5th Module: Evaluating Information Systems: Structure: 1.Reasons for IS Evaluation 2.Difficulty of IS Evaluation 3.Evaluation Techniques 4.Evaluation in.

Slides:



Advertisements
Similar presentations
4th Module: Information Systems Development and Implementation:
Advertisements

3rd Module: Information Systems Strategy and Planning:
1 Drafting a Standard n Establish the requirements n Agree the process n Draft the Standard n Test the Standard n Implement the Standard.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Why We Do Research Chapter 1. Ordinary Versus Systematic Biased Question: A question that leads to a specific response or excludes a certain group Nonscientific.
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
Baring Asset Management Limited 155 Bishopsgate, London EC2M 3XY Authorised and regulated by the Financial Services Authority Tel: +44 (0)
Pipeline Qra Seminar Title slide Title slide.
OECD/INFE High-level Principles for the evaluation of financial education programmes Adele Atkinson, PhD OECD With the support of the Russian/World Bank/OECD.
Self Directed Support What does it mean The Theory and the Practice Speaker: Ian Hood.
1 Investment Appraisal Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
Chapter 4 Design Approaches and Methods
Managing Learning and Knowledge Capital Human Resource Development: Chapter 11 Evaluation Copyright © 2010 Tilde University Press.
Financial Management 2BUS0197 Introduction to Module.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
Evaluation is a professional and ethical responsibility and is a core part of PHN professional practice Commitment to evaluation helps build the PHN intelligence.
Model Building and Simulation Chapter 43 Research Methodologies.
University of Sunderland CSEM04 ROSCO Unit 13 Unit 13: Risk Methods CSEM04: Risk and Opportunities of Systems Change in Organisations Dr Lynne Humphries.
1 Risk evaluation Risk treatment. 2 Risk Management Process Risk Management Process.
CISB444 - Strategic Information Systems Planning
HFSD User Involvement Whilst the need to involve users in the SAD process is accepted to a greater or less extent in all design methods - the decision.
Miguel Martins, Senior Lecturer – Marketing Department eLearning Celebration 22 July 2007 Improving performance on a Marketing module through the use of.
Portfolio Selection of IT Service Products – Case Study Antti Vikman
Marketing Performance Metrics
Total Quality, Competitive Advantage, and Strategic Management
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE © 2003 Pearson Education Canada Inc.20.1.
CHAPTER 4 Negotiation : Strategy and Planning
MODULE 4 MARKETING STRATEGY A2 Marketing and Accounting and Finance Marketing Decision-making.
Second World Congress on Positive Psychology (July 23-26, 2011; Philadelphia, Pennsylvania, USA) Choice as self-orientation activity in real life situations.
Product Evaluation the outcome phase. Do the magic bullets work? How do you know when an innovative educational program has “worked”? How do you know.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
AS Business Studies Budgets Today you will know what a budget is. You will understand why budgets are set and you will apply this to the case study Unit.
IN THE NAME OF GOD Flagship Course on Health Sector Reform and Sustainable Financing; Module 4: : How to construct.
IB Business and Management
Risk and Human Health. Environmental Risk Analysis Comparing the risk of a situation to its benefits Allows people to evaluate and deal with consequences.
 Explain the importance of a personal budget  Describe how budgeting helps businesses manage their finances  Display understanding of how forecasting.
Managing Learning and Knowledge Capital Human Resource Development: Chapter 4 HRD Needs Investigation: An overview Copyright © 2010 Tilde University Press.
Module 4: Systems Development Chapter 12: (IS) Project Management.
 2008 Johns Hopkins Bloomberg School of Public Health Evaluating Mass Media Anti-Smoking Campaigns Marc Boulay, PhD Center for Communication Programs.
SPIN Benchmarking The product planning phase contains all steps that are necessary to develop a good design brief for further product development in phase.
Personal Budgets. Introduction Name Andrea Woodier Organisation Leicestershire County Council Telephone number address
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Concepts of Management for Security Dr Teri McConville Defence Management Group Cranfield University Defence Academy of the United Kingdom.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Market research for a start-up. LEARNING OUTCOMES By the end of this lesson I will be able to: –Define and explain market research –Distinguish between.
How to Satisfy Reviewer B and Other Thoughts on the Publication Process: Reviewers’ Perspectives Don Roy Past Editor, Marketing Management Journal.
Strategy: Analysis and Practice Slide 1/1 ©The McGraw-Hill Companies, 2005 Chapter 14. Risk, uncertainty and strategy.
Measuring IT Innovation Benefits. Evaluation of IT innovation Why measure IT benefits? A new IS/IT system is an investment; it must be strategically/financially.
EVALUATION AND SELECTION Chapter 6. Objectives Upon completion of this chapter, you should be able to: Critically understand the process of strategy evaluation.
Goal Setting Why Should You Use Goal Setting?. What is a Goal Anyway? Goal is: the end toward which effort is directed. Goals are not dreams and wants.
Interest-Based Bargaining.  Interest-based bargaining involves parties in a collaborative effort to jointly meet each other’s needs and satisfy mutual.
1 James O’Connor ACCA P3 Business Analysis James O’Connor.
Reflective Thinking. Reflective thinking Critical thinking and reflective thinking are often used synonymously. However, where critical thinking is used.
1 Evaluating the User Experience in CAA Environments: What affects User Satisfaction? Gavin Sim Janet C Read Phil Holifield.
Copyright © 2007 Pearson Education Canada 1 Chapter 8: Materiality and Risk.
IB Business & Management
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
Dr Jane Tonge Senior Examiner
Linking L&D to Strategy A practical guide. Linking L&D to Strategy It’s easy – all you need is to:  Understand the strategic context.  Know your organisational.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
12 Automatic enrolment myths & truths This guide to automatic myths and truths contains some of the misconceptions we have come across when speaking to.
Chapter 3 REVIEW How Can You Measure the Impact of your Strategic Map Over Time?
Quantitative Methods for Business Studies
Strategic Information Systems Planning
Contents A GENERIC IT BALANCED SCORECARD
Econometric analysis of the benefits of early legal advice
Econometric analysis of the benefits of early legal advice
Chapter 21 Formal Reports
RISK MANAGEMENT MARKET & SOCIAL RESEARCH
Presentation transcript:

5th Module: Evaluating Information Systems: Structure: 1.Reasons for IS Evaluation 2.Difficulty of IS Evaluation 3.Evaluation Techniques 4.Evaluation in an Organisational Context

Reasons for IS Evaluation IT costs organisations a lot of money. Evaluation is necessary in order to see whether the money was spent in the right way, and to make sure that the right investments are made in the future. In the 1990s, for example, the average UK company spent 5 percent of their total costs on IT. In the financial sector, IT consumed up to 20 percent of the total cost.

Typically, there are 2 main occasions for evaluation: 1.Before the system works: there might be a choice of alternative designs, software packages, etc. Assessment of these alternatives, e.g. as part of the business analysis or feasibility study, can be seen as evaluating a number of investment options.

Typically, there are 2 main occasions for evaluation: 2.Once the system works: Evaluation whether the expected benefits can be achieved, whether the investment was worthwhile (=summative evaluation at the end).

There are other occasions when evaluation is needed, e.g. to review an information system under development (continuous checks=formative evaluation), to find out about the total IS costs of a particular application, to assess the value that is added by a particular IS application. The main aim of many organisations is that the benefits of an IS application outweigh the costs.

The Difficulty of IS Evaluation The difficulty arises from the fact the costs and benefits are very difficult to identify and to measure. Costs can be classified better than benefits, because it can be added up what was spent to get a new IS application up and running. However, there are difficulties as well, because often IS resources are shared and accountants do not always agree about how costs for shared resources should be allocated.

Assessing the benefits is even more difficult. Benefits can be an improvement in terms of efficiency and effectiveness (which is a subjective criterion and thus evaluated in different ways by different people). Effectiveness is therefore a qualitative criterion (i.e. it cannot be measured by quantitative measures such as monetary costs/gains, etc.). What does qualitative mean in this context? Other qualitative criteria are (beautiful, nice, rude, etc.). Quantitative criteria (6 foot tall, 200 pounds, etc.).

Because of the difficulties to evaluate the success of IS systems, IS professionals avoided performing detailed evaluations of IS in the past. According to Ginzberg and Zmud (1988),the most difficult criteria are: systems do not have adequate initial descriptions of success and failure evaluation must also take social aspects into account, which might benefit the organisation on other levels evaluation is subjective, because individuals have different judgments about benefits even if the system objectives could be set, they would differ from the final objectives because IT is a rapidly evolving field.

Evaluation Techniques Nevertheless and in spite of these difficulties, an increasing number of organisations asks for a formal evaluation of information systems. Many of the techniques discussed in IS Strategy and Planning (Chapters 2 and 3) are considered evaluative techniques (e.g. individual pharmacies survival on the market).

Evaluation in an Organisational Context IS evaluation is complex and takes a lot of time. The outcome is often a report submitted to the senior management, which needs to authorise IS investment, but does not necessarily understand much about it. Any decision thus remains a political one (does the senior management has a good attitude towards its IS staff) Traditional cost/benefits analyses are often understood by the management.

It is often hard to tell the management that traditional cost/benefits analyses are very difficult to achieve in an IS environment. Traditional other approaches often fail to take knowledge or information into account at all. Some authors think that information is practically impossible to quantify (e.g. Kaplan and Norton, 1992). Consequently, there is often a gap between senior management (who rarely have adequate IS knowledge) and people responsible for IS.

Because the relationship between senior management and IS experts is based on trust, the probability of a senior manager accepting an evaluation is often dependent on how favourably inclined s/he is towards the system in principle.

References: Duncan, W.M. (1997). Information Systems Management. London: University of London Press. Ginzberg, M.J. & Zmud, R.W. (1988). Evolving Criteria for Information System Assessment. In N. Bjorn-Andersen & G.B. Davies (Eds.): Information Systems Assessment: Issues and Challenges. New York: North-Holland.

Kaplan, R.S. & Norton, D.P. (1992). The Balanced Scorecard – Measures that Drive Performance. Harvard Business Review, 1, The references for students who are interested in further reading can be found on page 17 of the study guide.