Technical System Options

Slides:



Advertisements
Similar presentations
IT Service Continuity Management
Advertisements

Software Requirements
Chapter 26 Legacy Systems.
Software Re-engineering
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
The ANSI/SPARC Architecture of a Database Environment
Business System Options
Modern Systems Analyst and as a Project Manager
Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
Configuration management
Software change management
Lecture 3 Planning and Development Methodologies.
Introduction to Databases
Slide 1 Shall Lists. Slide 2 Shall List Statement Categories  Functional Requirements  Non-Functional Requirements.
Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Plus Project Management Concepts.
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation (Adapted) Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
S Y S T E M S E N G I N E E R I N G.
Software Quality Assurance Plan
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Network Design and Implementation
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
Cadle & Yeates Ch 5 Revised by Ivor Perry Sept Detailed Planning - 1.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
1 CP2236 Information Systems Design Business & Technical System Options Required System Logical Data Flow Modelling Larger versions of slides 17,20,23,24.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Software Engineering CSE470: Requirements Analysis 1 Requirements Analysis Defining the WHAT.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Unit 03 – Computer Systems M/601/7261
9 1 Chapter 9 Database Design Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
IMS Information Systems Development Practices
Chapter 1 Introduction to Databases
Software projects Management & Development Alireza Saebi
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Initiating and Planning Systems Development projects
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
Introduction to Systems Development Life Cycle
Feasibility Study.
Computers Are Your Future © 2006 Prentice Hall, Inc.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
OBJECT ORIENTED SYSTEM ANALYSIS AND DESIGN. COURSE OUTLINE The world of the Information Systems Analyst Approaches to System Development The Analyst as.
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
Computers Are Your Future © 2008 Prentice Hall, Inc.
Systems Life Cycle A2 Module Heathcote Ch.38.
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
Module 4: Systems Development Chapter 14: Design And Implementation.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
Systems Development Life Cycle
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
Project management Topic 3 Quality.
Chapter 12 The Network Development Life Cycle
Requirements engineering The process of establishing the services that the customer requires from a system and the constraints under which it operates.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Unit F451 Computer Fundamentals Components of a Computer System Software Data: Its representation, structure and management in information.
MANAGEMENT INFORMATION SYSTEM
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Information Systems Development
IS Development Methodology
Information Systems Development
Initiating systems development
BUSINESS SYSTEM OPTION (Bso)AND TECHNICAL SYSTEM OPTION(TSO)
BSA 376 Competitive Success/snaptutorial.com
BSA 376 Education for Service/snaptutorial.com
BSA 376 Teaching Effectively-- snaptutorial.com
Information Systems Development
CLINICAL INFORMATION SYSTEM
Joint Application Development (JAD)
Presentation transcript:

Technical System Options Specify technical environment Confirm functionality of new system Analyse impact on organisation Provide cost/benefit analyses Provide a stop/go point e.g. Like Feasibility and Business System Options Often the basis for procurement Enables detailed physical design

Technical System Option Components End product of Stage contains following documents: Technical Environment Description (TED) System Description Impact Analysis Outline Development Plan Cost/Benefit Analysis

Technical Environment Description Hardware Hardware TED is generic rather than specific System Diagram showing layout number of terminals or PCs printers communication lines processors other devices Hardware also subject to System TED

Technical Environment Description System Textual descriptions which may cover standards communications environment installation upgrade arrangements reliability serviceability availability maintainability software

Technical Environment Description Software May cover following aspects: data management software system recovery and dumping facilities operating system application packages construction software e.g. Programming languages, testing tools development environment access rights and security system sizing space requirements processing performance first-cut physical design

System Description Shows how option satisfies Requirements Specification Supports major decisions taken in Business System Options Includes alternative systems with trade-offs Shows degree to which system requirements met NB. It is also important to show which functions/facilities will not be provided Includes Required System Logical Data Model Function Definitions Requirements Catalogue (showing solutions based on the option)

Impact Analysis Explains effects on user environment Should cover organisation and staffing changes in user operating procedures implementation considerations such as conversion savings comparative advantages and disadvantages of alternative TSOs Includes issues documented in following products: Training Requirements Description User Manuals Requirements Description Testing Outline Take-on Requirements Description

Outline Development Plan Enables development costs to be estimated Shows next module in detail Shows outline of subsequent plans Should contain time, resource and cost estimates for physical design program design and programming procurement system testing implementation

Cost/Benefit Analysis Most objective way to compare merits of options Cost/Benefit Analysis should cover: development costs operating costs tangible benefits and displaced costs i.e. Current system costs eliminated by new system cost containment Intangible benefits improved product quality improved service to customers greater job satisfaction for employees improved management information

Considerations for TSOs Staff involved External and internal constraints Development of outline Technical System Options Refining Technical System Options Making the selection Documenting the selection

Staff Involved in Technical System Options Project board often assesses TSOs and makes selection may terminate project if no suitable option found Project Manager or Module Manager finalises TSOs finalises and presents TSOs Analysts research and document requirements formulate TSOs for presentation

The Decision Makers Usually project board Special review group including users and IT specialists Standard QA review group Consensus approach selection made by project board based on user views

External Constraints Imposed from outside the project Typical constraints include delivery dates total costs hardware and/or software preferences

Internal Constraints Set within the project by the user Typical constraints include mandatory facilities e.g. On-line access, word processing minimum service levels e.g. Mean time between failures, maximum time to restore system, availability, reliability data storage space requirements critical timing criteria information objectives operating environment conditions security requirements interfaces to other Information Systems

Making the Selection Present TSOs NB. Presentations frequently made to users as well as Project Board Prepare carefully for presentation provide amplification and answer queries record significant comments Often selection chosen is hybrid of options document the selection record reasons for selection Update selected Technical System Option Update associated Technical Environment Description

Further Activities Develop Application Style Guide from Installation Style Guide Service Level Requirements become the basis for Service Level Agreements Physical design will be based on the Technical Environment Description