CMS Experiment CMS Hadron Calorimeter - Arie Bodek

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
HCAL TB2002 CPT Week, CERN, 05-Nov-2002, S.Kunori1 HB TB2002 Some Results Shuichi Kunori Jordan Damgov 05-Nov-2002.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
Arie Bodek/P de Barbaro, CMS Activities at Rochester, DOE Review, August 11, CMS-HCAL Rochester activities Arie Bodek/ P. de Barbaro University of.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
CMS Experiment CMS Hadron Calorimeter - Arie Bodek
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Application of Neural Networks for Energy Reconstruction J. Damgov and L. Litov University of Sofia.
Calorimeters A User’s Guide Elizabeth Dusinberre, Matthew Norman, Sean Simon October 28, 2006.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
We observe two classes of anomalous signals in HCAL 2) Cherenkov light produced by interactions in the window of the Forward Calorimeter PMTs ¼ photoelectrons.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
EXAMINATION OF CORRUPTED DATA IN THE TILE CALORIMETER Stephanie Hamilton Michigan State University The ATLAS Collaboration Supervisor: Irene Vichou (U.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
May 1-3, LHC 2003V. Daniel Elvira1 CMS: Hadronic Calorimetry & Jet/ Performance V. Daniel Elvira Fermilab.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
The Compact Muon Solenoid. What does CMS do? The Compact Muon Solenoid is a general purpose particle detector installed at point 5 of the Large Hadron.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
ATLAS Tile Hadronic Calorimeter:
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
R.S. Orr 2009 TRIUMF Summer Institute
first results from EMCal test beam
First CMS Results with LHC Beam
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
J. Freeman Erice Oct 3, Hadron Calorimeters Hadron Calorimetry For Future Hadron Colliders Jim Freeman Fermilab.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
CMS ROC Report Patricia McBride May 26, 2005.
Scintillation Detectors in High Energy Physics
Test Beam Request for the Semi-Digital Hadronic Calorimeter
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
NRC Kurchatov Institute, ITEP I. Korolko, M.Prokudin, Yu.Zaitsev
HCAL M&O-B Budget CMS Finance Board
CMS ECAL Calibration and Test Beam Results
LC Calorimeter Testbeam Requirements
Presentation transcript:

CMS Experiment CMS Hadron Calorimeter - Arie Bodek University of Rochester DoE Review (15 min Talk) - Wednesday, July 23, 2003 I will only talk about Rochester contributions We==Rochester CDF Plug Upgrade/CMS-HCAL Task D Group) Brief History - Rochester CDF-Plug Upgrade Group We invented Megatile-Tile-Fiber Technology for CDF We built the CDF-Plug HCAL We tested and calibrated CDF-Plug Upgrade Calorimeter in test beam We developed very large Megatile technology for CMS-Barrel HCAL We are building all the HCAL Megatiles. Optical Cables, Optical Decoders/Photodetector Boxes for CMS -HCAL We installed all the Megatiles into CMS-HCAL at CERN We have have built an ECAL module for the CERN test beam Rochester (Slattery-Lobkowicz-Ginther) built the massive test beam table We have led and are leading test beam efforts and analyses at CERN We are now in charge of all of US-CMS installation at CERN

Overview Outline Past CMS HCAL Activities at U of R CMS-HCAL Rochester Group Past CMS HCAL Activities at U of R Test Beam Motion Table (Slattery/Ginther) 1995 and 1996 HCAL Test Beam at CERN (data taking, analysis, NIM article) Design of the HCAL Optics System Construction of Scintillator Megatiles for Hadron Barrel Calorimeter Rochester L3 Management Responsibilities, Fermilab FY98-F03 Present CMS HCAL Activities HCAL Installation and Commissioning, CERN FY03-07 TestBeam Activities, 2002, 2003, 2004 Summary

Rochester CMS HCAL Group Physicists ( at Rochester, FNAL, CERN) Prof. Arie Bodek (25% CMS, 25% Neutrino, 50% CDF) - current effort Prof. Paul Slattery (mostly Dzero now) Pawel de Barbaro (Senior RA) - At CERN - 90% CMS (rest CDF) Howard Budd (Senior RA) - At FNAL - 30% CMS (rest CDF, Neutrino) George Ginther (Senior RA) - At FNAL - 5% CMS (rest Dzero) Willis Sakumoto (Senior RA) - At FNAL - 5% CMS (rest CDF) Y, S. Chung (RA) - at FNAL - 5% CMS (rest CDF) Technical Staff (we had 6 techs, now down to 4) Dan Ruggiero (lab engineer) - 100% CMS Project Funds (At FNAL) Janina Gielata (technician) - 100% CMS Project Funds (At FNAL)->TOB Agnieszka Sanocka (technician) -100% CMS Projectd Funds (At FNAL)->TOB Heng Bao Zeng (technician) - 100% CMS Project Funds (AT FNAL) Tom Haelen (Engineer) - At Rochester Summer Students Matthias Imboden (Bern U., 2002-US citizen NSF-REU) - at CERN summer Pawel Sopicki (Jagellonian U., 2003) - at CERN summer Administrative Staff Sue Brightman and Judy Mack

Installing Megatiles at CERN Rochester CDF Plug Group was in charge of CMS HCAL megatile construction at Fermilab and installation at CERN. Rochester technical staff flew to CERN. Megatile design made this a rather simple job.

Status of HCAL detectors, May 2003 HB HE

H2 Testbeam - Motion Table built by Rochester Dzero Group Slattery, Lobkowicz, Ginther and Engineer Tom Haelen HO HB HE

CMS Detector

US responsibilities in HCAL Rochester is responsible for all of HB optics. US responsible for all readout electronics US is also responsible for readout electronics for HE and HO subdetectors HO 2.2 HB 2.1 HF 2.5 HE 2.3

Design of Optical System Scintillation light is collected by wavelength shifting (WLS) fibers embedded in the tiles Outside the tile, WLS fibers are spliced to clear fibers Clear optical fiber cables with mass terminated connectors carry light to the outside of the detector ----> UNIT IS A MEGATILE read by Optical Cables with Connectors Decoder boxes re-group fibers from layer-wise to tower-wise scheme and house photodetectors CMS HCAL HB, HE and HO have adopted most of design features of the CDF End Plug Upgrade

Techical issues specific to CMS Calorimeter Performance in 4 Tesla Magnetic field magnetic field has two-fold effect on the response of the calorimeter. First it changes light yield of the scintillator and secondly, it affects the particle shower development. The second effect depends on the field orientation. HCAL resolution with and w/o crystal ECAL presence of highly non-compensating lead tungstate crystal electromagnetic calorimeter (ECAL) degrades the overall response of the combined ECAL+HCAL calorimeter to hadrons. Radiation damage of clear and WLS fibers assuming int. luminosity of 5x10**5 pb-1 for first ten years of LHC operations, radiation dose will reach 30 kRads for HB (eta=1.1). Radiation dose scales with 1/theta**3, so that high eta region (eta ~2.8, HE) is affected most (2.4 Mrads).

Rochester Management Responsibilities P. de Barbaro was L3 manager responsible for HCAL Optics Rochester managed the production of megatiles for Hadron Barrel Calorimeter: Purchasing of materials (over $2M) Organization of production (14 technicians, 3 years) Quality control (light yield, uniformity) L3 manager responsibilities included supervision of several institutes working on the HCAL Optics Production of scintillator megatiles and optical cables has been completed on time All HB scintillators have been installed into the absorber in 2002

HCAL Calibration Goal: Calibrate from test beam to 3%. Time in HCAL electronics. Monitor performance, including radiation damage. Tools: 1. Nitrogen laser distributed to each sub-detector. Excites scintillator 2. Laser injects light to photo-detectors. 3. LEDs (fast) inject light to photodetector. Programmable pulser. 4. Moving wire radioactive source for long term calibration. 5. Charge injection to ADC’s (QIE). Specialized calibration modules designed and built to achieve goals.

HCAL Test Beam activities HCAL had a major test beam effort in 1995 and 1996 The focus of these test beams were to resolve some technical issues prior to completing the design of optics UR played a major role in these test beams: Lobkowicz/Slattery/Ginther/Haelen have designed and constructed HCAL Motion table, able to carry over 100t of detectors P. de Barbaro was the corresponding author of NIM article sumarizing these test beam results - analysis done by Rochester

Source / Beam Data m- e- RMS 3% RMS 2% We verified wire source calibration works (with muons and electrons)  use to get absolute calibration to 2 – 3 %

TB 2002 versus GEANT4 Resolution Linearity Shape difference: e/h (e.m. & nuclear x-sec), leakage……? suppressed zero The agreement is excellent in all the energy range Data systematic error analysis in progress Validate GEANT4 physics models

Test Beam in 2003 Present test beam runs focus on verification of electronics: We are testing two 20deg HB wedges, 20 deg of HE module, and 30deg of HO 40 MHz Charge Integrators (QIE) send data to HCAL Trigger Cards (HTR) via 1.6 GHz link For each channel, we collect 20 time slices, each time slice is 25ns wide In addition, we have ECAL module (100 PbWO4 crystals with PMT readout, module designed/built/tested by UR) to study response of the combined ECAL+HCAL, especially in the 53deg crack region.

Rochester Responsibilities at CERN P. de Barbaro has assumed responsibilities of Installation and Commissioning Coordinator for HCAL at CERN Rochester responsibilities cover installation of scintillators, optical cables, radioactive source tubes, readout electronics, cooling. Testing of entire chain (scintillator, photodetector, QIE, DAQ) – vertical slice test

Rochester CMS HCAL task summary Rochester lead the design, management and production of the optics system for the HCAL Barrel and corresponding test beam activities, Production of scintillator megatiles and optical cables has been completed. Several test beam runs completed - First NIM article published Rochester is now responsible for installation and commissioning of HCAL detector at CERN Rochester Major Tasks in 2003-2004: installation of HB, HE and HO scintillators, optical cables and readout electronics at CERN Test and integration of full HCAL readout and DAQ with other sub-detectors (vertical slice test) at CERN At Fermilab, continue construction of Optical Decoder Boxes and Electronics. Provide Root Support and Test Beam Analysis - CMS supplemental request for a postdoc to be at CERN.

Back-up transparencies Additional transparancies - backup for Short 15 min talk.

Optical Design for Calorimeters Common Technology for HB, HE, HO

Optics-Megatiles Components are the machined scintillator plates, cover plates, fiber assembly (WLS spliced to clear fiber, optical connector) pigtails

Cross section view of a megatile Optics-Megatiles Cross section view of a megatile

HCAL : HB Calorimeter (Barrel) Sampling calorimeter: brass (passive) & scintillator (active) Coverage: |h|<1.3 Depth: 5.8 lint (at h=0) segmentation: f x h = p resolution: ~ 120 %/ 0.087x0.087 17 layers longitudinally, f x h = 4 x 16 towers Completed & assembled 20o f

HCAL : HE Calorimeter (Endcap) Sampling calorimeter: brass (passive) & scintillator (active) Coverage: 1.3<|h|<3 Depth: 10 lint segmentation: f x h = p resolution: ~ 120%/ 0.087x0.087 19 layers longitudinally 20o Completed, assembled, HE-1 installed

HCAL : HO Calorimeter (Outer) Total number of lint till the last sampling layer of HB is < 8 HO: 2 scint. layers around first m layer (extend to~11 lint ) Test Beam 2002 ~ 5% of a 300 GeV p energy is leaked outside the HB HO improves p resolution by ~10% at 300 GeV & linearity Ring 0 Ring 2 Ring 1

HPD Diode Layout 19 x 5.5mm Hybrid PhotoDiode photon transducer for HB, HE, HO. Fiberoptic front window, conventional photocathode, pixelated diode (19 channels/device). From DEP, Holland. Need ~ 500 total.

HPD Fiber-Optic Window Photocathode Ceramic feedthrough PIN Diode array Ceramic feedthrough Fiber-Optic Window Photocathode e 4 16 kV Gain 4000 8

HCAL SOURCE CALIBRATION 2 HB wedges showing plastic tubes temporarily attached to accommodate wire source system. Moving wire radioactive source. Source on tip of ~10 meter wire. Can be sent into each megatile.

HCAL – TB2002 beam beam h f h f h f 300 GeV pion 100 GeV electron beam ADC counts beam ADC counts 300 GeV pion h f Testbeam setup 16 X 8 towers in Eta - phi beam 225 GeV muon h f

Performance with ECAL tower phi beam Single Event in HCAL s = 12%

Fine scan of timing phase. Pulse shape tells timing.

Timing Issues (2003) Clock and Control Module (CCM) controls relative timing of integration of pulses wrt trigger (LHC clock) Since HB wedges are over 5m long, signal arrival to QIE could vary by up to 15ns (as a function of detector tower eta) We used laser pulses to adjust timing for various eta towers, then tested timing with pion beam. This is important, since for triggering purposes we want to use only 2 time slices. We have also checked relative timing of the two wedges. More test beam data will be taken in August 2003, test beam also planned for 2004.

Measuring relative phase of different towers Laser calib system designed to mimic beam timing. It works. Laser and pion measurements track.  Can use laser system to measure relative phases of different towers and then program CCA to compensate. TIME  Eta Tower number 

Relative Phase after alignment Use laser to calculate d(t) offset. Program CCAs. Use electron beam to check.  Can easily synchronize to <2ns using laser system

Setting timing of both wedges simultaneously Use “universal” phase constants to set both wedges. Conclude : Rms(w1 or w1) ~ 1.2ns d(w1-w2) <0.2ns Wedges are identical. Can use laser to predict overall timing at CMS up to a constant Wedge 1 Wedge 2 N towers ( Tower phase - mean ) (ns)

Interesting Observation Medium sharing Low Sharing Note apparent phase shift of data (average time of pulse) as function of energy deposition in tower.  Electronics group at FNAL is presently working on solution of this problem. Medium sharing Low Sharing Low Sharing

Pileup Studies Trigger on events with a particle in the subsequent bucket as well.

Pileup events, pulse shape study

Cradle

Absorber Design

Modified wedge attachment

Wedge side view showing skin on surface Cutout for Services Z R