Existing Solution 1 Proactive – SLR 6 hour schedule activities for managed email services Stop light report is posted and reviews any open tickets for.

Slides:



Advertisements
Similar presentations
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
Advertisements

ServiceDesk Plus Product Overview Presented by ManageEngine 1.
ServiceDesk Plus MSP Product Overview. Why ServiceDesk Plus - MSP? Capability of Managing Multiple Client’s in one Help Desk Stop Juggling with multiple.
Major Incident Process
Integrating The Datacenter OpalisRobot MOM Operator.
Chapter 14: Troubleshooting and Problem Resolution.
Advanced Workgroup System. Printer Admin Utility Monitors printers over IP networks Views Sharp and non-Sharp SNMP Devices Provided Standard with Sharp.
Cisco’s Technical Assistance Center
Best Practices – Overview
Microsoft Premier Support for Office 365 Service Introduction
IBS Global Customer Support LOGGING CALLS WITH IBS SERVICE DESK.
MANAGED SERVICES OPERATIONS. Increasing IP Infrastructure Complexity Requires Greater Need for Services Data Center B2B Links Branch Offices Distribution.
ITPD PRODUCTION SUPPORT PROCESS OCTOBER 8, /15/2015 Guiding Principles 1.Support the business area’s needs to execute transactions and expand.
ITimpulse NOC process This is an interactive, detailed, step wise guide explaining how alerts are managed at our NOC. This document contains information.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Troubleshooting Your Network Networking for Home and Small Businesses.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Troubleshooting Your Network Networking for Home and Small Businesses.
Solution Overview for NIPDEC- CDAP July 15, 2005.
1 ISP Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
SEUK Large Format Monitor Service B2B. Corporate Line (see page 2 for detail) Target SLA Next Day on-site visit if call is received before.
Module CC3002 Post Implementation Issues Lecture for Week 4 AY 2013 Spring.
Why consider Managed IT, even if you are IT? 1.Increase support availability 2.Give (Name) their job back 3.One stop shop 4.Increasing costs 5.Outgrown.
Training on ManageEngine Desktop Central
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
1 Root-Cause Network Troubleshooting Optimizing the Process Tim Titus CTO, PathSolutions.
Ewan MacKellar Steve Moore. Get to know what is normal! - Build a repository of network captures and Snooper logs showing what takes place in.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
Installation And Troubleshooting Guide. PHONE REQUIREMENTS High Speed Internet Connection Using DSL Modem, Cable Modem or Wireless Canopy With a minimum.
Ripple Technologies, Inc 7/98 LogCaster. Ripple Technologies, Inc 7/98 LogCaster NT Real Time System Monitoring.
Working with the LiveOps Help Desk
Introduction to the First of Type Process. 2 Agenda Introduction to the meeting First of Type Site – What it means? Responsibilities of CFH in FOT process.
Logging Service Desk calls Need ICT Help?. Contacting ICT Service Desk What information should I supply for computer or account issues What to do once.
User creates problem ticket on Web tool? User has Problem End user requests asst. via , phone, in person. No ticket created Helpdesk staff decides.
Session 7 - Maintenance - contract and day-to-day Maintenance Support Presenter  Grenville Powell (Managing Director - of Shokaz Integrated Computing.
Oncology Patient Enrollment Network OPEN Support Services Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Asset Management Know your environment. Inventory Why Inventory?
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
1 Root-Cause VoIP Troubleshooting Optimizing the Process Tim Titus CTO, PathSolutions.
Console Operations (Service Desk). Console Operators are tasked with a wide variety of functions and responsibilities We are the first point of contact.
NetTech Solutions Common Connectivity Problems Lesson Eight.
Customer Requirement Survey
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Trouble ticket
Discovery 2 Internetworking Module 2 JEOPARDY K. Martin.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
CAG VPN Sep 2011.
Process Overview. Page 2 Agenda Problem Reporting and Escalation Procedure RMA Process Overview.
Confidential Rapid Troubleshooting for Data, VoIP, and Video VoIP Performance Manager.
TESTING UPDATES for 2016 Office of Assessment
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
 How to Reach Us  Service Support Levels  Support Definitions & Standards  Response Levels  Point of Contact  Our Escalation Processes  Expect a.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
FESHM Updating Automating the Process. Workflow stages by name Length of time in each stage Approved4 years and 6 months Under Revision6 months, reminders.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 ISP Help Desk Working at a Small-to-Medium Business or ISP – Chapter.
© 2010 Cisco and/or its affiliates. All rights reserved.
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
Zscaler Support Model MANY MOVING PARTS SUPPORT MODEL Customer Network
Unit4 Customer Portal Submitting & Managing Cases.
HSCN- TACO Programme 26th April 2018.
Customer Requirement Survey
Porting Process : Portugal
Network Performance Manager
Porting Process : Portugal
The Troubleshooting theory
Presentation transcript:

Existing Solution 1 Proactive – SLR 6 hour schedule activities for managed services Stop light report is posted and reviews any open tickets for aging, severity understanding and begins his analysis. He joins the team and the technical lead to discuss what is happening and any concerns popping up. Scheduled services monitor engineer takes hand-off of current possible issues, current issues and any major severity. Begins his health checks and develops report. Tasking for SR. team members for leadership in resolution and any escalations or changes required 3 weeks ahead. Change management planning meeting prep arranged and discussed for approval with Customer governance change board. Task and change plan assignmet documented Team review of the feedback is given and plans developed with assigned tasks for follow-up a mid day system and ticket health check. 6 SDM conducts daily meeting to review issues and change logs. Once completed SDM provides daily morning report for stakeholders and shares with teams. 8 Team Lead conducts a morning update meeting with customer team. Providing the findings, aging escalations, hardware or threat escalations. Receiving feedback and developing a plan from This briefing Communication is posted in a shared location for anyone to review.

Steve logs a ticket that his phone is not working properly with details of his extension Helpdesk refers to SOP and does first level troubleshooting Voice Admin picks ticket and refers to Asset DB to get details about the Cluster the IP phone is configured on Offshore team Pages the Onsite Voice administrator Service Desk On troubleshooting Voice Admin finds out that the IP Phone is not responding and requires a hard reset Offshore Voice Team Onsite Voice Administrator observes the Phone for sometime and then after confirmation from Steve resolves the ticket, informs the offshore team and updates the KEDB The stakeholders involve Service Desk & Voice teams Onsite Network Administrator visits Steve and hard resets the IP Phone using specific Key combinations Automated is sent to Steve about resolution of the Ticket along with a feedback form Ticket created in central ITSM tool console With user details SOP Provided By Voice Team Unable to resolve, helpdesk escalates to Voice Admin through ITSM tool Steve – End user at Houston 11:00 AM 11:05 AM 11:20 AM 11:30 AM 11:40 AM 12:00 PM Use Case – IP Phone not working at Houston 2

Richard logs a ticket that his phone is not showing any line numbers Helpdesk refers to SOP and does first level troubleshooting Offshore Voice Team passes on the Switch and Port details to the MNS team to confirm the port VLAN configuration Service Desk Offshore Team Contacts the Local IT Support/Dispatch team to confirm the IP Phone to PoE switch cabling Offshore Voice Team Offshore Voice Team observes the Phone for sometime and then after confirmation from Richard resolves the ticket and updates the KEDB The stakeholders involve Service Desk, Voice team, Local IT Support and MNS Teams Automated is sent to Richard about resolution of the Ticket along with a feedback form Ticket created in central ITSM tool console With user details SOP Provided By Voice Team Unable to resolve, helpdesk escalates to Voice Admin through ITSM tool Richard – End user at Oklahoma MNS team corrects the port VLAN config and confirms the Voice team MNS Team Local IT Support/Dispatch 09:00 AM 09:05 AM 09:20 AM 09:30 AM 09:40AM 09:50AM 10:00 AM Use Case – IP Phone not working at Remote Location 3

4 Use Case - Failed switch/router at an unmanned office. The failed network device must be replaced and configured. Alert generated Automatic Ticket generation on Remedy Tool Network Monitoring Team NODE DOWN Alert generated Alert captured by BEM/ITOPS Tool Alert Monitored by the Monitoring Team Incident resolved, Asset Updated, Ticket documentation Completed Ticket Closed L2/L3 Onsite Engineer raised RMA and ask DSS Engineer to ship the device to OEM HCL-MRO L2/L3 Team L1 team escalates the issue to L2/L3 Team  The L1 Monitoring able to reach the WAN edge router and. Unable to reach the LAN switch via pings/telnet.  The L1 Monitoring team tries to access the LAN switch using Out Band access but fails.