February 20141 EGNOS Safety of Life service demonstration for Civil Aviation Euromed GNSS II project/MEDUSA.

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago.
Navigation Applications perspective on ADQ
Javier Perez Diestro Air Navigation International Director
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
EGNOS Service Provision Workshop, 4 July EGNOS for freight transport and logistics.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
APAC PBN Seminar F.LECAT (ICAO)
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
Training of Trainers Workshop Reference Centres and Regional Partners in the Performance Review and Assessment of Implementation of the Strategy (PRAIS)
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
1 Enabling EGNOS Approaches in the MEDA Region METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18 November 2009 Víctor Álvarez, Josep Montonlio,
Performance Based Navigation
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Page 1 METIS MEdiTerranean Introduction of GNSS Services METIS – 1st GNSS Regional Plan Workshop 12 th July 2007 Casablanca Technopark - Morocco Telespazio.
Page 1 METIS First Master Training & Seminar MEdiTerranean Introduction of GNSS Services Project Overview FDC Bruno ROUSSEL
UNCTAD ICT and E-Business Branch 9/17/2015 / 1 Joint UNCTAD-ITU-UNESCAP Workshop Information Society Measurements in Asia-Pacific Bangkok, July 2006.
VDA – Vertical Descent Angle
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Project Proposal: Survey and Assessment of Current Deployment of Applications for Surface Transportation Utilizing GNSS in the APEC Region Maureen Walker.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
2008 © European Aviation Safety Agency European Aviation Safety Agency Preparing for new responsibilities Patrick Goudou Executive Director 2008 US/Europe.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding Al-Hoceima Demonstration.
SBAS Implementation in the regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
EGNOS Africa Joint Programme Office 26 th IFATCA AFM RM Accra October 2015 EGNOS - AFRICA Joint Programme Office (JPO) | ASECNA, BP 8163 Dakar Yoff,
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding Application.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding PROJECT PRESENTATION.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
APAC PBN Seminar F.LECAT (ICAO)
UK Performance-based Navigation (PBN) Implementation Status
ASSTAR Overview Jean-Marc Loscos, DSNA
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Developing a Low Level IFR Helicopter Infrastructure
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Capacity Building in aviation
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002
Summary of the results of discussions in the aviation panel
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop for Licensing and Operations
GNSS Approach for General Aviation
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
The evaluation process
WAAS LPV Charting Requirements
The METIS project and EGNOS demonstrations in Civil Aviation
Flight trials data analysis
Presentation transcript:

February EGNOS Safety of Life service demonstration for Civil Aviation Euromed GNSS II project/MEDUSA

February Overview  Goal: technical assistance action to support the operational implementation of GNSS approach (RNP APCH) and EGNOS based approach operations  Airport: Monastir (Tunisia)  RWY 07 and RWY 25  Aircraft: Piaggio P180 Avanti

February Main activities  GNSS approach (RNP APCH) procedures design for RWY 07 (currently ILS) and RWY 25 (currently NPA)  FAS data blocks codification  Airborne data bases generation  Flights campaign for procedures validation  Business case development  Safety assessment  Exploitation towards operational use/elaboration of list of to-dos for the publication of the procedures in the National AIP, including the analysis of regulatory/service provision framework and of GNSS performance data recording/monitoring requirements

February Demonstration/operational validation:  Technical feasibility  Operational feasibility  EGNOS added value and benefits verification  Procedures design and validation  Inputs to the documentation needed for the procedures publication  Technical workshops Technology, experiences and best practices transfer:  Sequence of steps (technical, institutional and regulatory)/list of “to-dos” for the operational exploitation  Assistance for the initial implementation of the steps/“to-dos”  Training and technology handover (e.g. use of GNSS/EGNOS receivers and analysis tools)  Promotional material Main outcomes

February GNSS approaches (RNP APCHs) to RWY 07 In a “3 minima lines combined chart” LPV, LNAV/VNAV (Baro-VNAV) & LNAV Category of AircraftABCD LPV – 2.5% 258 (250) 270 (262) 278 (270) 289 (281) Baro-VNAV 450 (440) 450 (440) 450 (440) 450 (440) Currently ILS minima 320 ft OCA/H proposal for LPV to RWY 07 (ft)

February GNSS approaches (RNP APCHs) to RWY 25 LPV, LNAV/VNAV (Baro-VNAV) & LNAV Category of AircraftABCD LPV – 2.5% 275 (267) 287 (279) 295 (287) 305 (297) Baro-VNAV 360 (350) 360 (350) 360 (350) 360 (350) Currently VOR-DME NPA 460 ft OCA/H proposal for LPV to RWY 25 (ft) In a “3 minima lines combined chart”

February  October-November 2013: GNSS approach (RNP APCH) procedures Business case Safety assessment Training Technical workshop on LPV operational implementation  30 January-1 February 2014: Flights campaign  From February 2014-onwards: Launch of procedures publication/exploitation towards the operational use  4 June 2014: Final workshop open to the civil aviation community of all Euromed countries Key dates

February Flights campaign - Monastir (Tunisia)

February 20149