Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima.

Slides:



Advertisements
Similar presentations
RC Strategy Implementation. What we are asking for… Authorization to hire Black and Veatch to develop and issue the two RFPs associated with the RC Strategic.
Advertisements

Fukushima Nuclear Disaster Moneer Aljawad, Abdulrahman Alshodokhi, Jericho Alves, Daniel Chief, Benjamin Kurtz, Travis Moore September 16, 2013.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Vetting and managing subcontractors – avoiding the bear traps Wayne Hughes HQN.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
Meltdown alert at Japan reactor Technicians are battling to stabilise a third reactor at a quake-stricken Japanese nuclear plant, which has been rocked.
Confined spaces Controlling hazards and minimizing risks.
Recent Fukushima Information CNS Ottawa Branch Thursday, April 21, April-06 Japan’s Nuclear Emergency[METI].pdf AREVA Fukushima.pdf.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Tang Report 2001 “Construct for Excellence”. Background Sub-standard foundation works in several public housing developments in 1999 The Secretary for.
Tang Report 2001 “Construct for Excellence”. UK Experience 11 reports during Gov’t and private clients as drivers Themes such as relationships.
What do Employers look for in Postgraduate applicants?
Jed Harrison Office of Radiation & Indoor Air.  Review the Incident – What Happened  Describe the EPA Response  Review EPA’s RadNet Monitoring System.
EPA’s Response to Fukushima Japan Nuclear Emergency Mike Boyd, Senior Health Physicist EPA/Office of Radiation & Indoor Air Presented at 2011 OAS Annual.
United States Department of Agriculture Office of Procurement and Property Management Effective Negotiation Refresher August 2008 Exhibit 1.
1 TEPCO’s In-house Competitions for Improving Radiation Protection Skills Junichi TAIRA Tokyo Electric Power Company Radiation Protection Group ISOE International.
International Workshop on Radiation and Thyroid Cancer Summary/Conclusions and Recommendations – Day 3 From RERF LSS: Excess relative risk goes down with.
International Workshop on Radiation and Thyroid Cancer Concluding Remarks Since 1950 the global incidence of thyroid cancer has been increasing, even without.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
IT’S NOT OVER YET! THE FUKUSHIMA FACILITY IS STILL LEAKING RADIATION INTO THE AIR DAY 14 MARCH 25, 2011 Walter Hays, Global Alliance for Disaster Reduction,
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
Team 6 Special Projects InsurancePRIDERESPECT Management Consulting Services P-Card Services Software Training Benefit Consulting Services IT Consulting.
Ivan Li and Kyle Krogman.  Nuclear reactor meltdown on March 11 th 2011 near Fukushima, Japan  An earthquake and the following tsunami knocked out electrical.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
Technical Manager; Bechtel Oil, Gas & Chemicals.
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
Compensation events and claims Presented by Prof. Khem Dallakoti.
TOPIC-9- PROJECT ORGANIZATION
Age Discrimination Default Retirement Age (DRA) Alison Collins 9 th February 2011.
ReEntry Now They Are Coming Back!. Purpose: To promote and facilitate the timely reentry of essential response and recovery personnel, governmental officials,
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Fukushima Nuclear Disaster Team Alpha Student1 Name, Student2 Name, Student3 Name, Student4 Name, Student5 Name.
September 22, 2010 Strategic Aerospace and Defence Initiative (SADI) Program Overview.
Nuclear Accident at the Fukushima Dai-ichi NPP June 2, 2011 Embassy of Japan in Bulgaria.
Fukushima Daiichi Nuclear Power Plant Accident Taizo Yakushiji.
Fukushima Dai-ichi - LinkLink. Boiling Water Reactor – Video LinkVideo Link.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Proposed Modifications to the Gated Community Ordinance Board of County Commissioners April 8, 2008.
Georgia Institute of Technology CS 4320 Fall 2003.
Presentation To BAM Construction by Steve Fearnehough Crossway MD.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
AMERICAN RED CROSS INTERNATIONAL DISASTER RESPONSE Great East Japan Earthquake.
TOPIC-9- PROJECT ORGANIZATION
TEAM–IFPTE Local 161 Employee feedback on the subject of contractors, and the business case for a different approach Compiled in response to MTS Allstream.
Radiological Assessment - of effects from - Fukushima Daiichi Nuclear Power Plant April 7, 2011.
Grab binders & handouts, begin the Do Now
What you need to know about handling major school works 5 th July 2013.
Conventional Nuclear Fission nuclear fuel cycle: producing uranium ore used in nuclear reactors & disposing of radioactive wastes.
A LTERNATIVE ENERGY : NUCLEAR Group 4 Bar Shida Keane.
Fukushima I nuclear accident, March 11, 2011 What happened, why and a better design.
NONRENEWABLE AND RENEWABLE RESOURCES. NONRENEWABLE RESOURCES A nonrenewable resource is a natural resource that cannot be re-made or re-grown at a scale.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
(1) On 11 March 2011, Japan had a big earthquake and tsunami, leading to _________ in Fukushima. (nuclear emission)
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Solamon Energy Sources Japan had missteps in radiation problem.
ISO/IEC
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
Occupational Radiation Protection during High Exposure Operations
NONRENEWABLE AND RENEWABLE RESOURCES
Spent Fuel Pool Instrumentation NRC Order EA
The value of a project-oriented approach to IT and how we do it in IBM
FUKUSHIMA DAI-ICHI NUCLEAR DISASTER Organizational accident analysis
REMOVAL AND RELOCATION OF SPENT NUCLEAR FUEL FROM THE SAN DIEGO REGION
Fukushima Lessons Learned
Fertilizer Industry Safety Information Analysis and Sharing Program
PLANNING & SCHEDULING (First Part)
JAPAN Hiroshima Nagasaki
Presentation transcript:

Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

1 Building of Unit 4 at Fukushima Daiichi Building of Unit 4 at Fukushima Daiichi Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi UNIT 4

Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Building of Unit 3 at Fukushima Daiichi Building of Unit 3 at Fukushima Daiichi 2 UNIT 3

Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Temporary Seawall at Fukushima Daiichi Temporary Seawall at Fukushima Daiichi 3

Facts at Fukushima Daiichi Facts at Fukushima Daiichi Hoses for Contaminated Cooling Water Quote TEPCO 4

Facts at Fukushima Daiichi Facts at Fukushima Daiichi Route of Cooling Water Hoses and Leakages Route of Cooling Water Hoses and Leakages Quote TEPCO 5

Fuel Debris Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Present Status of Fuel Debris (Estimated) Present Status of Fuel Debris (Estimated) 6 Quote EPRI

Spent Fuel Removal Quote TEPCO Tasks at Fukushima Daiichi Tasks at Fukushima Daiichi 7

Steps for Fuel Debris Removal Steps for Fuel Debris Removal Repair of PCV (lower) Fuel Debris Removal 9 Quote TEPCO Tasks at Fukushima Daiichi Tasks at Fukushima Daiichi 8

TMI-2 Cleanup Experience TMI-2 Cleanup Experience 11 Quote TEPCO Fuel Removal Quote EPRI 9 Annual Doses at TMI-2 and TEPCO’s Estimation of Man Power Requirement

Appeal of SVCF Appeal of SVCF Statement SVCF requests: SVCF requests: Skilled Veterans be allowed to work at Fukushima Daiichi to reduce doses for Younger Workers 10

Appeal of SVCF Appeal of SVCF Progress 11 March 11, 2011Earthquake and Tsunami April 10, 2011First Appeal was delivered May 4, 2011First negotiation with TEPCO May 24, 2011Meeting with Mr. Hosono and TEPCO July 12, 2011SVCF Inspection Team to Fukushima Daiichi August 3, 2011Proposal to Government and to TEPCO

Limited Responcibility by TEPCO for Dose Control Barrier for Fukushima Daiichi Barrier for Fukushima Daiichi a a c c 2 nd Sub- Contractors b b d d TEPCO Fukushima Daiichi Prime Contractors Workers Dose Control for Workers within Fukushima Daiichi e e A A Sub- Contractors Dose Control by Employer not to Exceed Limit Value B B C C D D F F 3 rd Sub- Contractor s Dose Control by Each Worker 400 Contractors Workers E E 12

Proposal For National Project Proposal For National Project Necessity of National Project 1. Independent from TEPCO 2. Employ worldwide expertise 3. Integrated Project management 4. International inspection team 13 Fukushima Daiichi TEPCO National Project Even TEPCO is owned by the government it is still profit oriented private company, as the same case as GM

Proposal For National Project Proposal For National Project Necessity of National Project 1.Project Team shall be independent from TEPCO There are so many issues are not known at Fukushima Daiichi, that a profit oriented company never has capabilities to deal with such a project Presently the project cannot be open and clear due to TEPCO’s own interest 14

Proposal For National Project Proposal For National Project Concentrate Capabilities Worldwidely 18 2.The Project Team shall employ capabilities, knowledge, experiences from all over the world Fukushima Daiichi is more complex than Chernobyl, and larger in size than TMI-2 The project cannot be handled only by Nuclear Specialists. It’s much complicated Engineering Project The Project members shall be from TEPCO, Hitachi, Toshiba; and also experienced engineers from Chernobyl, TMI-2, as well as Bechtel, Fluor, TEC, JGC, Chiyoda and/or other companies 15

Proposal For National Project Proposal For National Project Integration of Operation, Clean-up, and R&D 3.Integrated Project Management, including progress, quality, cost, and radiation exposure control shall be applied Project shall be managed in integrated way and avoid multi-layered contract system Workers shall be employed directly by the Project Team, unless specially required Allocation of workers including SVCF’s members shall be optimized considering dose in relation to age, skill, work place, etc. 17

Proposal For National Project Proposal For National Project Integrated Project Management 20 4.Inspection Team consisting of international members shall be formed Independent Inspection Team shall be free to check safety, progress, etc. to minimize risk of accident and minimize the cost and time 17

Proposal For National Project Proposal For National Project International Inspection Team SVCF appeals you: to speak up and to ask your Government to request Japan Government that: 18 1.Form a National Project Team for Containment and Cleanup of Fukushima Daiichi, which is independent from TEPCO 2.Utilize all of the assets in the world 3.Integrated Project Management shall be the key replacing traditional multi-layered sub-contract structure 4.International Inspection Team be established