Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
7 September 2006VELOEddy Jans 0 VELO-installation September 7, 2006 installation of exit window + part I of the beam pipe logging of vacuum data what’s.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Vibration Sensors for Cooling Towers Challenges Cooling towers offer the vibration analyst many challenges in sensor selection, mounting and environmental.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Muon g-2 Installation Schedule All Experimenters Meeting June 16, 2014 Aria Soha Muon g-2 I&I Manager.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
9.6 Use Trig Ratios to Solve Word Problems
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 July 13, 2011 Some morning photos Tank Valve Box.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
New: TomTom USB car charger Art# 9UUC Charges devices with high power requirements (like PND’s) faster than standard car chargers USB port allows.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
Status VELO alignment 1.Alignment at IP8 Jo van den Brand Frans Mul June 2, 2006.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Status of n_TOF Facility
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules installation.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
FORCE – PUSH OR PULL The unit of measurement for force is the Newton (N)
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Goalie Drills.
VELO-installation meeting CERN, January 17, 2006
BA6 – crab cavity activities in EYETS
VELO Thermal Control System
LHC Experimental Vacuum Systems Status October ‘07
VELO Thermal Control System
Radiation-safe area for electronics, or laser or
Undulator System Installation
VELO Thermal Control System
First Assembled Rod in US
A 6 mm cable with a length of 15 m has been installed
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
VELO RICH 1 INSTALLATION PLATFORM BALCONY BALCONY
Қош келдіңіздер!.
Window cover.
Информатика пән мұғалімі : Аитова Карима.
Polarized 3He target installation
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps Frans Mul 31 May 2006

Drilling holes for the LV - boxes Drilling holes for the service platform Preparing skates Preparing IP 8 Preparing the false floor Frans Mul 31 May 2006

Velo arrived at IP 8 In the air On the road Frans Mul 31 May 2006

All pictures 19, 2006, 3:25:56 PM/ Pushing the last meters Velo at IP8 Frans Mul 31 May 2006

Preparing UXA C3 Luc, Piet and Jaap started May 29 th cabling the racks. Frans Mul 31 May 2006

On the corner Installation transfer lines for the cooling system at IP8 Frans Mul 31 May 2006

Next steps: Velo Alignment at IP8 Installation Velo vacuum system Cabling at IP 8 Installation service platform Velo overall test before installation exit window! Frans Mul 31 May 2006