Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Walls crates cables gas chambers electronics CERN adb.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
Dec
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ATLAS Internal ID Service Integration
Roadmap for triplet cryostats
BSS Prep work at CERN and Acceptance of Parts
End-cap Mechanics FDR Overview of the Project
MICE Target Report Video Conference 29/11/07
Mechanics: (Tim).
WP4 – Plans for next 6 months
Far Detector Activities Late 2017 – Early 2018
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Cryomodule Assembly Plan
Tests of Endcap capillary & Heat exchangers at CERN
After service guide for changing PCB
Presentation transcript:

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04

Nikhef disk cylinder assembly tooling

TPPCs 4x32ch PCBs Thermal plug access windows Cooling pipes LMT trays Service Handling

Disk insertion tooling

Progress with Disk cylinder tooling Shielding foil added to cylinder Thermal feedthrough prepared and fitted Cylinder and stub wings assembled onto tooling (July) 4 disk alignment tools made by Manchester Disk grabber-design by Nikhef-manufactured by Sheffield/Lancaster Disk fixations from Nikhef and Liverpool-delivered alignment target holders designed (Nikhef) and manufactured (Lancaster) Disk insertion, alignment (X,Y), capture+removal (August) alignment better than 100 m Wheels+jacks added and tooling+cylinder have been moved in and out of the cold room (Sept)

Alignment disk capture DOF mechanism Disk grabber

Cylinder inside the cold room Moving into the cold room

Status of tooling-Oct 2 nd disk alignment, capture and removal has been performed with D7 populated with services –alignment checked with dummy masses –used interface to disk mini-cylinder –grounding: mini-cylinder and frame grounding –FSI spool+ ground foil handling –work with scaffolding around cylinder Work to be done –Thermal cycle of tooling+cylinder in the cold room –Removal and insertion of the beam to be demonstrated –grabber needs to be improved-stronger springs

Mounting disk onto cylinder from mini-cylinder Mounted relative to cylinder using pins FSI spool sitting on mini-cylinder

move FSI spool back onto PPF0 using PPF0 location screws Remove FSI spool and place outside patch panel Ground foils

Service status LMTs Testing of UK tapes at Glasgow, first 15 tested Delivery ~100/week, Taiwan to finish production 10/12 TIs Will be tested as part of LMT-TI harness at Glasgow String test LV/HV test cable TPPC TI LMT PPF0 wiggly tape hybrid/module at Liverpool 2 adjacent channels on pre-production TPPC tested First 16 TPPCs to be delivered to Liveerpool this week/next week for D9 Fibres Lancaster has volunteered to take on reception testing Fibres for disk testing (D1) at Liverpool, D9 delivered and tested ok, length issue DCS for D9 will be delivered by RB this week Cooling pipes Assume no cooling pipes initially and connect direct to disk as for disk testing Retro-fit cooling pipes at Liverpool/CERN when components ready and connect at STFT for testing Cooling-replicate disk testing system and connect direct to the disk-or similar Parts delivered and assembly underway at Liverpool

TPPC string test String test Test cable TPPC TI LMT harness PPF0 wiggly tape hybrid direct to hybrid String test Cooling HEX same design as for disk testing

Service handling Thermal plug delivered and fitted (Sheffield) PPF1 trays for LMTs ready (RAL) PPF1 tray holders (Sheffield) Delivered, being sent for anodising Other parts for LMT handling in progress at (Nikhef+Lancaster) Temporary PPF1 for fibres Lancaster have volunteered to make this based on prototype being made at Nikhef At Liverpool we need to ensure we can connect in the cold roomlooks good, measurement of fibre length indicated that fibres reach close to window in the thermal plug

Thermal plug and LMT trays+holders

Cooling connection captive ! Helicoflex not O-ring LMT connection checked connection with pcb by measuring thermistor use clip on light and dental mirror to check connections problem with some mis-alignments of guides passed back to disk makers, they will check alignment with pcbs can be fixed in-situ but to be avoided Strain relief at aperture

bendy fibres?! cable clamps (D3-D9 on cylinder) fibre clamps (D3-D9 on cylinder)

Temporary patch panel (TPPC) and TI connections

Testing during assembly Ensure connections from PPF0 on disk to TPP on thermal plug are well made before moving into cold roomlimited access! –LMT connections: check temperature through LV, checks connection at PPF0 –Check fibres and LMTs by sending trigger burst using SCT DAQ (RODDAQ being used to test disk) Aim to do module by module in parallel with service laying

Schedule-ambitious! 10/11 Assemble service handling –awaiting final parts Week of 15/11+22/11 leak check and test cooling, move into cold room and test with D7 –cooling being assembled –waiting for DCS cables (due this week) End November ready to install D9 and mount services

Issues Cooling and test of disk with services in cold room –cooling being set up for testing LMT delivery and making harnesses –delivery of D9 tapes by end this week ? –tape testing at harness preparation at Glasgow Problem with infininion connector at PPF0 –cannot be fixed in the cylinder Experience !

Testing in cold room Based on experience with disks Move into cold room and cable (1d) Check cabling (1.5d) Cooling down (1d) Confirmation tests (5d) Characterisation (5d) Warm-up (with I-V) (1d) Total ~15d per disks Can we run cold overnight ?!