LW SURVEY COMPANY TARGETING THE WORLD THE UNIQUE CHALLENGES OF “AS-BUILT” PROJECTS.

Slides:



Advertisements
Similar presentations
GIS and BIM Integration: Business Level Framework
Advertisements

Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Moving to a Centralized Database for Surveys in Blaise at NASS Roger Schou National Agricultural Statistics Service IBUC XII Riga, Latvia.
Mapping Site Instruments. Introduction The Mapped Instrument is a tool that guides you in matching your site specific Instrument and materials to the.
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
US Army Corps of Engineers BUILDING STRONG ® Performing Data Migration USACE SDSFIE Training Prerequisites: Implementing a Local Adaptation.
3-1 Utility Conflict Identification and Management Lesson 3.
Disconnected access to network information for field personnel Bentley PowerMap Field for Communications.
First Article Inspection Report
Creation Of Digital Topographic Maps Of Industrial Area Based On Aerial Survey Tatyana Dedova KAZGEOCOSMOS JSC Almaty, Kazakhstan 2013, Ury, France 1.
Creating Custom Reports. 2 Design and create a custom report You can easily create custom reports based on a table or query. There are seven sections.
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
Chapter 18 Working Drawings.
CATEGORIES OF INFORMATION There are three main categories of business information,and these are related to the purpose for which the information is utilized.
Designing a Database Unleashing the Power of Relational Database Design.
A Student Guide to Object- Orientated Development Chapter 2 Requirements for the Wheels case study system.
SCS900 Advanced Measurement Functions
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
NSF DUE ; Laura Johnson Cherie Aukland.
Presented By: Product Activation Group Syndication.
© 2011 Autodesk CI3865-Incredible AutoCAD® Civil 3D® Users: Prove your Credibility with Civil 3D Certification, Part 2 Michelle Rasmussen Training Manager.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Esri International User Conference | San Diego, CA Technical Workshops | Loading CAD data into the Geodatabase Alex LeReaux Thursday, July 14, 2011 – 10:15.
With Microsoft Office 2007 Intermediate© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Office 2007 Intermediate.
With Microsoft Access 2007 Volume 1© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Access 2007 Volume 1 Chapter.
PowerPoint Presentation By: David Larson. IPA’s Identify Components of Visio 2010 interface, navigate a Visio drawing, and get help Using Visio. Manipulate.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
GEODATABASE Lower Adirondack GIS Users Group Meeting March 2, 2005 Lower Adirondack GIS Users Group Meeting March 2, 2005.
PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Courier Tracking System. Small Courier Operations Small courier services collect Letters and parcels from customers and issues its own POD number Then.
Web GIS Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 MCS Web GIS Commander is Web-based GIS (Geographical.
Population Census carried out in Armenia in 2011 as an example of the Generic Statistical Business Process Model Anahit Safyan Member of the State Council.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Traffic Engineering Lopez,Juan Lorenzo; Aguilar-Carranza,Natalie Rick Engineering Company, 5620 Friars Road San Diego CA 92110;Caltrans,4050 Taylor Street.
 So far in ICT we’ve covered how data is entered into computers (data capture) and how it’s checked (validation and verification).  In this section.
What have we learned?. What is a database? An organized collection of related data.
XP Chapter 2 Succeeding in Business with Microsoft Office Access 2003: A Problem-Solving Approach 1 Building The Database Chapter 2 “It is only the farmer.
Quiz questions. 1 A data structure that is made up of fields and records? Table.
METAL LOSS IN-LINE INSPECTION SURVEYS LIMITS AND INACCURACIES.
Census Data Capture with OCR Technology: Ghana’s Experience Presented at the UNSD Regional Workshop on Census Data Processing Dar es Salaam, Tanzania 9.
ELECTRAAdvantages ELECTRA Advantages Intuitive workflow Electra workflow consistently follows standard Civil engineering design process which intuitively.
Integrating As-Built Policies and GIS Maintenance Procedures
McGraw-Hill Career Education© 2008 by the McGraw-Hill Companies, Inc. All Rights Reserved. Concept 1 Database – Organized collection of related information.
Administrative Cost Savings through Invoice Verification.
Client Standards – Why the Disparity Jeff Weaver May 29 th, 2015.
Transfer of digitized enrolment data from the enrolment station to the CIDR of the UIDAI. Currently through memory sticks via India Post. At a later stage:
Mapping in the Last Mile Offline information access.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Building a Transportation Database WMATA Rail Station Mapping Project 3/18/2014.
Microsoft Office Access 2010 Lab 1
eSPL Innovative Management Technology
CAD ADMINISTRATOR Stage One are looking for a CAD Administrator to support our busy CAD department in Tockwith, near York. Ideal Candidates We are looking.
Relational Databases.
Accelerate define.xml using defineReady - Saravanan June 17, 2015.
Tools and Techniques to Clean Up your Database
Traceability of Gas Pipeline Materials Research & Materials Manager
Microsoft Office Access 2003
NexGen Data Entry is a premier outsourcing company in India providing the best IT enabled business process outsourcing services globally. We offer a wide.
ERD’s REVIEW DBS201.
AGA MAOP Document Review / PODS Implementation
Lower Adirondack GIS Users Group Meeting March 2, 2005
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
COMP 208/214/215/216 – Lecture 7 Documenting Design.
Final Design Authorization
Review Test 3 CS 101 Spring 2019.
Presentation transcript:

LW SURVEY COMPANY TARGETING THE WORLD THE UNIQUE CHALLENGES OF “AS-BUILT” PROJECTS

WHO IS LW SURVEY?  Established in 1998 by Les Welch in Duluth, MN.  12 Office locations  26 PLS professionals covering 33 States  10,000+ miles of major pipeline projects  6 Blue Sky Certified users  PRISM (custom data validation tools)  PPMS (Pipeline Project Management System)

PLAN YOUR WORK…WORK YOUR PLAN …it takes a special kind of person to do as-built R. Calvert LW Survey Skyline Certified Lvl III

THEN AND NOW… THEN  Depth of Cover  P.I. locations  P.O.B. / P.O.E.  Valve locations  Length and Bearing table  Alignment Sheets  Pipe Tally NOW  GEO Database (.gdb)  Ascii point data files  Detailed Alignment Sheets  Skyline “AlignFM” (typical 36 “BSDI” tables)  Validated & Staged data for PODS loading  PIGGING Data  Foreign crossing information  Hydrotest data  MTR Reports  Mill Reports  Detailed Pipe tally  Cathodic Test station data  Above Ground locations (mlv, launcher receivers, taps)  CAD (.dwg) base maps  ONE-CALL DATA REPORTING

SURVEY PREPARATION  Understanding the Client’s Pods Instance  Which tables are “required” and which fields inside those table are “required”  Understanding the “domain lookups”  Dictionary types (text or numeric)  Reverse Engineering the Survey Code/Attributes  Current Survey code list should be reviewed to ensure the capture of data satisfies the client’s final needs

DATA PREPARATION  MTR Data  Mill data from the manufacturer identifying pipe specifications and test reports.  IFC Data requisition  IFC data (survey points, vector data, parcel data, imagery)  Above Ground Piping Drawings  Typical or site specific fabrication drawings  Procurement Records  What was purchased in order to validate what was used  Empty Data?  What is the client’s standards for empty fields (“unk”, -1, “unknown”, “0”)

DATA STAGING  Final Tie-in is complete…what now?  Validating Heat Numbers against MTR / Mill reports  Checking for elevation busts  Checking for Joint Lengths  Duplicate x-ray numbers  “AlignFM” or “REV”  Checking collected data against client “domain table” values  Loading BSDI tables for client PODS load.

Thank you for your time and attention! We look forward to working with you in the future.