T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Fluidised Powder Rig Development Work by: Ottone Caretta, Peter Loveridge and Chris Denham (RAL) Tom Davies (Exeter University) Richard Woods (Gericke.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Fluidised Powder Rig Developments Work by: Chris Densham, Peter Loveridge & Ottone Caretta (RAL) Tom Davies (Exeter University) Richard Woods (Gericke.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK November-2008.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
Fluidised powder as a new target technology: COMMISSIONING OF A NEW RIG Work by Chris Densham, Peter Loveridge & Ottone Caretta (RAL), Tom Davies (Exeter.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
T2K Target & Secondary Beamline - progress towards a neutrino Superbeam? Chris Densham.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta Chris Densham STFC Rutherford Appleton Laboratory, UK 1 st joint meeting of EUROnu WP2 (Superbeam)
The JPARC Neutrino Target
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7.
The Development of Fluidised Powder Target Technology for a Neutrino Factory or Muon Collider Ottone Caretta, Chris Densham, Peter Loveridge Rutherford.
Packed Bed Target for Euronu DAVENNE, Tristan (RAL) ; LOVERIDGE, Peter (RAL) ; CARETTA, Ottone (RAL) ; DENSHAM, Chris (RAL) ; ZITO, Marco (CEA Saclay)
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Proton Accelerators for Science and Innovation Workshop at Fermilab
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Summary Why consider a packed bed as a high power target?
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Future upgrade of the neutrino beam-line for multi-MW beam 5 th Hyper-Kamiokande open Vancouver July Yuichi Oyama (KEK) (for T2K neutrino.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
HK Secondary Beam Issues Chris Densham STFC Rutherford Appleton Laboratory.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Powder jet targets for Neutrino Facilities Ottone Caretta, Tristan Davenne, Chris Densham (Rutherford Appleton Laboratory), Richard Woods (Gericke Ltd),
COMET Target Design (COherent Muon to Electron Transition) Satoshi MIHARA.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Tungsten Powder Jet Update Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7 November-2008.
Megawatt targets for Neutrino Super-Beams (Apr. 4, 2013) RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
BENE/CARE Frascati November 2006 CJ Densham CCLRC Rutherford Appleton Laboratory Solid target studies in UK for T2K and for a neutrino factory JRJ.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
ESSnuSB Target Chris Densham, Tristan Davenne STFC Rutherford Appleton Laboratory 26 th May 2014.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
UK contribution to LBNF/DUNE beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew Atherton,
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
The Development of Fluidised Powder Target Technology for a Neutrino Factory, Muon Collider or Superbeam Chris Densham Ottone Caretta, Peter Loveridge.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Chris Densham Figures of Merit for target design for neutrons, neutrinos… Chris Densham Rutherford Appleton Laboratory.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Target work plan for LBNO study Chris Densham STFC Rutherford Appleton Laboratory.
Irradiated T2K Ti alloy materials test plans
Skeleton contributions to targets section
Tungsten Powder Test at HiRadMat Scientific Motivation
Peter Loveridge High Power Targets Group
Beam Window Studies for Superbeams
WP2 (SuperBeam) Targets Status of Work Programme
EUROnu Beam Window Studies Stress and Cooling Analysis
Superbeam Horn-Target Integration
Work by Chris Densham, Peter Loveridge & Ottone Caretta (RAL),
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark

Chris Densham UKNF Oxford 16 Sept 2008 Is T2K Target work relevant for a Neutrino Factory? Ken Long said (yesterday) of the UK Neutrino Factory effort: ”[we] need to exploit…partnership with T2K to enhance targetry work “ So – here is what I did in Japan (instead of) summer holidays…

Chris Densham UKNF Oxford 16 Sept 2008 T2K Secondary Beam Line DV TS BD Hadron Absorber (Beam Dump) graphite core in helium vessel Target station (TS) Target & horns in helium vessel Helium vessel and iron shields cooled by water Decay Volume (DV) 94m long helium vessel cooled by water 6m thick concrete shield ‘280 m’ neutrino detector 50 GeV PS ring Primary beam line Fast extraction Kamioka

Chris Densham UKNF Oxford 16 Sept 2008 UK/RAL responsibilities on T2K Beamline Beam window Baffle Target Target support & remote handling 0.75 MW operation “ Beam dump3-4 MW operation

Chris Densham UKNF Oxford 16 Sept Beam Aluminum cast cooling modules Graphite Blocks 4,690 Beam Dump / Hadron Absorber Displacement (max) = 8.5 mm

Chris Densham UKNF Oxford 16 Sept Hadron Absorber Module All 14 modules assembled Frame production now on progress Overall assembly will be in Sep. Installation will be in Oct. Jan.24’08 Apr.11’08

Chris Densham UKNF Oxford 16 Sept 2008 Target Station

Chris Densham UKNF Oxford 16 Sept 2008 T2K Target area Inner iron shields Inner concrete shields Support structure = Helium vessel (being constructed by Mitsui Ship. Co.) BaffleTarget and 1st horns 2nd horns 3rd horns Beam window

Chris Densham UKNF Oxford 16 Sept 2008 Proton Beam Window + pillow seals

Chris Densham UKNF Oxford 16 Sept 2008 Installation check in TS using dummy window August 08 (Actual window installation October 08)

Chris Densham UKNF Oxford 16 Sept 2008 Baffle / Collimator – to be installed Oct 08

Chris Densham UKNF Oxford 16 Sept 2008 T2K Target basic requirements Phase I Beam power: 0.75 MW at GeV –Graphite rod, 900 mm long = 2 interaction lengths –NB Only 3% of Beam Power is dissipated in target as heat c.20 kW –Start-up date: 1 st April 2009 Phase II (SuperBeam) power: 3-4 MW –A future aspiration (still < 100 kW deposited in target) –The only components currently designed for 3-4 MW operation are the hadron absorber (beam dump) and decay volume

Chris Densham UKNF Oxford 16 Sept 2008 Graphite to titanium diffusion bond Graphite-to-graphite bond Flow turns 180° at downstream window Inlet manifold Outlet manifold Upstream Window Target Design: Helium cooling path

Chris Densham UKNF Oxford 16 Sept 2008 Steady state target temperature 30 GeV, Hz, 750 kW beam Radiation damaged graphite assumed (thermal conductivity 20 [W/m.K] at 1000K- approx 4 times lower than new graphite) Maximum temperature = 736˚C

Chris Densham UKNF Oxford 16 Sept 2008 Pressures (gauge) Pressure drop = bar Helium cooling velocity streamlines Maximum velocity = 398 m/s

Chris Densham UKNF Oxford 16 Sept 2008 Target Integration with 1 st Magnetic Horn – 2 weeks ago!

Chris Densham UKNF Oxford 16 Sept 2008 Target installed within 1 st magnetic horn

Chris Densham UKNF Oxford 16 Sept 2008

Pulsed beam induced thermal stress waves in target graphite Max. Von Mises Stress = 7 MPa - cf graphite strength ~37 MPa – should be OK 8 bunches/spill Bunch length: 58ns (Full width) Bunch spacing: ~600(300) ns Rep. rate: 0.47 Hz Spill width ~5  s

Chris Densham UKNF Oxford 16 Sept 2008 IG 43 graphite 200 MeV proton fluence ~10^21 p/cm2 c. 1 year operation in T2K Radiation Damage in IG43 Graphite - data from Nick Simos, BNL

Chris Densham UKNF Oxford 16 Sept 2008 Target exchange system – under construction

Chris Densham UKNF Oxford 16 Sept 2008

Options for Neutrino Superbeams Static target difficult beyond 1 MW beam power – problems include: –Power dissipation –Thermal stress –Radiation damage –High helium flow rate, large pressure drops or high temperatures Expect to replace target increasingly often as beam power increases Is it possible to combine a moving target with a magnetic horn? New target technology may be necessary Difficult to combine liquid metal with a magnetic horn – how about flowing powder?

Prototype Powder Jet Plant Status Ottone Caretta, Tristan Davenne, Chris Densham, Peter Loveridge (Rutherford Appleton Laboratory), Richard Woods (Gericke Ltd), Tom Davies (Exeter University)

Chris Densham UKNF Oxford 16 Sept 2008 Helium Beam window beam Helium Powder hopper A flowing powder target for a Superbeam or Neutrino Factory? Magnetic horn

Chris Densham UKNF Oxford 16 Sept 2008 A flowing powder target for a Superbeam or Neutrino Factory? Flowing powder can either be an open jet (a la Merit) or contained within a pipe T2K upgrade? Suitable materials – bulk density c.f. graphite, e.g. TiO 2. Neutrino factory - tungsten powder? First experiments conducted with open jet of tungsten as most difficult case – lower density materials should be easier!

Chris Densham UKNF Oxford 16 Sept 2008 The prototype powder jet rig

Chris Densham UKNF Oxford 16 Sept 2008 =3/10ba r =~atm water supply contains powder Powder jet plant – functional layout

Chris Densham UKNF Oxford 16 Sept 2008 Powder jet plant status Risk Assessment, interlocks and controls functional specification complete October 08: wiring of interlocks and control system (DL controls group) November 08: Start running!

Chris Densham UKNF Oxford 16 Sept 2008 Tungsten powder open jet first results: (Thanks to EPSRC Intrument Loan Pool for use of a high speed video camera ) 2 cm 30 cm

Chris Densham UKNF Oxford 16 Sept 2008 P 0 = 4.9 bar (abs) P 1 = 1 bar (abs) Initial bulk density = 8660 kg/m 3 = 45 % W (by volume) Jet bulk density (approx. results): Jet velocity = 7-15 m/s (100 kg in 8 seconds) ~ 5000 kg/m 3 ~ 28 % W by vol. (~ 2.5 x graphite density) Tungsten powder jet – feasibility test results