EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
15 th September 2013 Enagás and TIGF Information to NRAs.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 13 th December 2013 Teleconference 25 th IG Meeting South Gas Regional Initiative.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Discretionary Release Interruptible Entry Capacity 1st November 2007.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
EU Workgroup – Mod 500 WG(4) – 16 th September 2014.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
Modification 500 slides for Workgroup
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Transfer & Trades Special Transmission Workstream
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
CAM What‘s new on November 1, 2015 ? 1  New PIR Alveringem  Interruptible capacities : Sales planned on the Agenda, Interruptibility of backhaul capacities,
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Trades and Transfers Workshop, 6 th November 2007.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Example for 1:n bundling with three TSOs
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Proposer: Matthew Hatch Panel Date: 20/10/16
Capacity Conversion – 616s
26th IG meeting 23th January 2014
CMP Transparency Requirements
Transmission Workstream, 2nd March 06
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
Proposer: National Grid NTS Panel Date: 17th April 2014
Enagás, GRTgaz, REN and TIGF
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Transmission Workgroup June 7th 2012
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Modification 501 slides for Workgroup
Review of Trade and Transfer Winter 09/10
Entry Overrun Calculation
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Gas European Network Code Implementation
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Review Group 221: Review of Questions from Session 2
Capacity validation, renominations and within-day capacity purchase
Presentation transcript:

EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process

Rolling Monthly Surrender process criteriaRMTnTSEC SurrenderCompared to CAM- CMP Surrender Min surrender priceMin surrender price is part of bid submission No min surrender price submitted Max number of offers210 Entitlement checkYes Re-allocation priorityMin surrender price; Surrender before Unsold Surrender timestamp; Unsold before Surrender Credit received by UserPrice of the bid the surrender was used to allocate Clearing price of auction Unused surrender quantity Returned to User Auction(s)Rolling Monthly onlyAnnual, Quarterly & RM 2 Note: a minimum surrender re-allocation quantity is not specified under the existing Surrender process

CAM-CMP surrender offers  No min reallocation quantity for CAM surrender offers  Surrender offers must be offered unconditionally to shippers via PRISMA  Consistent approach with other TSOs  In line with precedent under TnT Surrenders  No min surrender price for CAM surrender offers  Main purpose of economically ordering Surrenders for re- allocation is now redundant (CMP mandates timestamp)  Shippers still guaranteed to get at least reserve price (over last 12 months no shipper has submitted a min surrender price above the reserve price of the auction) 3

EU Workgroup – mod 500 Units – kWh/h & kWh/d

5 kWh/day and kWh/hour - Proposal  NG currently sells all capacity in kWh/d  IUK & BBL sell capacity in kWh/h. Irish sell capacity in kWh/d.  How is a bundled product marketed?  kWh/h or kWh/d (CAM allows both)  A pragmatic option would be for NG/Adjacent TSO to offer capacity in kWh/h at the Bacton IPs.  Maintain kWh/d at Moffat.  NG would convert Available Capacity (and corresponding price) from kWh/d to kWh/h for marketing on PRISMA. PRISMA uses kWh/h.

Example conversions  NG Obligation  NG available capacity: 240 kWh/day  Conversion: 240 kWh/d 10 kWh/h  Marketed on PRISMA as 10 kWh/h/runtime  Shipper perspective  For all auctions, except within day, the daily right will be the capacity purchased (in kWh/h) x 24.  For within day auctions, the daily right will be the capacity purchased (in kWh/h) x remaining hrs in the day. 6

Implication - Reducing Within Day Obligation kWh/h kWh/d 10  10 kWh/h offered for a whole day equates to an offer of 240 kWh/d.  10 kWh/h offered for the remaining half of a day equates to an offer of 120 kWh/d.  This effectively means the capacity offered, as measured in kWh/d, reduces as the day progresses hrs

Alternative – Increasing kWh/h obligation  To have a flat within day obligation (as measured in kWh/d) NG would have to ramp up the amount offered in kWh/h e.g. for 240 kWh/d obligation:  For 24hrs remaining then 10 kWh/h offered  For 6hrs remaining then 40 kWh/h offered  For 1 hr remaining then 240 kWh/h offered  However other TSO operating in kWh/h do not do this.  So assuming a matching technical capacity of 240 kWh/d on either side of the IP.  For the last hour of the day - 10 kWh/h would be offered bundled; the remaining 230 kWh/h would be unbundled 8

NG view – Bacton IPs only  Proposal - the daily obligation is converted into an hourly obligation by dividing by 24. The hourly obligation remains constant throughout the within day auctions  From a technical view point, a reducing within day obligation makes sense as it matches the physical capability of the pipeline  It would be a consistent approach with adjacent TSOs operating in kWh/h & avoids large amounts of unbundled capacity being offered  PRISMA has a within day functionality that TSOs can use; this assumes a flat hourly offering of capacity.  Overruns continue to be measured at a daily granularity. NG still has the ability to release non-obligated capacity 9