Austin Frazer Eileen Kobal Ana Maria Maldonado Marie Rohrbaugh Moog Gas Evacuation Systems Design Review.

Slides:



Advertisements
Similar presentations
Refrigerators. Reversing the Flow Heat flow through an engine was used to generate work. Heat flow through an engine was used to generate work. Work can.
Advertisements

Refrigeration Systems
START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
1 HYDROSTATIC TESTING Approved for Public Release.
HVAC System Design PES Institute of Technology. Objective Goal: To develop an automotive air-conditioning system that is smaller and lighter than with.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Pistonless Dual Chamber Rocket Fuel Pump Steve Harrington, Ph.D Joint Propulsion Conference.
Pistonless Dual Chamber Rocket Fuel Pump
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Review of Helium Venting Analyses
Suction Pumps.
Refrigerators Physics 313 Professor Lee Carkner Lecture 13.
P11228 Week 4 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
W Reliability Centered Maintenance w Day II w Salih O. Duffuaa.
Team P08404: Team Members: Ben Johns (ME) Adam Yeager (ME) Brian T Moses (ME) Seby Kottackal (ME) Greg Tauer (ISE) Faculty Guide: Dr. Stevens Review Date:
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Motor Coupling Design Review The 2004 Idaho Future Truck needs a system to couple the AC induction motor to the power train. + = Motor Future Truck Happy.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
DETAILED DESIGN REVIEW P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer –
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
Hydraulics For The Long Term
Chapter Thermodynamics
Pacific School Of Engineering. Guided By:- Asst.Prof.Vatsal patel Submitted by:-  Kotadiya Reshma :  Ladva Piyush : 
Patrick Thornton, SNS/FPE June 9, 2008
Plan 2 – Dead-end Seal Chamber Optional Jacket
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
File Name – Date - Owner of File Welcome! TANK BLANKETING Its Theory and Purpose, The Process and Its Setup.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Use of Residual Pressure Valves - Challenges and Opportunities for Indian subcontinent. Presented By: Rohit Behani.
Mike Allocco, Soham Chakraborty, Leslie Havens, Danielle Koch, Andrew Miller, Kristeen Yee, Stephanie Zambito TEAM 14026: SYSTEM DESIGN REVIEW P14026_System.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Corial 200 COSMA Software with:  Edit menu for process recipe edition,  Adjust menu for process optimizing,  Maintenance menus for complete equipment.
Principles of correct VRV Installation A. Refrigerant pipe work
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Wound Drainage Suction Pumps Fill Need in Marketplace AC has developed and tooled a novel wound drainage suction pump with the following unique proprietary.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro Parabolic curve P13411.
Mission Statement: Reduce the effect of fixture leakage on leakage data by minimizing the amount of test gas in the space between the o- rings Leakage.
Nanofluidic Characterization David Sharp David West Justin Davis.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Chapter 11 Thermodynamics Heat and Work and Internal Energy o Heat = Work and therefore can be converted back and forth o Work  heat if work.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Maintenance Issues Recharge battery Update phone numbers Delete messages Clean/replace cover.
TITLE OF THE PROJECT:- AUTOMOBILE AIR CONDITIONING AIM OF THE PROJECT:- TO STUDY ABOUT AIR CONDITIONING SYSTEM OF AN AUTOMOBILE PRESENTED BY: INAMUL.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Chapter 10: Flows, Pumps, and Piping Design
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Midpoint Project Review P10454 VAD Test Loop
Thermodynamics Processes.
DESY Experiences on Use of Gas overlay during Assemblies
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
August 23, 2000 R.N. Dubois Dow Chemical
P15661 Reciprocating Friction Tester Base Subsystem
Nanofluidic Characterization
HAZOP Guidewords Base Set
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Leakage Test Stand Improvement Marie Rohrbaugh
Detailed Design Review
SNS Coupler Shipping Plans
P16452 Active Reciprocating Compressor Valve Assembly
Presentation transcript:

Austin Frazer Eileen Kobal Ana Maria Maldonado Marie Rohrbaugh Moog Gas Evacuation Systems Design Review

The Team  Austin Frazer  Role: Lead Engineer - Analysis  Major: Mechanical Engineering  Eileen Kobal  Role: Lead Engineer – Mixtures of Gas Fluids  Major: Chemical Engineering  Ana Maria Maldonado  Role: Team Manager  Major: Industrial Engineering  Marie Rohrbaugh  Role: Project Manager  Major: Mechanical Engineering

Problem Statement To mass spectrometer UUT High pressure helium Fixturing/leakage similar to other side Fixtures interface between AGT can and UUT Fixture leakage UUT leakage

Current Procedure Our process needs to minimize leakage from fixtures Oring Leakage Diagram

VOC to VOE customer rating Mate with the current software system No extra procedure is required to make the system run The system starts when the test starts Nitrogen moves when the system is told to start <5 sec between start of test and equilibrium Reduce the leakage into the can to 1% of original value No adjustment made to original design <100scc/min of Nitrogen used Maintenance plans provided Training materials provided cost of system is <$10,000 time between maintenance cycles is >30 days FMEA performed training takes <30 min provide accurate test data 10 *** Preserve Vacuum 1 * Reduce delay caused by false failures 7 * * minimize increased cycle time 8 ***** * user safety 12 ** operator understands process 3 * ** system is controlled transparently by the existing software 9 ** minimize cost by balancing initial cost, maintenance cost, and consumable materials 6 ***** * sturdy and robust system 11 ** maximize time between maintenance cycles 4 ** maintenance plans 5 * maintenance can be accomplished with minimal money and time 2 * **

Voice of the Engineer

Design Constraints  Safety  Contamination  Class 10,000 clean room.  All products should comply to a strict cleanliness certification  Existing Fixture  Cannot modify inside of can  Must be attachable to can  Gas Flow  Nitrogen gas at 120psia available  Vacuum at 1psia available

Function Tree

Concept Generation

Pugh Diagram- Move/ Evacuate the Gas Comparison Concept ABCD small centrifugal pump to draw out test gas heating / cooling a reservoir of inert gas to draw out test gas additional mass spectrometer at the vent draws out test gas small vacuum pump alternating drawing down the test gas and pumping with a flush gas Criteria Weight Application elsewhere at Moog10100 Availability of resources Contamination possibility Cost Durability (everyday use) Effectiveness Fits timeline Long term benefits Maintainable Meets space limitations Safety Works transparently with current system

Pugh Diagram- Access the Gas Comparison ConceptABC larger cavity for gas collection modify vent geometry fill vent with a viscous fluid to prevent He from entering have a different o-ring material so that the He doesn't go through CriteriaWeight Application elsewhere at Moog1001 Availability of resources700-7 Contamination possibility900-9 Cost70-77 Durability (everyday use) Effectiveness Fits timeline Long term benefits Maintainable Meets space limitations80088 Safety Works transparently with current system

Block Diagram

Flexline to Nitrogen Source Flexline to Vacuum Source To vent To large o-ring X2 Relief Valve AN Fitting 2-way 2-position solonoid valve

Flexline to Nitrogen Source Flexline to Vacuum Source To vent To large o-ring X2 Relief Valve 3-way 2-position solonoid valve AN Fitting 2-way 2-position solonoid valve

Analysis Performed – Simscape Model

 Case 1)

Analysis Performed – Simscape Model  Case 2)

Analysis Performed – Simscape Parameters  Model Orings as Orifices 1 2

Diffusion Diffusion Coefficient for 2 gasses Diffusion Flux: Movement due to Diffusion across an area

Gantt Diagram

Risk Assessment

Questions??