Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
1 4/2/2009 PHENIX WEEKLY PLANNING 4/2/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch

Technical Support /5/08 Shutdown ’08 Schedule Shutdown PrepDone Mu Trigger, RPC Prototype Installation, New Beampipe, CM Crane, Sta. 1 and MMN Scaffolding ReviewsAll Done, Action Items in progress RPC Prototype C tests (in tent)in progress Install/field fit CM access stairs in progress Build MMN scaffoldingin progress Build Sta. 1 N. scaffoldingin progress MuTr Decapacitations (Sta. 1 N and MMN)ready to start 6/5 RPC Prototype D tests (in tent)in progress Design RPC installation fixtures & MuTrigger FEE platformsin progress Prep work for Mutrgr platforms (water/elec)in progress Prep work for RPC proptotype installJune move (7) MuID pipes move gap 5 south cable tray End of run Party May 30

Technical Support /5/08 Shutdown ’08 Schedule, cont’d Prep RPC Proto, MuTrggr FEE N&S Racksin progress RPC engineering & safety review~mid July MuTrigger FEE N InstallJuly -Aug. Install MuTrigger N cooling water & airJuly - Aug. RPC prototype gas systemJuly - Aug Move shielding for RPC prototype installationJuly - Sep RPC prototype cable routing & supportJuly - Aug Modify crystal palace & vapor barrierJuly - Aug Install MuTrigger FEE N platform&RackJuly 15 – Aug 1 RPC prototype installSep.-Oct. (RPC2 – PHENIX) (RPC3 – C. Pearson) Install RPC prototype rack in tunnel southSep. Install Mutrigger FEE’s in MMS for RPC testSep. Install MuTrigger FEE South platformSep. Install MuTrgr S rack cooling & electricSep. HBD InstallSep.-Oct. Connect electronics/gas/water/air for RPCSep. – Nov. PC1 west work (needs planning)Sep. – Nov. CM Crane InstallOct. DC East?/West RepairsOct. – Nov. Replace tunnel shieldingNov. (C. Pearson)

Technical Support /5/08 Shutdown ’08 Schedule, cont’d Remove all inst’n equipment(e.g. scaffolds)Oct. - Nov Gap 5 north piping and cable tray re-loc.Oct. – Dec. Gap 2 north cable tray & crate re-mountsOct. – Dec Fan Tray maintenanceOct. - Dec. Prep for shutdown 2009Nov. - Dec Prep for run 9Dec Close shield wall start shifts Dec. Start physicsJan 1

Technical Support /5/08 MMN Scaffolding under construction

Technical Support /5/08 CM Crane, Station 1 scaffolding CM Crane procurement postponed Until FY09 Sta 1 scaffolding is here. To be built next week

Muon Trigger Updated Installation Schedule RIKEN/RBRC Itaru Nakagawa

6/5/088 MuTrig Installation Schedule

6/5/089 Major Items LV/Optical Cable Bundle/Install  Week 2 ~ 4, July Chassis Installation  Week 2, August ~ Chamber Cables Install & Noise Check  Week 2, August ~ ADTX Install  Week 4, August ~

Technical Support /5/08 Exploring alternative configurations no obvious solutions

Technical Support /5/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM

Technical Support /5/08 Detector upgrade Rack layouts

Technical Support /5/08 MuTrigger Racks North South Mike L. & Frank have begun prepping these. Need info on RPC prototype rack.

Technical Support /5/08 MuTrigger FEE Rack Utilities Need to install Tee’s on supply and return lines: both s/b ¾ to supply Mu Trigger North rack and future rack

Technical Support /5/08 RPC Absorber Concept

Technical Support /5/08 RPC Absorber Concept Uses 112 2x4x8 PB bricks, 22 need to be cut 12 inches deep (RPC group requsted 35 mm (13.8 in)

Technical Support /5/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /5/08 CM Access

Technical Support /5/08 New Beampipe Design & Review SS/Be central beampipe 1-5/8” to 3” transitions Drawings Done Ready to place order when funding is available

Technical Support /5/08 Safety & Engineering Review Action Item Status 1. New Beampipe 2. Mu Trigger FEE upgrade installation 3. RPC Prototype Installation 4. MuTr MMN & Station 1 scaffolding 5. CM Crane

Technical Support /5/08 1) Upgrade Crane switch:arc flash mitigation-remotely operated contactor which will feed the IR crane disconnect switch 2) Mixing house safety bucket rewiring 2) Install HVAC cooling and/or fan power circuits into RPC tent. Install fans/cooling units. 3) Run Power to new MuTrgr FEE racks on MMN and MMS 4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. 5) Install power feeds to RPC north & south tunnel racks from IR power panels. NOTE: MuTr north power panel has no available breakers to feed north tunnel racks (south panel has spare breakers for use). More engineering analysis is required to determine if the north power panel should be increased in size or for installation of a sub panel branch can be accomplished. 6) Assist in signal cable installation for MuTr/RPC upgrades as necessary. 7) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. 8) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Shutdown ’08 Electrician Work

Technical Support /5/08 Work Permit Requirements CM Crane Installation RPC Prototype Installation HBD re-installation PC1 Repairs These WP’s not needed until Sept. (More will be needed – to be added to the list as appropriate)

Technical Support /5/08 Shutdown Work $$$ Projects Include: 1.CM Crane 2.New 40 mm ID beampipe 3.RPC Factory 4.RPC Prototype Installation 5.RPC Final Installation 6.MuTrigger FEE Upgrade 7.CM Access Stairs 8.MuTr Decapitations 9.Gas House Reorganizationmaintenance 10.Bridge Rework 11.HBD Re-installation 12.DC East & West Repairs 13.PC1 Repair 14.Rack room UPS upgrade 15.Bridge Power upgrade 16.Rack Room Update 17.Detector Rack Fan tray replacement 18.Safety System Upgrade 19.Cooling Water system upgrade 20.DAQ/Trigger Upgrade 21.DCM II Development 22.VTX support 23.FVTX support 24.NCC support PHENIC Engineering and Technical Support Group Spreadsheets updated, please review/correct/return to D. Lynch ASAP. Next Integration meeting tomorrow

Technical Support /5/08 RPC Prototype Rec’d dim’s and lifting points from Larry B. Need to decide on prototype orientation and alignment for Sta 1 & 2 based on absorber location.

Technical Support /5/08 RPC Factory Support, cont. (2) ~3 Ton thru-the-wall AC’s available from CA-D 208V Need isolated electrical source Supplemental portable 1-1/4 ton unit ordered Storage Shelving: 2 additional sets rec’d. Assembly is done.

Technical Support /5/08 New Beampipe Design & Review SS/Be central beampipe 1-5/8” to 3” transitions Drawings Done, C-A getting Quotes for NEG coating BP designs at SAES for NEG quote. Meet w/ Brush Wellman 5/19

Technical Support /5/08 Safety, Security, etc. 3 die in Fla. after container gas leak, police say 'They lost their lives trying to help one another' co-worker says Fort Lauderdale Fla. A classic confined space accident Ar (odorless/colorless/ non toxic but displaces oxygen) leak in container ship: One went to investigate was overcome, 2 more tried to help and were overcome. ISO & Registration Audit. : week of June 16 ISO14001: Environmental Management: compliance, pollution prevention, waste minimization, assurance ISO18001: OHS/ISM Management: planning for hazard identification, risk assessment and risk control

Technical Support /5/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: