Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Operations Scheduling
Chapter 5 Strategic Capacity Planning
SCHEDULING IN THE PHARMACEUTICAL INDUSTRY IEOR 4405 – Production Scheduling Kristinn Magnusson Sigrun Gunnhildardottir.
Topics to be Covered 1. Capacity Planning
OMG Operations Management Spring 1997
Multi-scale Planning and Scheduling Under Uncertain and Varying Demand Conditions in the Pharmaceutical Industry Hierarchically Structured Integrated Multi-scale.
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
INDUSTRIAL & SYSTEMS ENGINEERING
1212 / t 1 A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS Henny P.G. van Ooijen J.Will M. Bertrand.
Bob Devine & Ed Foerster “Simulation & Modeling” Term Project December 7, 1999 Facilities Planning A Simulation Study of a Flow Shop Vs. a Job Shop Manufacturing.
The Production Process
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SCHEDULING A FLEXIBLE MANUFACTURING SYSTEM WITH TOOLING CONSTRAINT: AN ACTUAL CASE STUDY presented by Ağcagül YILMAZ.
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Production Scheduling: What Tool is Right for You?
1 Chapter 7 Dynamic Job Shops Advantages/Disadvantages Planning, Control and Scheduling Open Queuing Network Model.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Planning and Control Introduction
Project Resource Management. 2 Agenda Aims of project resource management Strategic and tactical resource planning Scenario planning and management Availability.
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
Process Strategy The process by which a firm converts inputs into goods and services The purpose is to build a production process that meets customer.
1. Facility size 2. Equipment procurement Long-term
Managing Production and Supply Chains An introduction to the ProSim production management simulation.
Lifecycle Management and the Projects Portfolio. 2 Agenda How project portfolio management fits within an overall lifecycle for managing the delivery.
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization Fall, 2012.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Aggregate Planning This Chapter explores:
Production Scheduling: location of the user in the decision-making architecture Peter G. Higgins.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Intelligent Supply Chain Management Course Transportation Scheduling
Intelligent Supply Chain Management Strategic Supply Chain Management
Background: - Founded in 1924, Lee Industries has evolved from a tin can and heavy duty kitchen equipment manufacturer in to a global leader in process.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
N ATURE OF PLANNING AND CONTROL Chapter 10. P LANNING & CONTROL IN OPERATIONS Planning and control is one of the major responsibilities of operations.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
Material Requirements Planning
AXUG Partner Showcase – Introducing Preactor
Manufacturing Simulation Case Studies
Chapter 7: Manufacturing Processes
Dikos, George, and Stavroula Spyropoulou
Maintenance Scheduling
PRODUCTION ACTIVITY CONTROL (PAC)
The University of Jordan Mechatronics Engineering Department
CHAPTER 8 Operations Scheduling
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
MAINTENANCE PLANNING AND SCHEDULING
Introduction to Materials Management
Chapter 7 Capacity Planning and Management
PRODUCTION ACTIVITY CONTROL (PAC)
Manufacturing Planning and Control
Material Requirements Planning (MRP)
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
Planning and Scheduling in Manufacturing and Services
Incorporating lot sizing into MRP
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Presentation transcript:

Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv

Overview Planning Steps Methods Applied The Contribution of Simulation Examples The Future

Planning Steps Production Programme Planning / Plant or Process Design (time horizon: years) Production Planning (months / weeks) Detailed Scheduling (days / hours) Control

Overall Planning Objectives Maximise Capacity Utilisation Minimise Delays Minimise Throughput Times Minimise Work in Progress Note: Conflicting Objectives!!

Facility Planning Based on assumed demand Searches “optimal” match of needed and available capacity Planning horizon: years Not an ongoing activity

Optimal Match Needed per year: 10,400 h milling ______________ 8,500 h welding … Available per year: 4 machines = 5376 h (1 shift, 80% utilis.); = h (2 shifts) __________________ 4 workers = 8400 h 5 workers = h … ?

Limitations no interdependencies taken into account based on estimated / experienced degrees of capacity utilisation adequate for strategic, long-term planning, when little information is available

Production Planning Based on (expected) customer orders Using fixed throughput times per step (based on experience or assumptions) Accepts / rejects orders and fixes start and end dates

Example: Assumed and Real Durations DepartmentEstimated Throughput Time Process Time Lathing20 days1 hour Machining5 days20 hours Surface Treatm.7 days1.5 hours Polishing7 days10 hours Assembly15 days20 hours Total54 days52.5 hours

Limitations Capacity assumed available Actual shop floor status not taken into account Waiting times included and therefore fixed Applicable only when long delivery times are acceptable

Production Scheduling Planning Horizon: 1 week – 1 day Based on confirmed orders and actually available resources Must take into account technical restrictions Finds exact sequence of operations per work station

Production Scheduling Must be “fit for reality”!

Contribution of Simulation Detailed models Exact representation of all processes, all needed resources Realistic transition times, based on current shop floor status All kinds of rules and constraints can be taken into account

Ways to Use Simulation: MRP /ERP System Simulation Model controls feeds back 1. Offline, from outside

Ways to Use Simulation 2. Online, as part of planning toolbox MRP / ERP System: Long Term Planning Module_____________________ Medium Term Planning Module___________________ Scheduling Module: Simulation Model Shop Floor

Typical “Leitstand” / APS tool

Contribution of Optimisation Can use a large variety of criteria for “optimal” solutions Finds very good schedules quickly Takes away hours of routine work from the planners Allows them to focus on the essentials

Examples 2 Examples: Simulation helps optimise planning tool and process 4 Examples: Simulation and Optimisation modules as part of planning toolbox

Conclusion from Examples: Broad range of industry sectors Leitstand / APS tools can complement existing MRP / ERP tools or run stand-alone Typical benefits include Higher capacity utilisation Less WiP Less delays, shorter throughput times Payback often within a few months!!

Summary Simulation Based Scheduling and Control offers substantial advantages Many approaches available for different special requirements Also useful for SMEs Sim-Serv assists with selection of best suited approach