SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.

Slides:



Advertisements
Similar presentations
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Advertisements

TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
ILC-BAW1 Interim Summary and Further Plan Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 9, ,
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
SCRF Monthly WebEx Meeting May 6, 2010
Conventional Facilities and Siting Global Group (ARCFS)
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D Plan (Rel. 5) Preparation(30 min.) 2.BAW-1 Preparation (10 min.) 3.Others 1.Next meeting, July, , A. Yamamoto1SCRF WebEx Meeting

Report from PMs GDE meeting held, – ADI meeting: June Hz Low-Energy Operation – 10 Hz is for e- linac for producing e+, and – 5 Hz for e+/e- collision, CFS Integration workshops (planned) in July and August – Daresbury Laboratory: July 12 – 13, E+ source, damping ring, BDS, and Detectors, – SLAC: Aug. 2-3, E- source, RTML, ML, and Detectors, ML utility (water, and electricity) to be discussed, ICHEP High Energy Conference, >> Transition from TDP-1 to TDP-2 – Held at Paris, July 22 - Baseline Assessment Workshop (BAW) – 1, planned – Held at KEK on Sept. 7 – 10, Single tunnel HLRF (Sept. 7 – 8) Accelerating Cavity Gradient (Sept ) FLASH workshop – Held at DESY on Oct. 4 – 7, ILC-CLIC collaboration meeting – Held at CERN on Oct. 18 – , A. Yamamoto2SCRF WebEx Meeting

TDP R&D Plan Rel-5: Draft , A. Yamamoto 3 SCRF WebEx Meeting Discuss it, today

SCRF Main Subjects 1a. Request for Rongli G.: Proposal for R&D plan and strategy for improving the cavity gradient, Q0, and radiation, Proposal for the way of evaluation in terms of radiation which also cause the limit of the gradient, 1b. Request for Camille G.: Proposal for further evaluation of the cavity performance based on the current status of the production yield plot, –spread of cavity gradient and the quantitative evaluation with a new plot and width (RMS), –Q0 value evaluation at G = 31.5 MV/m, 1c. Request for Akira in communication with Jim K Proposal for re-arrangement for the cavity/cryomodule cavity gradient specification for the iLC accelerator components and for the operation , A. Yamamoto SCRF WebEx Meeting 4

SCRF Major Subjects 2a. Request for Hitoshi H.; Proposal for R&D plan for the cavity integration including tuners and input couplers, including a systematic test plan for S1-Global, which contain these evaluation, Proposal for a cavity fabrication (and industrial R&D) facility to be estalished at KEK as an approach, 2b. Request for Jim K. in communication with Bob K. : Proposal for R&D plan for the cavity mass production in the US, 2c. Request for Akira (myself) in communication with DESY (Nick will help me), Input and reflection of the progress in XFEL mass production program, , A. Yamamoto SCRF WebEx Meeting 5

SCRF Major Subjects 3. Request for Norihito and Tom in cooperation with Harry and Hirotaka Proposal for R&D plan for the cryomodule integration, including the cryomodule assembly and cryogenic test plan for S1 Global and for further (S2 cryomodule), 4. Request for Shigeki F. and Chris N. ; Proposal for R&D plan for KCS and DRFS in single tunnel - Further proposal for ACD RF such as Marx Generators, 5. Request for Chris A. in communication with Jim K., and Vladimir K. Proposal for R&D plan for split-quadrupole in cryomodule, Proposal for R&D plan for cavity alignment and tolerances, 6. Any others, if they should be included , A. Yamamoto SCRF WebEx Meeting 6

R&D Plan To be updated Draft due: June 11 from Group Leaders and Collaborators SCRF Draft Completion; June , A. Yamamoto SCRF WebEx Meeting 7

1 st BAW Announced, May 3 Date: Sept. 7 – 10, 2010 Place: KEK Subjects: – Single tunnel HLRF systems (Sept. 7 – 8) – Accelerating gradient (Sept. 9-10) Announcement – Distributed to GDE mailing list including physics/detector executive members, URL and Indico Agenda including registration – Still to be prepared, and ask for Tetsuo’s cooperation , A. Yamamoto8SCRF WebEx Meeting

Preparation for the 1 st BAW May 7: SCRF webex meeting and homework assignment May 26: AD&I meeting June 2: SCRF webex meeting and progress report from each collaborator, June 23: AD&I meeting June 30:SCRF webex meeting and preliminary draft report to be distributed >>> in progress, assuming R&D plan draft can be partly used. July 21: AD&I meeting July 28: SCRF meeting and draft report to be distributed, Aug. 25: SCRF meeting and the final report (prior to the 1 st BAW) to be distributed , A. Yamamoto9SCRF WebEx Meeting

Discussion Topics: Single-tunnel HLRF system in the 1 st BAW, Sept. 7-8, 2010 KCS: – RF power margin required for cluster operation, including gradient spread, as consistent with cavity production strategy, – Tuning and control strategy, including impact on high gradient operation and required gradient operational margin – RF amplitude and phase performance tolerance within a cluster; allowed common-mode and normal-mode fluctuations, – R&D required, including demonstrations of component performance and demonstrations with small clusters DRFS: – Cavity and klystron sorting and resulting required RF power margins – Installation strategy; needed tunnel infrastructure and access – RF amplitude and phase performance tolerances, including gradient spread, as consistent with cavity production strategy, – R&D required in the remaining half of the TDP (and beyond) including radiation shielding, klystron lifetime, redundancy strategies Backups: – Original RF system in RDR, in single tunnel, just in case, as a backup, , A. Yamamoto10SCRF WebEx Meeting

Discussion Topics: Accelerating Gradiet 1 st BAW, KEK, Sept. 9-10, 2010 Gradient Improvement Studies: – material/fabrication, surface processing, instrumentation and repair – strategy to overcome 'quench', and 'field emission' and to maintain moderate cryogenic load, – improvement of gradient and achievement of adequate yield, Strategy for Average Accelerating Gradient in the ILC: – Overview and scope of 'production yield' progress and expectations for TDP, including acceptable spread of the gradient needed to achieve the specified average gradient, – Specifications of Gradient, Q0, and Emitted Radiation in vertical test, including the spread and yield, – Specifications of Gradient, Cryogenic-load and Radiation, including the gradient spread and operational margin with nominal controls, in cryomodule test, – Specifications of Gradient, Cryogenic-load and Radiation, including the gradient spread and the operational margin with nominal controls in beam acceleration test, – Strategy to define and specify 'Emitted Radiation', (Radiation that may result in increased cryogenic-load and usable gradient limitations), – Strategy for tuning and control, including feedback, control of ‘Lorentz force detuning’, tolerances and availability margin, – Impact on other accelerator systems: CFS, HLRF, LLRF, Cryogenics, and overall costs , A. Yamamoto11SCRF WebEx Meeting

2010 TLCC timeline PAC Review – May (Valencia) – November (Eugene) Assignment of LoI and MDI contact persons Wednesday Webex meetings – (all or part) – SRF, CFS, AS, AD&I – preparation for Baseline Workshops ECFA LC Workshop - together with CLIC team (Geneva) Baseline Workshops – September 7-10, 2010 (KEK) – January 18-21, 2011 (SLAC) – Each Workshop is to culminate in a document, to be submitted to the Project Director – Requires Preparation / discussion in advance , A. Yamamoto SCRF WebEx Meeting 12

Next SCRF WebEx July 28 – Draft report for BAW-1. – Please help us to prepare for the meeting to be successfully carried out – , A. Yamamoto13SCRF WebEx Meeting