Keith Beven Lancaster University, UK

Slides:



Advertisements
Similar presentations
Introduction Describe what panel data is and the reasons for using it in this format Assess the importance of fixed and random effects Examine the Hausman.
Advertisements

Outcomes of The Living Murray Icon Sites Application Project Stuart Little Project Officer, The Living Murray Environmental Monitoring eWater CRC Participants.
1 Uncertainty in rainfall-runoff simulations An introduction and review of different techniques M. Shafii, Dept. Of Hydrology, Feb
Running a model's adjoint to obtain derivatives, while more efficient and accurate than other methods, such as the finite difference method, is a computationally.
What is research? Lecture 2 INFO61003 Harold Somers.
Biointelligence Laboratory, Seoul National University
Data Mining Methodology 1. Why have a Methodology  Don’t want to learn things that aren’t true May not represent any underlying reality ○ Spurious correlation.
Bayesian inference “Very much lies in the posterior distribution” Bayesian definition of sufficiency: A statistic T (x 1, …, x n ) is sufficient for 
Model calibration using. Pag. 5/3/20152 PEST program.
Testing hydrological models as hypotheses: a limits of acceptability approach and the issue of disinformation Keith Beven, Paul Smith and Andy Wood Lancaster.
ESTIMATING THE 100-YEAR FLOOD FORDECORAH USING THE RAINFALL EVENTS OF THE RIVER'S CATCHMENT By Kai TsurutaFaculty Advisor: Richard Bernatz Abstract:This.
This presentation is available for download at the website: Information: OBSERVATIONAL UNCERTAINTIES.
This presentation can be downloaded at XXXII Convegno Nazionale di Idraulica e Costruzioni Idrauliche XXXII Italian Conference.
This presentation can be downloaded at Water Cycle Projections over Decades to Centuries at River Basin to Regional Scales:
PROVIDING DISTRIBUTED FORECASTS OF PRECIPITATION USING A STATISTICAL NOWCAST SCHEME Neil I. Fox and Chris K. Wikle University of Missouri- Columbia.
Elementary hypothesis testing
Methodology in quantitative research Bas Kooijman Dept theoretical biology Vrije Universiteit Amsterdam master course.
458 Model Uncertainty and Model Selection Fish 458, Lecture 13.
Structural uncertainty from an economists’ perspective
Statistical Methods Chichang Jou Tamkang University.
Elementary hypothesis testing Purpose of hypothesis testing Type of hypotheses Type of errors Critical regions Significant levels Hypothesis vs intervals.
Linear and generalised linear models
The Calibration Process
Linear and generalised linear models
The Paradigm of Econometrics Based on Greene’s Note 1.
A prediction or a forecast is a statement about the way things will happen in the future, often but not always based on experience or knowledge. While.
1 D r a f t Life Cycle Assessment A product-oriented method for sustainability analysis UNEP LCA Training Kit Module k – Uncertainty in LCA.
Local flood forecasting for local flood risk areas Keith Beven, David Leedal, Peter Young and Paul Smith Lancaster Environment Centre.
Single and Multiple Spell Discrete Time Hazards Models with Parametric and Non-Parametric Corrections for Unobserved Heterogeneity David K. Guilkey.
1 Enviromatics Environmental statistics Environmental statistics Вонр. проф. д-р Александар Маркоски Технички факултет – Битола 2008 год.
Calibration Guidelines 1. Start simple, add complexity carefully 2. Use a broad range of information 3. Be well-posed & be comprehensive 4. Include diverse.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
WP4: Models to predict & test recovery strategies Cefas: Laurence Kell & John Pinnegar Univ. Aberdeen: Tara Marshall & Bruce McAdam.
Applications of Bayesian sensitivity and uncertainty analysis to the statistical analysis of computer simulators for carbon dynamics Marc Kennedy Clive.
Advancements in Simulating Land Hydrologic Processes for Land Surface Modeling (LSM) Hua Su Presentation for Physical Climatology.
Prof. Jan Rotmans Pieter Valkering Prof. Anne van der Veen Jörg Krywkow De Maaswerken In collaboration with The case study of the Maaswerken A negotiation.
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
CJT 765: Structural Equation Modeling Class 7: fitting a model, fit indices, comparingmodels, statistical power.
TRADING SPACE FOR TIME IN BAYESIAN FRAMEWORK Nataliya Bulygina 1, Susana L. Almeida 1, Thorsten Wagener 2, Wouter Buytaert 1, Neil McIntyre 1 1 Department.
1 Enviromatics Environmental simulation models Environmental simulation models Вонр. проф. д-р Александар Маркоски Технички факултет – Битола 2008.
Assessing the impacts of climate change on Atbara flows using bias-corrected GCM scenarios SIGMED and MEDFRIEND International Scientific Workshop Relations.
Conceptual Modelling and Hypothesis Formation Research Methods CPE 401 / 6002 / 6003 Professor Will Zimmerman.
CS 782 – Machine Learning Lecture 4 Linear Models for Classification  Probabilistic generative models  Probabilistic discriminative models.
Evaluating hydrological model structure using tracer data within a multi-model framework Hilary McMillan 1, Doerthe Tetzlaff 2, Martyn Clark 3, Chris Soulsby.
Center for Radiative Shock Hydrodynamics Fall 2011 Review Assessment of predictive capability Derek Bingham 1.
Experiences in assessing deposition model uncertainty and the consequences for policy application Rognvald I Smith Centre for Ecology and Hydrology, Edinburgh.
Statistical Decision Theory Bayes’ theorem: For discrete events For probability density functions.
The influence of Runoff on Recharge
IMPACT 5 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty UniBwM Breach Modelling Dr.-Ing. Karl Broich.
6. Population Codes Presented by Rhee, Je-Keun © 2008, SNU Biointelligence Lab,
Why use landscape models?  Models allow us to generate and test hypotheses on systems Collect data, construct model based on assumptions, observe behavior.
The Unscented Particle Filter 2000/09/29 이 시은. Introduction Filtering –estimate the states(parameters or hidden variable) as a set of observations becomes.
Modelling of the 2005 flood event in Carlisle and probabilistic flood risk estimation at confluences Jeff Neal 1, Paul Bates 1, Caroline Keef 2, Keith.
Environmental Remote Sensing GEOG 2021 Lecture 6 Mathematical Modelling in Geography I.
Goal of Stochastic Hydrology Develop analytical tools to systematically deal with uncertainty and spatial variability in hydrologic systems Examples of.
Exposure Prediction and Measurement Error in Air Pollution and Health Studies Lianne Sheppard Adam A. Szpiro, Sun-Young Kim University of Washington CMAS.
1 Life Cycle Assessment A product-oriented method for sustainability analysis UNEP LCA Training Kit Module k – Uncertainty in LCA.
Methods of multivariate analysis Ing. Jozef Palkovič, PhD.
National scale hydrological modelling for the UK
QMT 3033 ECONOMETRICS QMT 3033 ECONOMETRIC.
Chapter 7. Classification and Prediction
Change in Flood Risk across Canada under Changing Climate
The Calibration Process
Chapter 6 Calibration and Application Process
Better Characterizing Uncertainty in Geologic Paleoflood Analyses
Where did we stop? The Bayes decision rule guarantees an optimal classification… … But it requires the knowledge of P(ci|x) (or p(x|ci) and P(ci)) We.
Environmental Statistics
Ch 3. Linear Models for Regression (2/2) Pattern Recognition and Machine Learning, C. M. Bishop, Previously summarized by Yung-Kyun Noh Updated.
Chapter 9 Dummy Variables Undergraduated Econometrics Page 1
Hydrology and Meteorology: A Symbiotic Relationship
Presentation transcript:

Keith Beven Lancaster University, UK Assessment of uncertainty of environmental models based on the equifinality thesis Keith Beven Lancaster University, UK

A Manifesto for the Equifinality Thesis One aim of environmental models is to achieve a single true description of governing processes (reality) - especially for predicting impacts of change Difficult to achieve in applications to places that are unique in their characteristics and where (nonlinear) predictions are subject to input, observation, and model structural errors There may instead be many descriptions that are compatible with current understanding and available observations The concept of the single description may remain a philosophical axiom or theoretical aim but is impossible to achieve in practice So we must accept that there may be many feasible descriptions, or a concept of equifinality, as the basis for a new approach

A Manifesto for the Equifinality Thesis So what if we accept multiple possible models and parameter sets…… <M(θ)1, M(θ)2, … M(θ)N > ??? There is no optimum model - can only assess the likelihood of a model being acceptable Different acceptable models will produce different predictions - especially of impacts of future change Should therefore assess the resulting uncertainty in predictions Should be prepared to revise predictions as new data become available Models should be rejected if shown to be non-behavioural (hypothesis testing by model rejection?)

Equifinality: an empirical result Fitting van Genuchten parameters in modelling recharge after Binley and Beven, Groundwater, 2002

Equifinality: an empirical result Fitting parameters of the MAGIC geochemistry model after Page et al., Water, Soil and Air Pollution, 2003

Equifinality: an empirical result Fitting parameters of the Penman-Monteith equation in predicting patch scale latent and sensible heat fluxes after Schulz and Beven, Hydrological Processes, 2003

Uncertainty is not only Statistics Classical approach to uncertainty of treating total model error in linear (or log linear) form O(X, t) = Ô{M(θ,β)} + ε(X,t) Implicit assumption that the model is correct (or can be made to be correct through another additive term) and that any error in the inputs and other boundary conditions cascades through the model linearly Full power of linear statistics can then be used to estimate L[O(X,t)|θ] and posterior distribution of parameters, θ

Uncertainty is not only Statistics But environmental models are generally nonlinear, are subject to important uncertainties in input and boundary conditions and (we suspect) suffer from model structural error More interested in L[M(θ)|O(X,t)] Additive total error may be difficult to justify but may be an approximation that will often be useful BUT…… from the single total error series we cannot easily deconstruct the sources of uncertainty in the modelling process

Sources of subjectivity in assessing model error We like to think that we are objective and scientific in modelling but this is not entirely the case. There are always choices to be made... Choice of models to be considered (including processes to be included, closure and boundary conditions), Choice of ranges (prior distributions) of parameter values to be considered Choice of input data (and input data errors) with which to drive the model (including future scenarios for prediction) Choice of error model, performance measure(s) or allowable error to be considered acceptable (taking account of scale, heterogeneity and incommensurability effects)

Equifinality and the Modelling Process Take a (thoughtful) sample of all possible models (structures + parameter sets) Evaluate those models in terms of both understanding and observations in a particular application Reject those models that are non-behavioural (but note that there may be a scale problem in comparing model predictions and observations) Devise testable hypotheses to allow further models to be rejected [If all models rejected, revise model structures……] This is the essence of the GLUE methodology (Bayesian priors and likelihood functions based on additive error as special case where strong assumptions justified)

Published Applications of GLUE Rainfall-runoff modelling Stochastic rainfall models Radar Rainfall calibration Modelling catchment geochemistry Modelling flood frequency and flood inundation Modelling river dispersion Modelling soil erosion Modelling land surface to atmosphere fluxes Modelling atmospheric deposition and critical loads Modelling groundwater capture zones Modelling groundwater recharge Modelling water stress cavitation and tree death Modelling forest fires

Generalised Likelihood Uncertainty Estimation (GLUE) Note 1: it is the parameter set in combination with the given input and boundary condition data that gives a behavioural model - complex parameter interactions may mean that marginal distributions and global covariances have little relevance Note 2: implicit treatment of complex errors in likelihood weighting of simulations (effectively assuming that prediction errors for any behavioural model in prediction will be “similar” to conditioning periods) Note 3: prediction limits are conditional on choices Note 4: depends on having sufficient sample to find upper limit of performance

Deconstructing total model error Extended GLUE methodology insist on model providing predictions within range of “effective observation error” of evaluation variables effective observation error constructed to take account of scale dependencies and incommensurability (may be dependent on model implementation) models providing predictions outside range are rejected as non-behavioural (multiple models can be included in same formalism but possible that all models may be rejected) success may depend on allowing realisations of error in input and boundary condition data

Incorporating Observational Errors into GLUE Initial condition errors generally poorly known and are difficult to assess (no means of direct measurement) but effect will die out as simulation proceeds (eventually) Input and boundary condition data errors generally poorly known because of measurement technique limitations and will be processed nonlinearly through the model Model structural error is ubiquitous and difficult to assess - claims to physical realism do not exclude possibility of structural error but want models that are consistent with effective observational error Effective observational error may be difficult to assess because of scale, heterogeneity and incommensurability effects - but provides a critical limit for model rejection

Predictive distribution over all behavioural models: (A) predictions encompass new observation

Predictive distribution over all behavioural models: (B) predictions do not encompass new observation ………But models are still behavioural (or can be rejected on basis of new observations)

Bukmoongol Catchment – Location

Bukmoongol – Stage/Discharge Errors Concrete Weir has three sharp-crested rectangle sections – 2 only active at peak discharges +/- 20%

Rainfall Magnitude Errors Event 1 Event 2 Event 3

Results – Model Structural Error? Recession Error IC errors Log(Discharge) Timing Errors And under prediction Standard Z Value (Scaled PM2)

Future prospects A possible way forward – To think about moving from evaluations that are based on ‘lumped’ additive error terms to a framework that considers error source terms individually Generic technique, simple to implement in an uncertainty framework (GLUE) and based on explicit assumptions– even if assumptions may be imprecise (e.g. “effective measurement error”) Allows for equifinality of model structures, input realisations and parameter sets in producing behavioural models - interaction of input errors and model structure may be important Allows for evaluation of model structures by rejection (hypothesis testing) (see philosophy paper, Proc. Roy. Soc., 2002)

Future prospects: model structural error But what if these tests reveal that all models tried are non- behavioural and should be rejected? ?? Ensure that model space has been searched adequately ?? Relax rejection criteria ?? Add a model inadequacy term to compensate for structural error - but will be time variable and will have additional parameters for each model realisation, and how much correction should be allowed? ?? Find a better model - uncertainty estimation should NOT remove the need for creative and constructive modelling

and if you might possibly still want to read more…... Beven, K J, 2000, Uniqueness of place and process representations in hydrological modelling, Hydrology and Earth System Sciences, 4(2), 203-213. Beven, K. J., 2002, Towards an alternative blueprint for a physically-based digitally simulated hydrologic response modelling system, Hydrol. Process., 16(2), 189-206 Beven, K. J., 2002, Towards a coherent philosophy for environmental modelling, Proc. Roy. Soc. Lond., A458, 2465-2484 (comment by Philippe Baveye and reply still to appear) Beven, K J and Young, P C, 2003, Comment on Bayesian Recursive Parameter Estimation for Hydrologic Models by M Thiemann et al. Water Resources Research, 39(5), doi: 10.1029/2001WR001183 www.es.lancs.ac.uk/hfdg/glue.html