NRCS 2009 CCA Update October 20, 2009 Slide 1. Key Updates TSP Streamlining TSP Proficiency Criteria TSP Payment Rates Nutrient Management Integrated.

Slides:



Advertisements
Similar presentations
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Advertisements

OPERATING EFFECTIVELY AT WESD. What is Internal Control? A process designed to provide reasonable assurance the organizations objectives are achieved.
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
SAJAYA ® PARTNERSHIP… PARTNERING FOR SUCCESS. SAJAYA ® APPLICATIONS... SAJAYA ® is a new era in the world of software applications targeted for the Middle.
More CMM Part Two : Details.
INITIATIVES & STRATEGIES
Conservation Delivery Streamlining Initiative October 2011 Dave White Chief, USDA-NRCS Streamlining Delivery of Conservation Assistance For more information:
Pest Management for NRCS Conservation Planning Barbara Stewart, State Agronomist, NRCS.
Environmental Management Systems An Overview With Practical Applications.
Managing the Information Technology Resource Jerry N. Luftman
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Software Asset Management
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Contractor Certification Mike Cox State Conservation Engineer.
ONC Policy and Program Update Health IT Policy Committee Meeting July 9, 2013 Jodi Daniel Director, Office of Policy and Planning, ONC 0.
Wisconsin Technical Service Providers (TSP) Plan.
Harnessing Marketplace Power to Improve Health, Environment and Economics Grower Opportunities for Integrated Pest Management Through USDA NRCS Conservation.
Acquisitions, a Publisher’s Perspective Craig Duncan Development Manager External Development Studio Building the partnership between.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Introduction to the GI system. Origin Linked Products (OLP) are products that have a specific link to their area of origin because of their reputation.
PlatinumAgri Pty. Ltd. Consulting Services Overview.
The Institute of Internal Auditors
FY 2007 Conservation Reserve Program (CRP). Conservation Reserve Program Topics Agency Roles and Responsibilities Agency Roles and Responsibilities CRP.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
October 30, 2007 TSP Pre-Planning Meeting & Information.
Ohio ABLE’s Distance Education Initiative. Phase I-Exploring Distance Education FY ❑ Involvement with Project IDEAL (2003 – 2006) ❑ Pilot programs.
WHAT IS AN EFFECTIVE TEACHER? Copyright © Texas Education Agency, All rights reserved. 1.
WQ Partnership September 5 th,  26 grant and loan programs  1,138 active agreements totaling $954M as of June 2012  450 new grant and loans totaling.
Our Mission Helping people help the land. NRCS Natural Resources Conservation Service Our Vision Productive Lands ---- Healthy Environment.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Reduce Costs, Gain Control, and Improve Processes Insert Date Insert Client Logo.
Visit us at E mail: Tele:
Norm Leppla, UF, IFAS, IPM Florida, Dan Sonke, Protected Harvest & Tom Green, IPM Institute of North America Increasing Adoption of IPM in the Production.
TechReg and TSP Orientation CNMP Core Curriculum Section 10 — TSP Certification and TechReg.
QUALITY MANAGEMENT STATEMENT
Advance Planning Briefing for Industry 10 October 2008 Mr. Chuck Comaty.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
MOA-Track Updates Certified Professional Training October 27, 2015.
Kg P per county (1000) > < 45 Figure 4 Estimated P production from confined livestock. kg N per county (1000) > 908 Figure.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Procurement to Pay (P2P) Initiative March 2014 “Supporting and Enabling Strategic Sourcing”
State of Georgia Release Management Training
May 2001, Istanbul Workshop Production Certification Process Status Jack Fowler.
Planning Personnel Department May 29, 2003 John UptonNicole Bennett.
Employee Orientation to ISO Sygnetics, Inc. is committed to quality. ‘Quality’ is the ability to consistently produce a product or service that.
NRCS Update Interagency Nutrient Management Conference 2015.
Aircraft Fleet Management Solutions
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
APTA Rail Transit SMS Implementation Guide June, 2016.
DoD Preferred Contract Vehicle This quote is provided pursuant to the Blanket Purchase Agreement (BPA) awarded under the DoD ESI program. Under.
110/15/2014USDA-NRCS Conservation Delivery Streamlining Initiative.
CAROL BISHOP RISK MITIGATION IN EDIBLE HORTICULTURAL PRODUCTION SYSTEMS.
LRC Network Planning for Records Management improvement Kathryn Dan, GM University Records and Policy.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
Better Commissioning Better Services Better Outcomes - The Leeds Approach.
Overview of Environmental Management Systems Using ISO John Rupe Forest Service Rocky Mountain Region.
Business Development Division Update BCC Presentation April 26, 2011 BCC Presentation April 26, 2011.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 6, 2009 I n.
Critical Situation Management, Inc. Automating Response Processes with 4 command ™
Serving Those Who Served
SUPPLIER PARTNERSHIP 2.
Transition ISO 9001:2008 to ISO 9001:2015
Presentation transcript:

NRCS 2009 CCA Update October 20, 2009 Slide 1

Key Updates TSP Streamlining TSP Proficiency Criteria TSP Payment Rates Nutrient Management Integrated Pest Management Slide 2

TSP Streamlining Outsource TSP Application and Certification Process –Explore the potential to outsource TechReg –Take applications –Evaluate applications –Approve certifications –Updates to certifications –Would still use certifying organizations Slide 3

TSP Streamlining Create Training Templates for States to use for training TSP –National training templates for state use –May reduce on-line training Slide 4

TSP Streamlining Evaluate On-line Training Requirements –Evaluate AgLearn –Promote more on-site or in person training –Reduce frustrations Slide 5

TSP Streamlining Establish Mentoring Opportunities –Assist new TSPs –Experienced personnel on a fee-basis Slide 6

TSP Streamlining National TSP State Coordinator Training –Provide training to NRCS state coordinators –Update on policy and procedures –Maintain consistency Slide 7

TSP Streamlining Acquisition Of TSP Services –Explore acquisition options Blanket Purchase Agreements (BPA) Indefinite Delivery Indefinite Quantity –Minimize landowner time and ease for TSP Slide 8

TSP Streamlining TSP Payment Rate Issues –Revise and Evaluate the Technical Services Payment Rate Process Market based – Fair and Reasonable Slide 9

TSP Streamlining Quality Assurance –Automate with the NRCS contracting and payment processes –Determine who and what will be checked for quality assurance –Open and transparent. Slide 10

TSP Streamlining Implementation Of The Plug In Tool –Allow TSP access to the client records to do planning and application documentation Slide 11

TSP Streamlining Training Documentation –Automate so when training is completed it is uploaded into the TSPs records TechReg Improvements To Track Certification Updates –Improve the ease and approval of updates Adding new certiifcations Slide 12

TSP Proficiency Criteria National Criteria –Exception state licensing requirements Considering Certification Categories –Evaluate existing categories –Do we need new categories –Can we combine some categories –Revise or simplify Slide 13

TSP Payment Rates Continue review to be representative of the local or geographical area. Slide 14

Nutrient Management Revisions to 590 Nutrient Management –Adaptive Management –Precision / Variable Rate Plan Criteria –Soil Test Phosphorus levels for manure application Slide 15

(595) Integrated Pest Management Previous (595) Pest Management Focus on mitigating risk of pest control –Cultural –Biological –Chemical Focus on IPM concepts Slide 16