Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Force and Pressure 1.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Getting there in comfort
ENGINE CONSTRUCTION.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Pneumatic Cylinders Chapter 3.
Coordinate Plane Practice The following presentation provides practice in two skillsThe following presentation provides practice in two skills –Graphing.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
ZMQS ZMQS
Sectional Assembly and Installation
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
T-Flex Fitting Instructions 1 Rev
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
KYMV060C4 2 BY 2 MPDP INSTALLATION GUIDE KINGYOO Electronics., LTD.
Zebra® 105SL™ * Removing and Installing Printhead
O X Click on Number next to person for a question.
© S Haughton more than 3?
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
This, that, these, those Number your paper from 1-10.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Automotive Engines Part 3 (internal Parts).
Week 1.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Disassemble, Assemble and Perform a Function Check on the M16/M4
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Slide HALLD TAGGER MAGNET STRUCTURAL ANALYSIS Presented by William Crahen 6/10/09 Pole Plate analysis Vacuum chamber analysis Vacuum chamber tie rods and.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
STEP 1: ASSEMBLE ANGLE PLATES
The design schemes of the low field dipole magnets
MICE Partial Return Yoke Mechanical Design
STEP 1: ASSEMBLE ANGLE PLATES
Presentation transcript:

Tagger and Vacuum Chamber Assembly Procedure

Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.

Assembly procedure. 1. Place bottom yokes on support stands.

2. Attach bottom pole shoes to bottom yokes.

3. a) Attach brackets, for supporting the weights of the lower coils, to the lower pole shoes. b) Attach fittings, which take the O-ring compression rods, to the lower pole shoes.

4. a) Place lower coils round lower pole shoes. b) Attach brackets, which counteract magnetic forces on lower coils, to the lower pole shoes. c) Position O-rings on top of lower pole shoes. d) Attach O-ring compression spacers to the top of lower pole shoes. [ The spacers are aluminum strips- 7mm(height) *5 mm*5mm screwed to the pole shoe vacuum seal lip.]

5. a) Attach vacuum O-ring compression rods and fittings to lower surface and side walls of vacuum chamber. b) Position vacuum chamber around the bottom pole shoes. c) Tighten vacuum O-ring compression rods until O-ring compression is defined by the O-ring compression spacer.

6. Place magnet gap spacers on top of lower pole shoes.

7. a) Attach O-rings to upper pole shoes. b) Attach O-ring compression spacers to upper pole shoes. c) Position upper pole shoes on magnet gap spacers.

8. a) Attach O-ring compression rods and fittings to upper surface and side walls of vacuum chamber. b) Attach fittings, which take the O-ring compression rods, to the upper pole shoes. c) Attach brackets, which support weights of upper coils and counteract magnet forces on upper coils, to upper pole shoes. d) Tighten O-ring compression rods until O-ring compression is defined by O-ring compression spacers.

9. Place upper coils around upper pole shoes.

10. Attach back yokes to bottom yokes.

11. Attach top yokes to back yokes.

12. a) Install the upper and lower vacuum chamber support arms. b) Remove spacers between pole shoes. The chamber is now ready for vacuum testing.

Support Stands. 13. Side view of the support stand for one of the dipole magnets.

14. Top view of the support stand for one of the dipole magnets.

15. Top view showing lay-out of support stands for both dipole magnets.

16. Complete assembly.

Alignment. 17. Template for defining relative position of the two dipole magnets.

18. Alignment marks for defining the absolute position of the dipole magnets in the Tagger hall. Red - incoming beam (first magnet). Grey -2 GeV electrons. Blue - main beam exit from first magnet, and its extension to the second magnet. Green-7 GeV electrons. Magenta- Main beam exit.

19. Top view of alignment trajectories showing alignment points on both dipole pole shoes and the floor of tagger building.

The tagging spectrometer has been designed so that the complete system can be assembled on the support stands, at the manufacturers, where magnetic field and vacuum tests should be carried out. The vacuum tests should use a blanking flange on the tagger exit window. The spectrometer should then be taken apart, transported to Jlab and re-assembled. The magnetic field and vacuum tests should then be repeated firstly with the blanking flange and then with the proper window.