FNAL) WBS x.9 Main Linacs: Cavities and Cryomodules- S. Mishra (FNAL)*, H. Padamsee (Cornell)-SRF collaboration leader, J. Mammoser (JLab), M. Kelly (ANL) WBS x.10 Beam delivery system-A. Seryi (SLAC)*, B. Parker (BNL) WBS x.11 Conventional facilities-V. Kuchler (FNAL)*, F. Asiri (SLAC) * lead

ILC MAC April 07 Global Design Effort 9 ILC-Americas Regional Team Lab Leaders ANL-Rod GerigBNL-Brett Parker Fermilab-Bob Kephart, Shekar Mishra, Sergei Nagaitsev Cornell LEPP- Hasan Padamsee, Mark Palmer LBNL -Mike Zisman Jefferson Lab -Bob Rimmer, Warren Funk LLNL -Jeff Gronberg SLAC -Tor Raubenheimer, Nan Phinney, Tom Himel TRIUMF -Shane KoscielniakUniversities- Project Leaders

ILC MAC April 07 Global Design Effort 10 FY06 ILC plan and actuals: by machine area

Global Design Effort FY06 ILC plan and actuals: by lab In addition to the above, outside the ILC line, in FY06 FNAL provided a total of $17.4M ($5.4M M&S, $8.1M SWF) in support of SRF infrastructure and generic SRF R&D.

ILC MAC April 07 Global Design Effort 12 FY06 actual cost+commitments: Breakdown by Machine Area ~40% R&D ~20% infra+test facilities ~22% design ~5% engineering ~13% management

ILC MAC April 07 Global Design Effort 13 The FY07 ILC program in the US was aligned with the GDE priorities, and structured to conform to the GDE R&D S0, S1, S2 and RDR plans, to the extent possible on the required time scale. For technical R&D proposed in support of the US regional interest, input also came from the Ozaki panel, a body formed by the LCSGA to advise DOE on activities on regional interest efforts. A plan was developed for a $60M ILC budget. This plan was never used, as the appropriated FY07 ILC budget line was $42M (legislation enacted in Feb 2007). In Feb. 2007, the information on GDE priorities and regional interest was used to develop a $42M program. FY07 planning

ILC MAC April 07 Global Design Effort 14 FY06 ACTUALS VS FY07 PLAN-BY MACHINE AREA

ILC MAC April 07 Global Design Effort 15 FY06 ACTUALS VS FY07 PLAN-BY LAB In addition to the above, outside the ILC line, in FY07 FNAL is providing a total of $26.1M ($8.0M M&S, $9.6M SWF) in support of SRF infrastructure and generic SRF R&D

ILC MAC April 07 Global Design Effort 16 FY07 plans: Breakdown by Machine Area ~40% R&D, ~18% infra+test facilities, ~22% design, ~8% engineering, ~12% management

ILC MAC April 07 Global Design Effort 17 The President’s budget for FY08 has a funding level of $60M for the ILC line. Explicit support for the Detector R&D ($7M) included in this total. Starting in Feb. 2007, the WBS managers were asked to plan to this level for FY08. Final allocations determined after the FY07 budget became known. In addition to the above there is also generic SRF infrastructure and R&D projected at $23M. This funding is predominantly at Fermilab and has been aligned with the ART program at the request of the DOE. It contains support for a cryomodule string test facility, a new EP processing facility, single cell processing R&D, cavity performance analysis, materials research, test facility controls, and industrial development. Funding guidance for FY08

ILC MAC April 07 Global Design Effort 18 FY08 ILC plan, by general category

Global Design Effort FY08 ILC plan, by machine area

ILC MAC April 07 Global Design Effort 20 FY08 ILC plan, by Institution

ILC MAC April 07 Global Design Effort 21 ILC program element evolution, FY06-09 (ILC line only)

ILC MAC April 07 Global Design Effort 22 Summary ART funding support has increased each year since the ILC program inception ($33M -> $42M -> $53M, FY06 -> FY08). Alignment with the GDE global programs is receiving due attention from both the GDE and ART Significant effort in SRF infrastructure continues We will continue to modify the ART plans to reflect the GDE R&D program