GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.

Slides:



Advertisements
Similar presentations
Operations Portal & Client Connection: Real-time Project Management Tool.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
LLNL and LANL Portal Update Cathy Aaron, Lawrence Livermore National Laboratory Katherine Norskog, Los Alamos National Laboratory Presented at InterLab.
ETD: doing it together Lluís M. Anglada Consortium of Academic Libraries of Catalonia (CBUC) ETD 2003 Berlin, May 22nd, 2003.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Sara Bowman Center for Open Science Open Science Framework: Facilitating Transparency and Reproducibility.
Introduction IT Department at CEU Contribution to carry out CEU’s mission with appropriate: -Information technology tools and services -Hardware and software.
Information and Communication Technologies in the field of general education in Armenia NATIONAL CENTER OF EDUCATIONAL TECHNOLOGIES.
Turkey IDA Info-Day PM Session, September 25, 2003 CIRCA 1 CIRCA : The IDA Collaborative Software Tool Grzegorz Ambroziewicz European Commission - DG Enterprise.
GAP general meeting ESTEC September 2012 GAP M3 - General meeting OUTREACH X. Luri, S. Jordan.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
The Preparatory Phase Proposal a first draft to be discussed.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
GENIUS kick-off - November 2013 GENIUS kick-off meeting WP100 - management X. Luri.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
GENIUS kick-off - November 2013 GENIUS kick-off meeting WP400 – Tools for data exploitation X. Luri.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 services evolution (after the end of EGI-InSPIRE) Peter Solagna, Michel.
U.S. Department of the Interior U.S. Geological Survey The Science Data Coordinator Network (SDCN) Presentation to CDI.
Summary of distributed tools of potential use for JRA3 Dugan Witherick HPC Programmer for the Miracle Consortium University College.
GRID IIII D UK Particle Physics GridPP Collaboration meeting - R.P.Middleton (RAL/PPD) 23-25th May Grid Monitoring Services Robin Middleton RAL/PPD24-May-01.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme The EU-IndiaGrid Project Joining.
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
WP6 Infrastructure Resource Market Place Overview of progress UEssex High-Performance Network Group.
WP9 – Earth Observation Applications – n° 1 WP9 report to Plenary ESA, KNMI, IPSL Presented by M. Petitdidier, IPSL DataGrid Plenary Session 5 th Project.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
The Future ENES Strategy – Toward a Foresight Document Jochem Marotzke Max Planck Institute for Meteorology (MPI-M) German Climate Computing Centre (DKRZ)
The II SAS Testbed Site Jan Astalos - Institute of Informatics Slovak Academy of Sciences.
Seamus Ross Director, HATII & ERPANET Associate Director of DCC Services Funders: Service Definition & Delivery Digital Curation Centre a centre of expertise.
NA2 objectives The „v.E.R.C.“ (virtual Earth System Resource Center) v.E.R.C is: A (technical) infrastructure to improve the utilization of the ESM core-infrastructure,
P.O. Box AL Maastricht The Netherlands RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 DeSurvey Module 1.8 ‘Integration towards a.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
Tom Furlani Director, Center for Computational Research SUNY Buffalo Metrics for HPC September 30, 2010.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme WP5 Application Support Marco.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
WP 1: Durable community building Päivi Majaranta COGAIN Kick-Off Tampere, Finland.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Jens Hartmann York Sure Raphael Volz Rudi Studer The OntoWeb Portal.
GENIUS Kick-Off meeting December 4th 2013 WP-620 Simulated catalogue data Francesc Julbe UB – IEEC, Barcelona.
Toward a common data and command representation for quantum chemistry Malcolm Atkinson Director 5 th April 2004.
GFOI Component Coordination and Country Engagement SDCG-8, Session 10 Stephen Ward (Australia) 24 Sep 2015, Bonn.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner.
Spring 2004 Internet2 Member Meeting NLR Service Center Update Dave Jent Indiana University.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
Delivers local and global resources and OCLC e-Content in a single search Paul Cappuzzello Senior Library Services Consultant
Delivers local and global resources in a single search The first, easy step toward the first cooperative library service on the Web WorldCat Local “quick.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Break out group coordinator:
INTAROS – Integrated Arctic Observation System
Year One: Project implementation overview
Ian Bird GDB Meeting CERN 9 September 2003
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
SGS for OUSIM Meeting goals:
Universitat de Barcelona / FBG
WTO Trade Facilitation Agreement Facility (TFAF)
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
Presentation transcript:

GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University of Cambridge: 12PM Objective: Support activities needed for the development of the tasks in the rest of WPs Three subpackages: 610. Technical coordination: collaboration with the Genius Exec Board (1 UB) 620. Simulated catalogue data (12 CESCA + 5 UB) 630. Science alerts testbed (12 UCAM) 640. Community portal infrastructure (12 CESCA)

620. Simulated catalogue data (more details by F. Julbe) Provision of simulated catalogues to fill the database with realistic data allowing testing and development of the archive prototype and tools Simulations will be generated by the Gaia Object Generator (GOG) (developed by DPAC’s CU2) GOG will be run at HPC facilities at CESCA who also provides technical support Three deliveries of the full simulated catalogue are expected + some specific smaller tests may also be provided, on request

630. Science alerts testbed (lead by N. Walton) Gaia science alerts processing carried at Cambridge (DPCI). Alerts have to reach the community as soon as possible. The WP will be in charge of developping the interfaces required to connect the science alert processing (including classification etc) with the main Gaia processing. The information for a region (or alert) will grow as the mission progresses. The end product will be enhanced access to science alert data Community portal infrastructure (more info by E. Masana) The portal will include all the useful information about the project: Documents, links, alerts, tutorials, etc. The basic infrastructure will be delivered and maintenance plan prepared. The portal has to provide updated information and links to social networks.

Main Deliverables: -Community portal (6, 24, 42 months) -Simulated data catalogues (6, 18, 30 months) -Science alert prototypes (12, 24, 36 months)