Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE 23.11.2012.

Slides:



Advertisements
Similar presentations
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Advertisements

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – System Upgrades and Individual System Tests of the 13.
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
58 th MPE-TM – October 2, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report Energy Extraction Systems On behalf of all EE teams involved.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
7.2.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Resistance Between Two Given Points in.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Upgrade of the Breakers Control Module in 13 kA EE systems Bozhidar Panev TE-MPE-EE
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Upgrade, IST and Powering tests of the 13kA Energy Extraction system Bozhidar Panev – LS1 Review.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Report on problem in opening the 13kA EE system (issue recently found during last CSCM) Bozhidar Panev
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
For more info:
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
TE/MPE/EE Summary of Electrical Engineering Session Ed & Knud K. Dahlerup-Petersen TE/MPE/EE 23 November RB – RQ EE facility consolidation & upgrades.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
TE-MPE LS1 workshop – November 22-23, 2012 G.J. Coelingh TE-MPE-EE LS1 The upgrade of 600 A ENERGY EXTRACTION SYSTEMS.
TE-MPE -EI 23/6/2011,Antonopoulou Evangelia RQS circuit Simulation results of Quench Antonopoulou Evangelia June 2011 Thanks to E. Ravaioli.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
TE-CRG Activities D. Delikaris, TE-CRG.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Mikhail Ovsienko TE-MPE-EE
AD consolidation activities in LS2
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Powering the LHC Magnets
MPE main activities planned for LS2
Renovation of the 45-year old PS magnets
Consolidation of the dipole diode insulation Technical aspects
LS1 TE/MPE/EE CABLE ACTIVITIES
CNGS horn / reflector in 2005: The story of the glass ring insulator
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Other arguments to train two sectors to 7 TeV
Presentation transcript:

Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE

Installation of Snubber capacitors in RQD/F EE systems The benefit: To suppress the voltage transient perturbations in the circuits during switch commutation and to make the opening process lighter by reducing the electrical arc existence All 16 EE systems of RQD/F circuits will be equipped. Four snubber capacitors per system + associated auxiliary boards  in total 64 snubbers and 64 boards All parts and components have been manufactured, commissioned, packed and prepared to be transported to each UA area. Transport will be required 2

Difficulties during the installation: Installation of Snubber capacitors in RQD/F EE systems The last issue has been discussed with S. Pelletier from transport service in the presence of a safety person. The accepted solution is to use a lifting mechanism, fixed at the ceiling inside of the switch housing.  Limited space inside the switch acoustic shield housing  The installation of snubbers on the upper stage requires to lift and handle heavy stuff at 2m height over the ground. The IHEP team (4 experienced persons) is scheduled to perform the work. All of them have previously participated in the EE systems maintenance and the RB snubbers installation The work is planed to start in May The time estimation is 3 days per one UA area  24 days in total 3

New arc chambers for RQD/F EE switches  Identical design as in the dipole EE systems  Good performance up to 1050V (arc feeding voltage) is guaranteed  All chambers have been delivered to CERN earlier this year It will be combined with snubber capacitors installation. Two sectors (S12 and S23) are already equipped. Still 12 EE systems  96 arc chambers have to be replaced. The currently installed arc chambers  up to 200V arc feeding voltage (design specification and hard limit) The new arc chambers: The activity does not require the transport service 4

To prevent the potential damage of the DQRBs in case of double amount of energy deposited in the dump resistors Difficulties  mainly due to lack of space at the end of some DQRBs Mechanical modification in all RB dump resistors (DQRB) 53 dump resistors (16 RB EE systems + spares) will be modified. The estimated time  3 DQRBs per day  ~ 20 days totally The activity is scheduled to start in July The IHEP team + AGH team (3 persons) will perform the work.  e.g. in P1, P3 and P5 the “Roman pots” or beam pipe supports are placed between dump resistors The transport service will be involved to move temporarily some dump resistors in order to gain enough space 5

RB Dump resistors – thermostat replacement The installation of new thermostat is not fully completed  Two dump resistors: one in RR73 and one in RR77 still need to be equipped Difficulty:  Resistors are blocked by concrete shield and there is little access for manipulation During next TS both two places will be visited and carefully observed The activity is planed to start in Aug Expected duration: One week IHEP team + AGH team will be involved 6

A recent inspection has found the significant erosion of contacts due to electrical arc. The risk to burn the holding coil increases. In the beginning of closing process I = 22A(230V) then switched to 0.5A(8V) As a part of preventive maintenance it has been decided to replace these relays in all EE systems (RB and RQD/F) Power switching relay (230V/8V) of holding coil (RL4,6,8,10 in BCMs) 8 relays per EE system  32 systems  256 relays in total The new selected relay (still under consideration):  Better contact material - AgSnO2 instead of AgCdO  Maximum peak current - (4 times higher) TE-MPE-EE staff will perform the activity. 7

Dump resistors re-configuration The activity is planed to start in Sep. and will take 2 weeks The work will be executed by IHEP team + AGH team + TE-MPE-EE The expected new conditions in LHC after LS1 require a new configuration of the dump resistors in RB and RQD/F EE systems RB_EE system  requires only cable reconnection to get all three resistors in parallel RQD/F_EE system  dump resistor internal modification - Curren situation: R = * = 28.9 mΩ (51 MQ / circuit) R = * = 27.8 mΩ (47 MQ / circuit) - After LS1: R = * = 18.9 mΩ (51 MQ / circuit) R = * = 17.8 mΩ (47 MQ / circuit) 8

RB Dump resistor – 4 water cooling stations relocation in P1 and P5 The reason: Installation of new collimators in the place which, currently occupied by water cooling station Cooling stations together with adjacent electrical cupboards will be moved on top of one of the RB-dump resistors. Such a installation has already been done in P3 EN-CV and EN-EL will be involved The activity is scheduled to start  in Aug. and it will take 2 weeks. The participants  AGH team (3 persons) + TE-MPE-EE 9

Water cooled cable exchange of some 13kA EE systems Cracks in the rubber of the water cooled cables have been observed close to the connection point with “busway” All cables susceptible of containing such a cracks will be replaced:  P4 right  RB, RQD/F  P6 left & right  RB, RQD/F  P8 left and right  RB, RQD/F The work will be performed by EN-EL. The presence of a EE specialist is needed during establishing the connection with the switch “busway” The voltage drop measured across the connection point must determine the resistance of  ≈ 0.6 μΩ Modification in SUM_Fault electronic board A few suspected diodes will be replaced The signal “ST_OPENFAIL” will be removed by hardware modification 32 PCBs will be modified  1 per EE system TE-MPE-EE staff will perform the work. 10

General maintenance of all 13kA EE systems Micro-switches(S1/2/3/4) functional check Air gaps of the breakers (∆1 and ∆2)  measurement and adjustment Mechanical pressure verification of the main contacts  adjustment if required Cleaning of the main and arcing contacts Time delay check (600ms and 340ms) only RB EE system Verification of all bolted electrical connection All 32 EE systems (RB and RQD/F) The activity is scheduled for Sep.-Oct and it will take ~1.5 months The work will be performed by IHEP team + AGH team supervised by TE-MPE-EE 11

Recourses and Conclusions The main contract with IHEP is ready for approval but not yet signed As a back up solution  The AGH team can handle the work but some training is needed in order to get more familiar with the EE systems. In that scenario at least 30% more time must be added All technical details are determined and most of the equipment is already available All issues are included in Katy’s general planning CERN supervision team is: Mathieu, Knud, Bozhidar 12