“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-

Slides:



Advertisements
Similar presentations
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Advertisements

PhotoVoltaic System Sizing © ARJ This is not a How-To presentation. It is a What and Why presentation.
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
Save Energy and Money PNM Energy Efficiency Programs
Step Up Payback Proposal Program “How-To” 9/4/07.
Refrigeration Energy Solutions February 24, 2010.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Financing Your Weatherization Projects The Institute for Energy & Sustainability Weatherization Roundtable September 13, 2010 Sam Nutter N.E. Business.
Energy Calculations Dr. Sam C M Hui
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Ch Electricity IV. Measuring Electricity (p )  Electrical Power  Electrical Energy.
 Budget: $210,000  Energy : 255,700 kWh  Demand reduction: 36 kW  Cost Savings: $34,520 / year  Utility Incentive $61,370  Simple Payback = 4.2.
Rachel Weaver Program Manager Maryland Energy Administration
Genesis Solar Module Brochure ™
Overview of 2014 Colorado Custom Rebate Program. Trade Relation Managers Derek Shockley
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
BODHPS PROTOTYPE B Testing and Documentation of improved prototype with a record of power output.
Jen Muir JKMuir, LLC Leo H. LeBoeuf CL&P
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
1 Military Base Standard Offer Program El Paso Electric.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Senior Design I: Preliminary Design Review RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES J. Smith, J. Doe, T. Smith and M. Smith Advisor(s): J. Jones,
Senior Design I: Preliminary Design Review RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES J. Smith, J. Doe, T. Smith and M. Smith Advisor(s): J. Jones,
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Lucie Huang | May 20, 2014 Custom Projects. 2 2 Any Energy Savings Capital Measure that is not covered by Standard Spreadsheets, AND is a proven technology.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
Best Practices Software: Decision Tools for Industry Michaela Martin ORNL.
Residential and Small Commercial/Industrial Standard Offer Program Billy G. Berny American Electric Power 13th Symposium on Improving Building Systems.
Wisconsin’s Focus on Energy - Program Update John Nicol, PE Industrial Program Manager.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
Calculating Energy Use and Converting Units Chapter 2.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
CITY OF LEOMINSTER. Customer Charge The cost of providing customer related service such as metering, meter reading and billing. These fixed costs are.
Kaeser Compressors, Inc.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Fort Stanwix National Monument Energy Audit Contract
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Seminar On Energy Audit Submitted To: Submitted By:
NEEA Products Council Meeting Air Saving Unit Investigation
Kaeser Compressors, Inc.
Energy Efficient Solutions for The Inn at Otter Crest
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
Solar City: Effect of Solar Technologies on Network Performance
IV. Measuring Electricity
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
NEEA Products Council Meeting Air Saving Unit Investigation
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES
Promotion of Energy Audits in Small and Medium Sized Enterprises
Fleet Electrification
Small Business Considerations Outside of Lighting
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom- -May require a study

Custom Measure Application Process 1.Require documentation of the proposed cost, projected electricity savings. 2.MUST determine eligibility of the proposed project and to establish requirement for detailed savings projections and cost estimates. 3. Submit to Tech Rep for Review. 4. The Technical Rep will develop a Minimum Requirements Document (MRD) which describes the minimum equipment specifications and operational requirements of the proposed system. The Customer will be required to sign this document. 5. After successful review and project approval, the Energy Solutions representative will notify customer in writing of the project approval, the incentive amount and the terms and conditions required to receive final incentive payment. 6. The following is a guide to the level of technical information and documentation that is typically required.

Project Description General description of facility, it’s use and typical operation (include occupancy schedules) Overall project description including operating schedules and parameters Existing Materials and Equipment Detailed description of equipment and operations Cuts sheets with equipment performance ratings (BHP, CFM, kW, etc.) (Provide nameplate data if cut sheets are unavailable) Part load performance data where applicable Description of controls and sequence of operations Proposed Materials and Equipment Detailed description of equipment and operations Cuts sheets for the materials or performance ratings for equipment being installed (BHP, CFM, PSI, Efficiency rating, U-value,Lumens, etc) Description of controls and sequence of operations

Load Profile-DELIVERABLE Equipment hours of operation (operating schedule per day, week, year) Provide operating load profiles showing how equipment load and operating parameters vary over time due to changes in: occupancy, weather, production, etc.. Where there are existing systems involved, metering kW and kWh of major equipment loads is recommended. If metered information is not available, provide other documentation used to estimate loads and operating hours.

Savings Calculations- this is a DELIVERABLE -Communicate with Tech Rep to avoid extraneous diligence or lack thereof. -Show calculations used to determine electricity savings including: - Existing (kWh)-Proposed (kWh)= kWh Savings -shall be Calculated to show average $/kWh saved. - Document customer’s actual billed kW savings if different from equipment kW savings - The calculations should clearly show all the details of how the energy savings were estimated. This includes all engineering formulas and documentation of all the factors, values and assumptions used in the formulas - Spreadsheets (Excel preferred) must be submitted showing all energy and demand savings calculations - In cases where energy modeling is used to determine savings, approved modeling software must be used. Input and output data from the model must be provided..

Handy Measurement Tool – Mass Flow meter

Thank you to our Presenters Michael Bakalyar- Gardner Denver Corp Dale Burgess-Glauber Equipment