Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

Rotary Encoder. Wikipedia- Definition  A rotary encoder, also called a shaft encoder, is an electro- mechanical device that converts the angular position.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
Hardware activity at SX5 including detector alignment for the next three years Valery Andreev UCLA October 9-10, 2006 UCLA DOE review, task L.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Muon endcap alignment for the CMS experiment and its effect on the search for Z′ bosons in the dimuon channel at LHC Muon endcap alignment for the CMS.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
Calibration of clinometers for the alignment of muon chambers in the CMS experiment. Thomas MOSCHOUTIS, Marion RIPERT and Georgia KARAGIORGI with Dr HOHLMANN.
Alignment Strategy for ATLAS: Detector Description and Database Issues
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Effect of muon misalignments on muon p T resolution and on the search for Z' SSM → µ + µ - using 7 TeV MC samples Samir Guragain, Marcus Hohlmann Florida.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Online Reconstruction 1M.Ellis - CM th October 2008.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
Michele de Gruttola 2008 Report: Online to Offline tool for non event data data transferring using database.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
USCMS May 2002Jim Branson 1 Physics in US CMS US CMS Annual Collaboration Meeting May 2002 FSU Jin Branson.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Marian Ivanov TPC status report.
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Pixel Data Quality Monitoring
DQM for the RPC subdetector
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Transfer Line Calculations
Plans for the 2004 CSC Beam Test
Presentation transcript:

Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab, Oct 21/22, 2005

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 2 ME Alignment System R-sensors Z-sensors Note: only small sample of analog sensors shown Clinometers Transfer plate DCOPS To be featured in Physics TDR – Vol.1

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 3 Overview Update on analog sensors –Final calibration results for two types of Z-sensors –Final calibration results for Clinometers –ME1 proximity (PX) sensors Software preparation –Overall data flow –To do list –Plans for Magnet test

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 4 Recent activities Built specialized calibration mounts for ME1 Z-, R-, proximity-sensors, ME4 R-sensors Calibrated all clinometers, Z-sensors and shipped to PSL/FNAL for mounting Initiated alignment software development activities during 1-month summer stay at LPC Graduated a CMS M.S. student (Marion Ripert, now working with Laszlo Gutay at Purdue)

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 5 Progress update Note: Each sensor is sub- jected to 5 calibration runs Total in System Calibrations completed To do R-sensors (ME1,4) Z-sens., potentiometers Z-sensors, lasers Clinometers48 (6 spare) ME1 Proximity sensors 720

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 6 Full set of Z-potentiometers: Sensor-to-sensor variation Abs ( ) Slopes: < ± 1% variation Note: In the end, we will actually use fit results for response relative to a reference voltage: V(z) sensor /V ref

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 7 Full set of Z-potentiometers: Relative errors on slopes % Error on slopes [%]

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 8 ME1 Z-Laser sensors Linear Mover (“barrel”) Z-laser sensor (“ME1”) IR laser beam Z-potentiometer (“link to ME2”) Diffusely reflective surface

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 9 Typical Z-laser response (ME1) Trial1 ME+1-TP3-ZLB11 Slope = (V/cm) Error in slope = (V/cm) Distance [cm]

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 10 Full set of Z-lasers: Sensor-to-sensor variation Slopes: ± 1% variation

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 11 Full set of Z-lasers: Relative errors on slopes % Error on slopes [%]

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 12 Typ. Clinometer response Angle [deg]

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 13 Full set of Clinometers: Sensor-to-sensor variation in X in Y Slopes: ± 6% variation Note: Pos. and neg. inclinations are fitted separately; each device has two entries in each histogram.

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 14 Full set of Clinometers: Relative Errors on Slopes Errors on Slopes: 0.3% in X in Y

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 15 Total Calibration Uncertainties (specifications) R-sensors ± 100 μm (< ± 430 μm ) Z-sensors ± 55 μm (< ± 1000 μm ) PX-sensors ± 55 μm Clinometers ± 0.02 o Final numbers for all sensor types:

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 16 ME1 proximity sensors Linear mover 2 prox. sensors Precision reference bar Prec. dowel pins Calibrate 2 sensors simultaneously Establish absolute reference distance Ready to perform calibrations

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 17 Road to Completion Calibrate & deliver in this order: –ME+1 PX sensors –ME+1 R sensor –ME - 1 PX sensors –ME - 1 R sensors –ME±4 R sensors –Spare clinometers Document calibration project in CMS note

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 18 Alignment Software July 05: While at LPC, initiated contact with Calibration, Alignment, Database (CalAliDB) working group –leadership: Lee Lueking (FNAL) & Oliver Buchmüller (CERN) –Now: Tri-weekly meetings on alignment DB issues –Muon Barrel & Link people also participating –attempt to unify alignment software for tracker and muon as much as possible –Fl. Tech working with Lee Lueking’s group

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 19 Data Structure & Flow Offline reco CSC data MUON TRACKS Optical & analog sensor raw data Optical & analog sensor calibration data COCOA: Alignment fits (in CMSSW framework) COCOA OUT COCOA IN CSC “Alignment object” contains chamber offsets …Δx i Δy i Δz i Δα i Δ β i Δ γ i... Geometry Database Magnet-off Photogrammetry & Survey data Muon Trigger HLT, L1 POOL-ORA object (directly or via ascii) POOL-ORA object Format: Event dataXML files XML files (?) As of October 2005 (auto-conversion of existing ascii geometry from old COCOA version – Pedro Arce) (by hand – Dave Eartly?) (by hand - Fl. Tech) (Fl. Tech)

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 20 Integrated some analog sensors into COCOA Samir Guragain, MH LPC July 2005 back CSC front CSC DCOPS Representations of R-sensors SLM reference z Note: Sensor sizes greatly exaggerated for visibility Visualization output from COCOA alignment model R-sensors SLM:

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 21 To do list Produce COCOA version in CMSSW (P. Arce) Develop COCOA-IN & COCOA-OUT (Fl. Tech + tracker?) Transform calibration data, sensor data, geometry, survey data into database formats for use by COCOA –Have started w/ strawman table for analog sensor calibration –Need to verify nominal COCOA geometry against CAD files and actual nominal on-detector geometry (Fl.Tech & D. Eartly) Understand COCOA performance for ME with magnet test data create alignment object as output for offline reco use

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 22 Magnet test Main goal (in my opinion): Get good data ! Mostly analyze it later … Ensure that ME+ alignment system is fully instrumented and can be read out –Planning to send Fl. Tech grad student Samir Guragain to CERN for 5-6 months in January 2006 to help commission read-out; get M&O support from Giorgio to do so Magnet-off photogrammetry (Dave Eartly)

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 23 Magnet test cont’d Test basic functionalities first: –Do the controls work (e.g. lasers for SLMs) ? –Does the readout work? –Do raw sensor readings make sense (magnet off vs. magnet on) ? –Does the raw data get written out properly in event data format ? Suggested alignment exercise: –Move disks relative to each other and relative to barrel by few mm and detect with Z-sensors with magnet off (is this even possible?)

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 24 Magnet test cont’d Output parameters from COCOA fits for reconstruction: –6 parameters per chamber: Δx, Δy, Δz displacements of chamber centers Δα, Δβ, Δγ rotation of chambers Currently no plans to align at a lower level (strips, wires) with the hardware alignment system. Maybe later we can get more sophisticated once the basics are under control.

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 25 Summary & Outlook Calibration of Clinometers and Z- sensors done. Keep on calibrating R- and PX. Finish soon ! Software side of alignment gaining momentum. Jump into it full-time as soon as hardware done. Lots to do. Help commission alignment DAQ at CERN starting early 2006.

10/22/2005 M. Hohlmann - EMU meeting at Fermilab 26 Loosely related news Florida Tech Friday afternoon