A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction. Customer satisfaction.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Statistical Quality Control Basic Concepts Product Control Process Control Variations in Quality.
Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
Statistical Process Control. 4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  Control Charts.
IES 303 Chapter 4: Process Analysis Week 4 Dec 1, 2005 Objectives:
Total Quality Management A Great Concept But What is IT ?
Chapter 6 - Total Quality Management
IT Services Group 4 Jalal Hafidi Mathew Joseph Tolulope Oke
Continuous Improvement. Ideas of CI Continually seeking ways to improve operations Not unique to quality – also applies to other process improvements.
© 2005 Wiley1 Chapter 5 - Total Quality Management Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
CHAPTER 9 Management of Quality.
Chapter 5 Total Quality Management. What is TQM? Total quality management (TQM) is a philosophy that seeks to improve quality by eliminating causes of.
Chapter 9 Management of Quality McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 6 - Total Quality Management
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 13 Tools for Process Improvement.
Improvement-1. Continuous Improvement Check Do Act Plan Time Quality level Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Part Three TQM – The Tools and the Improvement Cycle
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
9-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Management of Quality.
Chapter 6: Managing Quality BUSI Quality What is quality? In what ways does quality impact the organization? What are some of the reasons why we.
Continuous Improvement Check Do Act Plan Time Quality level.
Chapter 9 Management of Quality
Total Quality Management. 2 A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction.
Dimensions of Service Quality
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Tools for Process Improvement
© 2005 Wiley1 Total Quality Management Chapter 5.
Overview of Total Quality Tools
Tools and Techniques for Performance Excellence
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
Quality Tools.
Quality Prepared By: Ali Siddiqi.
Supply Chain Doctors The Supply Chain Doctors Supply Chain Management Kimball Bullington, Ph.D.
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
© 2005 Wiley1 Total Quality Management Chapter 5.
Quality and Productivity Improvement Check Do Act Plan Time Quality level.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 10 Quality Improvement.
Operations Management For Competitive Advantage 1 Quality Management Operations Management For Competitive Advantage Chapter 7.
Introduction and Implementation of Total Quality Management (TQM)
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 4: Process Analysis Objectives: Introduce some practical.
9-1Management of Quality William J. Stevenson Operations Management 8 th edition.
Chapter 5 – Managing Quality Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
9-1Management of Quality William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Management of Quality.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Management of Quality.
© 2005 Wiley1 Total Quality Management Chapter 5.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Management of Quality
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Quality Management.
© Wiley Total Quality Management by Adnan khan.
Traditional Economic Model of Quality of Conformance
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
BUAD306 Chapter 9 – Management of Quality Chapter 10 – Quality Control (not in text) READ THIS CHAPTER!
© 2005 Wiley1 Total Quality Management Chapter 5.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 9 Management of Quality.
Chapter 07 Process Improvement
6 - 1© 2014 Pearson Education, Inc. Managing Quality PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
Chapter 11 TQM & Quality Tools.
9 Management of Quality.
Continuous Improvement
Quality Certification
Chapter 11 Total Quality Management and Continuous Improvement.
Total Quality Management
Part Three TQM – The Tools and the Improvement Cycle
Scatter Diagrams Slide 1 of 4
Presentation transcript:

A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction. Customer satisfaction = Perception - Expectation Total Quality Management (TQM)

1. Find out what customers want; survey, interview, focused group 2. Design a product that will meet or exceed what customers want. Make it easy to use and easy to produce. 3. Design a production process that make it possible to do the job right at the first time. Determine where mistakes are likely to occur and try to prevent them. When mistakes do occur, find out why, and try to resolve them in a way that they never occur again. Create a mistake-proof process. 4.Keep track of results, use them to improve other parts of the system. Never stop trying to improve. 5.Extend these concept to the whole supply chain; suppliers and distributors. TQM Approach

Continual improvement Competitive benchmarking Employee empowerment Team approach Decisions based on facts Knowledge of tools Suppliers quality Elements of TQM

Continual improvement; –Improve all factors related to input-process-output. –It covers equipment, material, people, and methods. –Just because there is no problem doesn’t mean it can’t be improved. Competitive benchmarking; –Identify companies that are best in something. –study what they do, learn how to improve your operations. –Need not to be in the same field, Xerox used a mail order company, to benchmark its order processing. –We could also have internal benchmarking Elements of TQM

Employee involvement and empowerment; –Responsibility for improvement and authority to make changes provides high motivation in workers. –Personal communication in all levels Team approach; –Use teams for problem solving. –Take advantage of group synergy. –Promote spirit of cooperation. Decisions based on facts –rather than opinions –Statistical thinking Elements of TQM

Knowledge of tools; –Pictorial representation –Tabular representation –Simplification Supplier quality; –Suppliers are an integral part of the TOM. –Make them small in number with full responsibility. –Develop long term relationships. –Eliminate the need to inspect deliveries from suppliers. Elements of TQM

Philosophy that seeks to make never-ending improvements to the process of converting inputs into outputs. Kaizen: Japanese word for continuous improvement. Kaizen : Continuous Improvement

Plan Do Study Act The PDSA Cycle : The essence of Kaizen Conceptual basis for process improvement. Study a current process Then develop a plan for improvement Implement the plan in small scale ( on a portion of the system) Document any change made during this phase Evaluate the results. Check how the results match the original goals of the plan If successful communicate the new methods to all related employees. Implement training for new method. Representing the process with a cycle is to show its continuing nature. If not successful, develop a new plan

Plan Do Study Act The PDSA Cycle Process Improvement Problem Solving

Process improvement is a basic tool in CI, It is composed of process mapping, process analysis, and process re-design. Process mapping; develop a flow chart for the process; show basic steps, inputs and outputs, people involved, decision made, information required, time, cost, space, waste, turnover, quality, morale. Process analysis; Is the flow logical? is there any missing step? is there any unnecessary and extra step? could it be eliminated? does it add value? is there any waste? can we reduce the time and cost, combine some steps? 5W2H Process re-design; document the improvements, measure reductions in time, cost, space, waste, …and improvement in quality, morale. Process Improvement

Systematic problem solving is a basic tool in Continuous Improvement. Its steps are as follows Define the problem and establish an improvement goal Collect data Analyze the problem Generate potential solutions Choose the preferred solution Implement the solution Monitor the solution to see if it accomplishes the goal Problem Solving

The philosophy of making each worker responsible for the quality of his/her work. Quality at Source

Check sheets Flowcharts Scatter diagrams Histograms Pareto analysis Control charts Cause-and-effect diagrams 5W2H Basic Tools for Process Improvement

Billing Errors Wrong Account Wrong Amount A/R Errors Wrong Account Wrong Amount Monday Check Sheet A simple formatted page or a table for record and organize data to identify and analyze a problem. Check sheets are designed based on the purpose of the user. The following format is to identify the number, type, and timing of error. After recording, then we should study why they happen.

Check Sheet The following format is to identify the location of defects on a product ( gloves). After collecting data, then we should analyze the reason for these defects.

flowchart A pictorial representation of a process. Rectangle for processes or procedures, diamond for decisions or check points, arrows for flow of information or work flow,

Scatter Diagram Shows the relationship between two or more variables Humidity # of errors / hr

Frequency Repair time Histogram Histogram is useful in getting a sense of the distribution of the variable of interest.

80% of the problems may be attributed to 20% of the causes. 80% of the problems may be attributed to 20% of the causes. Smeared print Number of defects Off center Missing label Loose Other Pareto Analysis

UCL LCL A statistical chart to see whether a process is in control or not. It is similar to Tracking Signal. If the process is in control, then the value of the corresponding variable is around the mean value with random variations. If the variable is out of UCL or LCL, then it is out of control. Also if we could extract a pattern out of it, again it is out of control. In any of the above cases we should check why the process is out of control. Control Chart (SPC)

Variable Control Chart –X-bar Chart –R Chart Attribute Control Chart –P Chart –C Chart Control Chart (SPC)

UCL LCL UCL Process not centered and not stable Process centered and stable Additional improvements made to the process Tracking Improvements

Effect MaterialsMethods EquipmentPeople Environment Cause Cause and Effect Diagram

EquipmentPersonnel Procedure Material Other Aircraft late to gate Late arrival Gate occupied Mechanical failures late pushback tug Weather Air traffic Late food service Late fuel Late baggage to aircraft Gate agents cannot process passengers quickly enough Too few agents Agents undertrained Agents undermotivated Agents arrive at gate late Late cabin cleaners late or unavailable cockpit crews Late or unavailable cabin crews poor announcement of departures weight an balance sheet late Delayed check-in procedure Confused seat selection Passengers bypass checkin counter Checking oversize baggage Issuance of boarding pass Acceptance of late passengers cutoff too close to departure time Desire to protect late passengers Desire to help company’s income Poor gate locations Delayed Flight Departures Cause and Effect Diagram : Flight Departure Delay

5W2H What What is being done? WhyWhy it is necessary? WhereWhere is it being done? Why it is done there? Should we do it somewhere else? WhenWhen it is done Should we do it at another time? Who Who is doing it? Could someone else do it better? HowHow is it being done? Is there a better method? How muchHow much time does it take? How much does it cost? What would the new cost be?