Ria Thompson, DenDesignery +647 500 6518 PARTITION INSTALLERS SPECIFICATION CADL03/6207, HND Stage 1, Final Project.

Slides:



Advertisements
Similar presentations
Support.ebsco.com EBSCOhost Collection Manager Approver Account Functions Tutorial.
Advertisements

© Copyright 2004 United Parcel Service of America, Inc. UPS, the UPS brandmark, and the color brown are registered trademarks of United Parcel Service.
Back Office Tutorial Basic Navigation New Consultant Sign Up Shopping.
Homes.
Cisco 6500 E-Series Chassis Up-grade
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Without reference, identify principles relating to Intraoral X-Ray with at least 70 percent accuracy.
Ria Thompson, DenDesignery KITCHEN FITTERS SPECIFICATION PROJECT DETAILS NAME: 3-Bedroom Detached.
FLOORING SPECIFICATION Ria Thompson, DenDesignery CADL03/6207, HND Stage 1, Final Project 1 PROJECT.
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
ICRA Panel System Installation Instructions
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
CADL03/6207, HND Stage 1, Final Project
BATHROOM INSTALLERS SPECIFICATION Ria Thompson, DenDesignery CADL03/6207, HND Stage 1, Final Project.
Chapter 19 Electrical Plans.
Components Connection Jig Graph Paper (#4101) Mounting Blocks (#5902) Nails Tape Measure Pen Hammer Customer Coordinates.
Same mold in both front and back panel for reduced cost in mold making. Lip creates material for fasteners that will hold case together. LCD fits in with.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Customer Care: How to Order Replacement Parts Using RPP.
Presentation Template
Architectural Drawings
SITE SUPERVISION (CITADEL TOWER)…………….…1 SITE SUPERVISION (CITADEL TOWER)…………….…1 DESIGN OF A 3 BEDROOM STOREY BUILDING…..2.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Ria Thompson, DenDesignery UNDER-STAIRS BUILT-IN STORAGE CONCEPT CADL03/6207, HND Stage 1, Final.
2-Bedroom Retro Aparment Window Treatment Specifications.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
INTRUSION ALARM TECHNOLOGY
KW Agent Technology Training Using the KWLS. What We Will Discuss Navigating the KWLS. The Benefits of the KWLS. ListHub 101. How to get automatic imports.
Finishing the Building
Setting Up an on-line Store Tutorial Using SmartStore.biz This Tutorial assumes you have downloaded the software from This Tutorial.
MSHDA’s Web Site LIHTC Information Available at
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Home Furnishing By: Tala Nahhas (: Grade: 9B. Project Outline The system in this “application” will be able to provide the user with 5 different home.
2014 AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Objective 4.04 Paint Wallpaper Chapter 24. Types of Paint Latex- or water based paint Quick drying This paint is easy to apply however it does not adhere.
2014 AIA Jacksonville Design Awards ( Un-Built-General Category) Instructions Slide Upon downloading file from your please save file as submittal.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Ria Thompson, DenDesignery WINDOW TREATMENTS SPECIFICATION CADL03/6207, HND Stage 1, Final Project.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
CONTRACT * ___________ Office/Corporate – 14,999 sf and under ___________ Office/Corporate – 15,000 to 34,999 SF ___________ Office/Corporate – 35,000.
Residential Floor Plans
2014 AIA Jacksonville Design Awards (Craftsmanship Category) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
Section 7 Retail Establishments Section 17 Restaurants Section 35 Tables and Seating ID 234 Building Codes Accessibility.
20 Chapter Stair Construction. 20 Chapter Stair Construction.
Interior Design I final design project. You own your own interior design firm and 2 clients come in. They are in their mid 50s and have 6 children. All.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
IDEAS Interior Designer & Architects Contact Person-Mr. Manish Grover Address :Off.No-2,1st Floor, KD Market,Pitampura, Delhi Mobile No : (+91)
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
7/11/2016 Safe Nights of Calvert County. 7/11/2016 Safe Nights of Calvert County.
Lighten Up! Single Window Kits Add Light and Appeal To Home Bathrooms.
Installation Walkthrough Image Guide
Corner Stone Granite and Tile
Agenda Item 2: Catch up session 15 May 2017
AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide
Standard Operating Procedure
House Cleaning Services by Neat Cleaning Services in Chicago
[Project Name] One-Line Drawing
Chapter 19 Electrical Plans.
Ayazmobg Furniture Systems.
Welcome to HOUSING CONNECTIONS TRAINING 03 Supplementals
ONLINE APPLICATION GUIDELINES FOR INBOUND EXCHANGE PROGRAM 2019 SPRING SEMESTER OFFICE OF INTERNATIONAL AFFAIRS Ⅰ GLOBAL COOPERATION TEAM.
Building a Foundation.
E-Books: A Mobile Friendly Choice
Welcome to HOUSING CONNECTIONS TRAINING 03 Supplementals
Safe Nights of Calvert County
***Please Remove This Slide From Your Final Presentation***
Presentation transcript:

Ria Thompson, DenDesignery PARTITION INSTALLERS SPECIFICATION CADL03/6207, HND Stage 1, Final Project 1 PROJECT DETAILS NAME: 3-Bedroom Detached House Show Home SITE ADDRESS: CLIENT NAME: CONTRACTOR DETAILS NAME: ADDRESS: PHONE office: mobile: GENERAL INSTRUCTIONS and PREPATORY NOTES 1/Please review this specification, the reference drawings and schedules and contact me as soon as possible with any issues or questions. 2/This specification has separate sections for each of the partitions to be installed: Section 2 for the partition designated for the Downstairs Bathroom (Ground Floor), and Section 3 for the partition designated for the Shower Room (First Floor). 3/Important scheduling note for coordination with the flooring contractors: Both partitions must be installed after the vinyl floors in both bathrooms have been installed. 4/Please carry out all work with appropriate care taken so that no damage is inflicted on the newly installed floors. 5/No substitutions are to be made unless agreed upon ahead of time. 6/The specific manufacturer’s instructions are to be followed in each case. 7/As much as possible, please leave the work areas in a tidy fashion at the end of each day. All rubbish is to be promptly removed from the site.  MAIN DETAILS

Ria Thompson, DenDesignery PARTITION INSTALLERS SPECIFICATION CADL03/6207, HND Stage 1, Final Project 2 PRODUCT DETAILS Ref ID withi n room TYPEBRAND / SUPPLIE R NAMECODE / REFCOLOU R DIMS INFO (mm)REFERENCE DRAWING INSTALLATION NOTES and WWW LINKS 4Partition3formVaria Ecoresin /Organics / Criss Cross Installation Solution Code for Top Support Suspended Partition: White, brown Gauge: 12.7 (1/2”) Custom sized: 900W x H (4”) is the allowance for fitting the top and bottom hardware channels that will hold the partition in place [Panel height(2298.4) = Opening height(2400) – 4”]. (D5) Painter/Decorat or/Installer - Ground Floor (See label on drawing) Product info: form.com/materials/varia_ecoresin/organics/criss_ cross/#4 To be installed using the Top Support system with surface mounted (to floor and ceiling) hardware channels. For more info: form.com/ready_to_go/partitions/200.25/ Detailed installation instructions: form.com/downloads/3form_harspec_topsupport_ Man-026_Rev006.pdf Please see this manual for instruction on how to trim the panel if any height adjustment is necessary: form.com/downloads/3form_Varia_Fabrication_Ma nual_REV007.pdf  DOWNSTAIRS BATHROOM

Ria Thompson, DenDesignery PARTITION INSTALLERS SPECIFICATION CADL03/6207, HND Stage 1, Final Project 3 PRODUCT DETAILS Ref ID withi n room TYPEBRAND / SUPPLIE R NAMECODE / REFCOLOU R DIMS INFO (mm)REFERENCE DRAWING INSTALLATION NOTES and WWW LINKS 4Partition3formVaria Ecoresin /Wood / Zebrano Chevron Installation Solution Code for Top Support Suspended Partition: BrownGauge: 12.7 (1/2”) Custom sized: 900W x H (4”) is the allowance for fitting the top and bottom hardware channels that will hold the partition in place [Panel height(2298.4) = Opening height(2400) – 4”]. (D6) Painter/Decorat or/Installer – First Floor (See label on drawing) Product info: form.com/materials/varia_ecoresin/wood/zebrano_ chevron/ To be installed using the Top Support system with surface mounted (to floor and ceiling) hardware channels. For more info: form.com/ready_to_go/partitions/200.25/ Detailed installation instructions: form.com/downloads/3form_harspec_topsupport_ Man-026_Rev006.pdf Please see this manual for instruction on how to trim the panel if any height adjustment is necessary: form.com/downloads/3form_Varia_Fabrication_Ma nual_REV007.pdf  SHOWER ROOM