ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.

Slides:



Advertisements
Similar presentations
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Advertisements

The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Direction de la Technique et de l’Innovation 23 Mars 2006 ASAS implementation the DSNA views ASAS TN 2 Worshop Session 4: Integrating ASAS in an evolving.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
National Aeronautics and Space Administration ADS-B In-Trail Procedures Overview of Research Results Presented to the ASAS TN2 Workshop September 2007.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Final Seminar, Paris, April 2008 ASAS in the SESAR Master Plan Fraser McGibbon (BAE Systems) Andy Barff (EUROCONTROL EEC) ASAS-TN2 Seminar Paris.
Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASSTAR Overview Jean-Marc Loscos, DSNA
Project conclusions and recommendations Thierry Arino (Sofréavia)
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Rome November 2008 Johan Martensson, CASCADE
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL

Outline Objectives Approach Draft results Feedback

Objectives Yearly assessment of ADS-B/ASAS applications progress: –R&D work, validation –Operational standards –Technical standards –Early implementations Recommendations

Scope Assessment performed on Application Clusters: –ADS-B SurveillanceThales ATM –Situation AwarenessThales Avionics –Runway applicationsLFV –SpacingENAV –SeparationBAESYSTEMS –Self-SeparationNLR

Methodology Based on EMERALD approach: –Domains: Safety Operational Concept … –Maturity levels Enhanced to better capture transition to operations

Maturity Levels Industry maturity levelsRTD plan phases 1 - Basic principles identified and reported onUser Requirement/Concept Phase 2 - Technology capability understoodUser Requirement Analysis/Feasibility Phase 3 - Elements / sub-element feasibility demonstrated Functional Requirements/Feasibility Phase 4 - Component feasibility demonstratedASAS Development for Prototyping Phase 5 - Major component capability demonstrated in a representative environment 6 - Integrated component capability demonstrated in a representative environment Experimentation and Validation Phase 7 - Principles ground or flight demonstrated / validated modeling capability in a representative environment 8 - Flown or operated in an operational environment and production capability demonstrated Operational Implementation 9 - Fully qualified capability

EMERALD RTD Domains The Domains are: Operational ConceptsLFV Benefits & ConstraintsBAE Safety AssessmentNLR ASAS Operations and Human Factor IFATCA ASAS Design and Airborne HMITHAV Transition IssuesTATM&ENAV

Projects, activities,… NUP2, NUP2+, MA-AFAS, G2G, MFF, SEAP, SAFEFLIGHT 21, Capstone, C-ATM, ISAWARE II, CASCADE Stream 1&2/Cristals, RFG, Asia Pacific/Australia implementations, CARE/ASAS, INTENT, FALBALA, COSPACE, AATT/DAG-TM, NLR/NASAS Free Flight, FlySAFE, HILAS, EMERTA, EMERALD, ASSTAR,…

Situation Awareness Applications (1/2) Scope: –Enhanced traffic situational awareness during flight operations (ATSA-AIRB) –Traffic situational awareness on the airport surface (ATSA-SURF) –In-trail procedure in oceanic airspace (ATSA-ITP) –Enhanced visual separation on approach (ATSA-VSA) Human Factors: –OSED development within the RFG framework. –simulations with pilots. Level 7 Operational Concept: –RFG Level 7 Benefits Constraints: –Benefits identified for specific procedures –Limited constraints expected Level 5

Situation Awareness Applications (2/2) Safety: –One of the key objective –Not too complex Level 5 HMI & ASAS Design –One mature design available Level 6 Transition Issues: –Partial OK, no mandate Level 6 Critical Path –Airworthiness –ICAO Way Forward –CASCADE Stream 1 & RFG

Spacing Applications (1/2) Scope: –Enhanced sequencing and merging operations (ASPA-S&M) –In-trail procedure in oceanic airspace (ASPA- ITP) –Enhanced crossing and passing operations (ASPA-C&P) Human Factors & ASAS Operations: –Consolidated procedures –Detailed Human Factors Level 5 Operational Concept: –Defined concepts and tested Level 5 Benefits Constraints: –workload reduction, increased capacity demonstrated Level 5

Spacing Applications (2/2) Safety: –Initial OHA/HAZOP Level 3 HMI & ASAS Design –Flight trials & large scale simulations Level 5 Transition Issues: –Capability demonstrated in a representative environment Level 5 Critical Path –Integration within ATM developments –Pre operational trials Way Forward –See above

Separation Applications (1/2) Scope: –Lateral Crossing and Passing (ASEP-LC&P) –Vertical Crossing and Passing (ASEP-VC&P) –In-Trail Follow (ASEP- ITF) –Enhanced Flight Level Change Procedure (ASEP-FLC) Human Factors & ASAS Operations: –Except for ITF, very little work performed Level 1 or 2 Operational Concept: –Concept quite mature: Level 5 Benefits Constraints: –Some limited studies available Level 3

Separation Application (2/2) Safety: –Level 1 HMI & ASAS Design –Some preliminary available: Level 3 Transition Issues: –Level 1 Critical Path –Safety Analysis –Business Cases Way Forward –ASSTAR

Way Forward Feedback Consolidation/harmonization Draft available year end First release at the next workshop Annual updates

Questions?