North Utah County Transit Study Co-funded and co-managed by UTA Consultant team led by InterPlan Transportation Planning with assistance from: Cambridge Systematics Connetics Transportation Group HDR Study area includes: Eagle Mountain City Saratoga Springs City Lehi City American Fork City Pleasant Grove City Lindon City Vineyard City Orem City
Three Areas of Focus Examine potential north/south LRT extension from Draper into Utah County Work with UTA to plan circulator bus service from the Thanksgiving Point FrontRunner station Look at east/west transit connections between Eagle Mountain, Saratoga Springs, and Lehi
Schedule Currently: Anticipate completion summer 2014 Developing draft circulation network from FrontRunner stations Quantifying “transit competitiveness” using TCI tool Anticipate completion summer 2014
TCI Tool: Understanding the Market for Travel Origin Conditions Trip volume Land use density Household characteristics O-D Conditions Congestion Trip purposes Travel costs Tolls Destination Conditions Trip volume Land use density and mix Walk distance from parking Parking cost and search time