GDE WG-1 Sendai Mar 3-6 1 Evaluating Cost Reduction Ideas Tom Himel.

Slides:



Advertisements
Similar presentations
MANAGERIAL ACCOUNTING
Advertisements

Capital Budgeting & Investment Analysis Decisions on acquisition of property, plant & equipment are called capital budgeting decisions. They differ from.
Capital Budgeting Last Update Copyright Kenneth M. Chipps Ph.D
Chapter 2: Saving This chapter emphasizes the importance of saving and explains the three reasons to save: emergencies, large purchases, and wealth building.
Using iSIKHNAS for Budget Advocacy 3.5 Cost-benefit analysis.
VIRTUAL BUSINESS RETAILING Lesson 5 Financing. MAIN IDEA  Many people want to own their own business  Before opening a business, there are several steps.
Accounts, Accountants and Accruals Understanding : Accrual Accounting Matching Concept Assets vs Expenses Balance Sheet Income Statement Profit = Performance.
Example 7.4 Selecting the Best Marketing Strategy at the Acme Company
BUDGETS!. WHAT IS A BUDGET ANYWAY?  A budget is a record of our planned income and our planned expenditure.  It is a good way to see if we will have.
1 Capital investment appraisal. 2 Introduction As investments involve large resources, wrong investment decisions are very expensive to correct Managers.
Market-Risk Measurement
Copyright © 2007 Prentice-Hall. All rights reserved 1 Special Business Decisions and Capital Budgeting Chapter 25.
Next page CAPITAL BUDGETING Infrastructure & Project Evaluation Making decisions having significant future net benefits or costs.
McGraw-Hill/Irwin1 © The McGraw-Hill Companies, Inc., Cost-Volume- Profit Analysis Chapter 22.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Review.
British Columbia Institute of Technology
FDM9 Capital investment appraisal 1 Capital investment appraisal 1.
Chapter 6 Measuring the price level
Customer Lifetime Value (CLV)
Partial Budgeting AAE 320 Paul D. Mitchell. Goal 1.Explain purpose of partial budgets 2.Illustrate their structure and use 3.Give some examples.
Cost-Volume-Profit Analysis © 2012 Pearson Prentice Hall. All rights reserved.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
EDEXCEL BUSINESS for GCSE © 2009 Ian Marcousé and Naomi Birchall Section 3 Putting a business idea into practice.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Chapter 9 The Cost of Capital.
Essentials of Investment Analysis and Portfolio Management by Frank K. Reilly & Keith C. Brown.
Investing Money. What does it mean to invest money?  Investing means putting your money where it can make more money by earning higher rates of return.
David Finley / LArTPC Group Meeting / June 13, Fermilab Slide 1 LArTPC Detector Costs Context History Next (perhaps) steps.
D. Numerical Example Suppose Jean purchases 2 goods: Toilet Paper and conditioner. Let X = rolls of toilet paper purchased Let Y = bottles of conditioner.
1 Relevant Cash Flows and Other Topics in Capital Budgeting Timothy R. Mayes, Ph.D. FIN 3300: Chapter 10.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Ch4 Describing Relationships Between Variables. Pressure.
BUDGETING Reference – Mgmt Accounting –Reddy and Sharma.
Simple Economics. Do you like to earn money, save money or spend money? If you said that you like spending money, then you are contributing to our country’s.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
Lecture 7 and 8 Rules of Capital Budgeting Corporate Finance FINA 4332 Ronald F. Singer Fall, 2010.
Production Planning and Control. A correlation is a relationship between two variables. The data can be represented by the ordered pairs (x, y) where.
Ch4 Describing Relationships Between Variables. Section 4.1: Fitting a Line by Least Squares Often we want to fit a straight line to data. For example.
1 §3.1 Implicit Differentiation The student will learn about implicit differentiation.
© Family Economics & Financial Education – May 2005 – Spending Plan Unit – Developing a Spending Plan Funded by a grant from Take Charge America, Inc.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Personal and Financial Planning Chapter 1. Section 1.1 Objectives  Section 1.1 Define personal financial planning Name the six steps of financial planning.
Ch 9-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Copyright © 2012 Pearson Education. All rights reserved © 2010 Pearson Education Copyright © 2012 Pearson Education. All rights reserved. Chapter.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Why Pass Exams?  Much more important to employers than GPA (within reason) Big advantage for internships Nearly required for full-time work  Best thing.
1 Chapter 5 – The Time Value of MoneyCopyright 2008 John Wiley & Sons MT 480 Unit 2 CHAPTER 5 The Time Value of Money.
DWU #1 – 2/5 “Economics is the study of how individuals use money to consume, create, and distribute goods. “ -Explain how the choices we make in our daily.
Study of alternative ILC final focus optical configurations Dou Wang (IHEP), Yiwei Wang (IHEP), Philip Bambade (LAL), Jie Gao (IHEP) International Workshop.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Consumer Behavior.  Common Sense ◦ High Price discourages customers from buying ◦ Low Price encourages customers to buy  Consumer Behavior is reflected.
FINANCE FUNCTION PROCUREMENT OF FUND DEPLOYMENT OF FUND DEBTEQUITYLONG TERMSHORT TERM CAPITAL BUDGETING WORKING CAPITAL MGT.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Measuring and Increasing Profit. Unit 1 Reminder – What is Profit? Profit is the reward or return for taking risks & making investments.
RESEARCH METHODS Lecture 32. The parts of the table 1. Give each table a number. 2. Give each table a title. 3. Label the row and column variables, and.
Chapter 3: Cost Estimation Techniques
BUDGETING PROCESS How will you spend your money?
Availsim runs and questions
Partial Budgeting AAE 320 Paul D. Mitchell.
Keystone Review 1 About the test..
ACT 5060 – Accounting for Decision Makers
Accounts Receivable and Inventory Management
Where did we stop? The Bayes decision rule guarantees an optimal classification… … But it requires the knowledge of P(ci|x) (or p(x|ci) and P(ci)) We.
BUDGETING PROCESS How will you spend your money?
Commissioning, Operations, and Reliability Status
Power Consideration of CEPC
Partial Budgeting AAE 320 Paul D. Mitchell.
Presentation transcript:

GDE WG-1 Sendai Mar Evaluating Cost Reduction Ideas Tom Himel

GDE WG-1 Sendai Mar Why is this a problem? If a proposed change decreases the construction cost and has no other effect, it is simple. Accept the change. What if it introduces a risk? What if it just defers an expense to a later operating or improvement budget? What if it increases operating costs? What if it decreases the luminosity? What if it decreases the availability? What if it decreases the energy? These all have different units. How do we compare apples and oranges?

GDE WG-1 Sendai Mar Process Give idealized linear formula Examine each term trying to determine the correct value for the conversion constant Learn that this is difficult and they have large errors Learn that some effects are non-linear Still useful because we might converge on conversion constants later and it tells us what needs to be evaluated for each proposed change. Also gives a way to understand why people disagree with each other. Evaluation is simpler if we keep the requirements fixed. This forces us to look at derivatives and optimize by making one thing cheaper and worse while making another thing more expensive and better giving a net cheaper with no change in spec.

GDE WG-1 Sendai Mar The Idealized Linear Formula = - P w C c + (1 - P w )C x + K RD C RD + K ops C ops1 + K ops N year C opsN - K lum ΔL P L + K Engy ΔE Where = The expected (average) value of the cost change. Negative is a saving. All K’s are conversion constants, the same for all proposed changes Other symbols are different for each change

GDE WG-1 Sendai Mar P w C c + (1 - P w )C x P w is the probability the change works C C is the reduction in construction cost if the idea works. C X is the increase in construction cost if the idea does not work. –C X = 0 if one can just go back to the original plan. –Expediting to make up for a schedule delay or cost of partially implementing the change and then backing out can make C X > 0 Can be multiple terms like these corresponding to different times the decision is made to back out.

GDE WG-1 Sendai Mar K RD C RD C RD is the cost of doing the R&D and engineering for the change. For many changes, this is negligible compared to C C and can be ignored K RD converts R&D dollars to construction dollars. –It my be easier to get R&D money than construction money. –Probably region dependent –My guess is K RD = 0.5 within a factor of 2

GDE WG-1 Sendai Mar K ops C ops1 This term handles the deferred purchase of some nonessential item like the last few klystrons or some diagnostics. C ops1 is the onetime increase in operating or upgrade cost to compensate for what was left undone during construction. K ops converts operating or upgrade dollars to construction dollars. –Similar to K RD –It my be easier to get Ops money than construction money. –Probably region dependent –My guess is K ops = 0.5 within a factor of 2 After the project is funded and has a fixed budget, K ops gets much bigger

GDE WG-1 Sendai Mar K ops N year C opsN This term handles the extra operating costs caused by a construction cost reduction, for example using thinner wire in magnet or AC power distribution will decrease construction costs but increase the operations power bill. C opsN is the annual increase in operating cost due to the change. N year is the number of years of operating to count The cost engineers specified 10 years for RDR optimizations, but omitted the K ops factor. My guess is N year =10 within a factor of 2

GDE WG-1 Sendai Mar Now the going gets tough It is time to ask how much money would have to be saved to make it worthwhile to halve the average luminosity or reduce the CM energy by 100 GeV. Main (selfish) reason to accept such scope reductions is to increase the probability the ILC gets funded. I think everyone would agree that if we could cut the construction cost by 5 B ILCU by reducing the design luminosity a factor of 2 that we should do it and that if it would only reduce the construction cost by 50 M ILCU we should not. –Can we reduce that factor of 100 estimating uncertainty?

GDE WG-1 Sendai Mar K lum ΔL P L ΔL = log2(factor change in luminosity). E.g. if the luminosity would go down a factor of 2 then ΔL = -1 K lum converts ΔL to construction cost. P L is the probability the luminosity will decrease by ΔL

GDE WG-1 Sendai Mar K lum :How much is a factor of 2 in Luminosity Worth? Clearly K lum < 6.7 BILCU or it would be worth building 2 ILC’s One could say that if we halve L we would run ILC for 20 years instead of 10 and –Count the total cost of running the lab for 10 years or K lum = 10*300M = 3 BILCU –Count the marginal cost of running the lab (mainly electricity) for 10 years or K lum = 10 years * (number of hours in a 9 month run) * (Power consumption in MW) * (electricity price per MWhr) = 10*6579*180*110 or K lum ~ $1.3 BILCU. –These do not account for the lost time to get results and the impatience of physicists. PEP-II spent about $12M to double L for an accel that cost about $200M to build: 6% of the construction cost. 6% of the ILC cost gives K lum = 0.42 BILCU I’d say K lum = 1.3 BILCU within a factor of 2

GDE WG-1 Sendai Mar What about Availability? WWS did not give us an explicit spec. for availability. We can either make up a reasonable one or use the WWS integrated availability spec and intL(avail) = f(avail)*intL(100) f(avail) is nonlinear because operations becomes very inefficient at low avail

GDE WG-1 Sendai Mar K Engy ΔE ΔE is the CM energy reduction in GeV K Engy converts ΔE to construction dollars This one is even more fuzzy than the previous and probably is quite nonlinear. There is a threshold energy below which people consider the accel to be nearly worthless.

GDE WG-1 Sendai Mar Nonlinear effects

GDE WG-1 Sendai Mar Summary Evaluation is simpler if we keep the requirements fixed. This forces us to look at derivatives and optimize by making one thing cheaper and worse while making another thing more expensive and better giving a net cheaper with no change in spec. Derivatives can later be used to decide on reduction of specs. Optimization depends on virtually unknowable nonlinear group psychological functions.