Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.

Slides:



Advertisements
Similar presentations
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Advertisements

CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Wind and Solar Integration in Colorado: Challenges and Solutions Colorado Rural Energy Agency Energy Innovations Summit Energy Storage for Intermittent.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Resource Adequacy in PJM
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Ensuring Reliable Electricity Supplies Using Distributed Generation Gregory Tress Carnegie Mellon University.
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Environmental Regulation in Oligopoly Markets: A Study of Electricity Restructuring Erin T. Mansur UC Berkeley and UC Energy Institute March 22, 2002 POWER.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Special Report on Renewable Energy Sources and Climate Change Mitigation IPCC WORKING GROUP 3.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
1 Load Forecast and Scenarios David Bailey Customer Energy & Forecasting Manager Soyean Kim Rate Design Manager.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use, reproduction or.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
Avoided Costs of Generation
Demand Response How to make money by not using electricity?
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
The Smart Grid: A Brief Introduction Qinran Hu Ph.D. Candidate Jun 12 th, 2014 Knoxville, Tennessee.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Rich Riazzi Chelan County PUD These are the views of Rich Riazzi and may not be representative of the policies of Chelan County PUD 1.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
An NSF I/UCRC Could there be a new era with much lower utility bills? Tim Mount Dyson School of Applied Economics and Management Cornell University Presented.
Transmission Reliability Program Review Market Monitoring Tools Bernie Lesieutre and Bob Thomas Lawrence Berkeley National Laboratory Cornell University.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Renewables and System Services Ann Scully.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Steady State Analysis Of A Microgrid Connected To A Power System
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
SHP – Columbia University
The Iowa Stored Energy Plant A Project Review and Update May 2005 Bob Haug, Executive Director Iowa Association of Municipal Utilities.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
CALIFORNIA ENERGY COMMISSION Why Peak Demand Offset Measures Are Necessary When There Is “Enough” Energy Lorraine White Advisory to Vice Chair Pfannenstiel.
India’s Energy Security: Role of Renewable Energy Amit Kumar TERI, New Delhi.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
RENEWABLES AND RELIABILITY
Asia-Pacific Energy Regulatory Forum
penetration of wind power
Preserving Competition and Promoting Clean Energy (for All)
Evolution of the ISO Power Markets
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Wholesale Electricity Costs
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity Markets Washington DC, November 9-10, 2009

Page 2 Acknowledgements The research used in this presentation was supported by the US Department of Energy through the Consortium for Electric Reliability Technology Solutions (CERTS) and by the Power Systems Engineering Research Center (PSERC). Researchers at Cornell EngineersEconomists Lindsay AndersonAlberto Lamadrid Hsiao-Dong ChiangSurin Maneevitjit Andrew HunterTim Mount Bob ThomasDick Schuler Lang TongBill Schulze Max Zhang Ray Zimmerman

Page 3 New Goals for Energy Policy OBJECTIVE –Mitigate the effects of climate change –President Obama’s proposed goal is to reduce national emissions of greenhouse gases by 80% by NECESSARY STEPS –Generate electricity from renewable sources of energy and replace fossil fuels like coal –Use electricity for transportation and replace petroleum fuels (  Energy Independence) –Make buildings energy efficient and use ground-source heat pumps for space conditioning with thermal storage –Decentralize energy sources and controls

Page 4 OUTLINE INVESTIGATE THE EFFECTS OF RENEWABLES –Add wind generating capacity to replace coal capacity –Determine the effects on: Annual earnings of conventional units in the wholesale market Missing money needed to maintain their Financial Adequacy CASE STUDY –Use a 30-bus test AC network in a deregulated market –Determine the generating capacity needed to maintain System Adequacy endogenously –Determine the Total Annual System Cost IDEAL COMMUNITY NETWORK

Page 5 30-BUS TEST NETWORK Area 1 - Urban - High Load - High Cost - VOLL = $10,000/MWh Area 3 - Rural - Low Load - Low Cost - VOLL = $5,000/MWh Area 2 - Rural - Low Load - Low Cost - VOLL = $5,000/MWh Wind Farm + 3xWind MW - Coal MW

Page 6 Scenarios Considered Case 1: NO Wind, Initial System Capacity Case 2: NORMAL Wind –105MW of variable wind replaces 35MW of coal in Area 2 in four increments Case 3: NICE Wind –Variability of wind smoothed by storage in Area 2 Case 4: NASTY Wind –Variable wind with a “must-take” contract in Area 2

Annual Payments in the Wholesale Market Page 7 Case 2: NORMAL Wind.0: 0MW of Wind Case 3: NICE Wind.1: 26MW of Wind Case 4: NASTY Wind.2: 52MW of Wind.3: 78MW of Wind.4: 105MW of Wind NORMAL NICE NASTY

PAYMENTS BY CUSTOMERS IN THE WHOLESALE MARKET Congestion Rents = Total Annual Payments by Customers – Total Annual Payments to Generators Total Annual Earnings for Generators = Total Annual Payments – Total Annual Operating Costs (Zero Operating Costs for Wind Generation) GENERAL CONCLUSIONS 1) Conventional Generators are the big losers and Customers are the big winners with NORMAL and NICE Wind 2) Congestion Rents are relatively small and maybe negative 3) Revenues for Wind Generators are relatively small 4) Customers may pay more with NASTY Wind WHAT ARE THE IMPLICATIONS FOR FINANCIAL ADEQUACY?

Page 9 Missing Money for Generating Units  Total Annual System Cost Minimum Earnings = Annualized Capital Cost x MW Committed to meet the Peak System Load (i.e. to maintain System Adequacy) By type of generating unit (e.g. $88,000/MW/year for G1 and G2) Missing Money = Max[(Minimum Earnings – Actual Net Revenue), 0] Capacity Price = Missing Money/ MW Committed for System Adequacy Capacity Markets use the maximum Capacity Price by Region to pay all MW Committed in a Region Area 1 for Gen 1 and Gen 2 Areas 2 and 3 for Gen Total Annual System Cost = Total Annual Wholesale Payments + Total Annual Capacity Payments to Generators and to Transmission Owners

Total Annual System Costs Page 10 Case 2: NORMAL Wind.0: 0MW of Wind Case 3: NICE Wind.1: 26MW of Wind Case 4: NASTY Wind.2: 52MW of Wind.3: 78MW of Wind.4: 105MW of Wind Additional Missing Money for the Conventional Generators offsets most of the savings in the Wholesale Market for NORMAL and NICE Wind Total Annual System Costs increase with NASTY Wind NORMAL NICE NASTY

Need a New Dynamic Rate Structure Page 11 Adding wind generation will result in: Wholesale Energy Prices going DOWN Capacity Prices going UP All customers should pay for both Energy and Capacity Real-time nodal prices for the ENERGY used Correct price for the CAPACITY demanded at the system peak The financial viability of storage technologies and controllable load depends on getting the Capacity Price and Capacity Demanded measured correctly

IDEAL Distribution Networks I Page 12 THE PROBLEM Impractical for many Residential and Commercial customers to pay for both Energy used and Capacity demanded: Difficult to measure Capacity correctly for individual customers Responses to Real-Time Prices for Energy are relatively slow Information overload for many customers  inefficient response A SOLUTION Aggregate the loads of “small” customers and manage them as a single Wholesale customer: Better management of the aggregate load and peak capacity demanded Rapid response using wireless signals/automatic controls Simplifies the operations for Transmission System Operators

IDEAL Distribution Networks II Page 13 Need a new generation of engineer/managers to operate and manage community distribution systems: Manage new Distributed Energy Resources effectively Reduce costs for customers by managing the aggregate peak load Provide new capabilities to support the bulk-power grid Cornell has proposed an Intelligent Dependable Energy with Active Load (IDEAL) campus network: Diverse types of Distributed Energy Resources already exist New facilities for training students will be developed An IDEAL campus network will lead to IDEAL community networks

Capacity Markets I Page 14 Objectives: 1) Ensure Generation Adequacy in the FUTURE 2) Provide the “missing money” for generators 3) Reduce the financial risk for new entrants 4) Prorate costs to Load Serving Entities using actual peak loads Implications: 1) Determines an annual price for capacity 2) Does not determine the correct incentives for loads - seasonal prices for capacity  REDUCE SYSTEM PEAK - hourly prices for capacity  SMOOTH DAILY LOAD PATTERN

Capacity Markets II Page 15 Future Objectives with IDEAL Community Networks: 1) Ensure Generation Adequacy of the BULK POWER GRID 2) Forecast the peak system load for the BULK POWER GRID 3) Reduce the financial risk for new entrants 4) Prorate costs using actual peak loads at the SUBSTATION level 5) DON’T TREAT LOAD RESPONSE AS NEGATIVE CAPACITY Implications: 1) All “customers” on the the Bulk Power Grid will be Wholesale 2) IDEAL Operator/Managers will allocate costs to customers 3) Need SEASONAL CAPACITY PRICES  REDUCE NET PEAK LOAD 4) Need RAMPING MARKETS  SMOOTH DAILY LOAD PATTERNS 5) These issues are important topics for future research

Cornell Combined Heat & Power Project 2 x 15MW Gas turbines Smart substation THANK YOU Questions?