André van Es 2 nd SKADS Workshop October 2007 Review of deliverables Three levels of deliverables: Level 3: Deliverable at Tasks Level 2: Deliverable at Design Study Level 1: Deliverable at Project Level 0: Deliverable at Board Level We present progress in terms of the Level 0 deliverables
André van Es 2 nd SKADS Workshop October 2007 DS-1ASTRON University of Manchester Observatoire de Paris DS-2 Rijks Universiteit Groningen ASTRONINAF-IRAMPIfR Universidad de Valencia CSIROSwinburne Leiden Observatory ChalmersOxford University of Manchester Observatoire de Paris Cambridge University of Melbourne Natal University PRAO-LPI University of Leeds University of Glasgow University of Adelaide DS-3 University of Cambridge ASTRON University of Manchester CSIROINAF-IRA University of Oxford Cambridge University Observatoire de Paris National Research Foundation DS-4 University of Manchester ASTRON Observatoire de Paris INAF-IRAFG-IGN University of Oxford CSIRO National Research Council University of Cambridge University of Orléans CNRSOMMIR DS-5ASTRON University of Manchester Observatoire de Paris JIVEINAF-IRAMPIfR Oxford University CSIRO National Research Foundation UMK University of Cambridge OMMIC DS-6INAF-IRAASTRONJIVECSIRO Univ. Sydney DS-7: University of Manchester, Observatoire de Paris
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-1
André van Es 2 nd SKADS Workshop October 2007
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-2
André van Es 2 nd SKADS Workshop October 2007 A Report and Proceedings...
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-3
André van Es 2 nd SKADS Workshop October 2007 SKADS Design & Costing Paper (SKA Memo 93)
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-4 Nominal Completion Date Planned Completion Milestone DS dec-06 done SiGe band pass filter using PIC technology prototype DS dec dec-08 ADC performance evaluation DS4 3 1-jul-07 1-jul-08 Hybrid LNA first devices DS4 4 1-jul-06 1-jul-08 Inventory of RFI mitigation techniques and applicability to SKA DS4 5 1-jul-07 1-jul-08 Evaluation of impact of moving interference sources on SKA DS okt-07 1-mrt-08 Characterised antenna element DS4 7 1-mrt-08 1-jul-08 antenna element with integrated MMIC prototype DS4 8 1-jul-07 1-mrt-08 Simulated Digital beamformer for 2-PAD DS dec-06 done Prototype low cost SiGe analogue beamformer DS dec-08 2-feb-09 Prototype complete 2-PAD digital tile DS jun jun-09 Final reports on semiconductor technologies, RFI mitigation strategies, antenna element design, digital beamformer design 2-PAD performance (T1-T6)
André van Es 2 nd SKADS Workshop October 2007 Prototype of Low Cost SiGe Beamformer
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-5
André van Es 2 nd SKADS Workshop October 2007 EMBRACE 10 tile prototype
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-5
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-6
André van Es 2 nd SKADS Workshop October 2007 BEST Report on optical links
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-7 Task number Deliverable No Deliverable Name Planned (in months) Achieved (in months) DS7-T1 1 SKADS Quarterly Report Q4/ DS7-T1 2 SKADS Quarterly Report Q1/ DS7-T1 3 SKADS Quarterly Report Q3/ DS7-T1 4 SKADS Quarterly Report Q4/ DS7-T1 5 SKADS Quarterly Report Q1/ DS7-T1 6 SKADS Quarterly Report Q3/ DS7-T1 7 SKADS Quarterly Report Q4/ DS7-T1 8 SKADS Quarterly Report Q1/ DS7-T Annual Report to International SKA Project Office DS7-T Annual Report to International SKA Project Office DS7-T Annual Report to International SKA Project Office 24 25
André van Es 2 nd SKADS Workshop October 2007 A Quarterly Report...
André van Es 2 nd SKADS Workshop October 2007 Updated Plan Prior to 2 nd Annual Report project planning was updated All Design Studies submitted new milestone/deliverable table New milestone dates were discussed and agreed with DS leaders SKADS on track to finish on 30 th June 2009
André van Es 2 nd SKADS Workshop October 2007 Deliverables/Milestones planned (update 2 nd annual report)
André van Es 2 nd SKADS Workshop October 2007 Next 18 months (major milestone for each DS) DS2: Final Report on SKA configurations DS 3: –Implementation of Cost and Functional simulator tool –Selection of networking and computing technologies DS 4: Completion of 2-PAD design DS 5: Build and first testing of EMBRACE at Westerbork and Nancay (100 tiles) DS 6: BEST demonstrating beamforming and Hl sensitivity astronomical tests DS 8 : First iteration of Overall System Design and Project plan
André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS 8 Design Study 8 produces the major deliverables of the project (the focal and cohering point of SKADS): 1.Overall System Design 2.Preliminary SKA Plan 3.White Paper for the ISSC It is the collection of all activities and will show and establish the direction towards the SKA