WP 5 : JI Potential in Eastern Europe TETRIS PROJECT TEAM MEETING Jake Schmidt, International Program Manager Jin Lee, Research Associate ******** 21 June.

Slides:



Advertisements
Similar presentations
Eastern Europe Markets and Opportunities: Why Now?
Advertisements

Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
JCF March, 2006 Issues on and Requests for Joint Implementation ( “JI” ) Projects Institutional Framework on Joint Implementation ( “JI” ) Projects Yusuke.
1 CF Assist Activities in Central and Eastern Europe Helmut Schreiber Annual Meeting of the Host Country Committee on Carbon Finance February 15-16, 2005.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
1 Joint Implementation: A Credit Blueprint for Europe? Dr. Moritz von Unger Roundtable: Domestic Offsets under Article 24a EU ETS Brussels, 1 March 2010.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Progress in the Electricity and Gas Single.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
Sustainable Energy Roundtable Series January, 2005 Pfizer Greenhouse Gas Management Program Experience.
THE NATIONAL CLIMATE CHANGE RESPONSE POLICY Mitigation System National Climate Change Response Policy 26 May 2015.
Camco – climate change and sustainable development company0 Kyoto Gap through to 2012 Source: Point Carbon.
30/10/2006 MARKET BASED MECHANISMS TO FIGHT CLIMATE CHANGE Jean-François Conil-Lacoste Chief Executive Officer, Powernext SA APEX Conference October 30,
Reducing CO2 emissions from cars Jos Dings, Director, T&E Brussels, 11 July 2007.
August 2003 Investor Relations Online and Surveys of Reporting on Corporate Social Responsibility (CSR) in 11 Central and Eastern European (CEE) Countries,
CARBON CREDITS.
Canada’s CDM & JI Office First UNFCCC Workshop on the Implementation of Article 6 Projects Under the Kyoto Protocol May , 2004 Moscow, Russia Jane.
1 LEPII-EPE IDDRI – Emissions trading for GHG mitigation 20/01/04 Trade through the Kyoto Protocol flexibility mechanisms : the impact of qualifying participants.
North American versus European Global Warming Policies: Same Constraints, Different Objectives Ross McKitrick Department of Economics University of Guelph.
State, Trends and Barriers to Carbon Finance in RBEC Marina Olshanskaya Regional Energy/Kyoto Protocol Specialist RBEC Energy and Environment Practice.
The impacts of the UN/ECE protocols on PM emissions in Europe Preliminary results of a study conducted for the PMEG Meeting, Dessau, March 10, 2006 with.
WP 5 : Joint Implementation and Emissions Trading in Eastern Europe Jin Lee, Policy Associate Jake Schmidt, International Team Manager ******** 30 November.
EPA Offsets Experience and Analysis Bill Irving Climate Change Division U.S. Environmental Protection Agency April 28, 2009.
The GAINS model State of play
Status of Joint Implementation and Green Investment Scheme Vlad Trusca Ministry of Environment and Sustainable Development Romania - Annual meeting of.
Relationship between the EU ETS and the Kyoto Protocol Flexible Mechanisms, from the Perspective of Bioenergy and C Sequestration Relationship between.
Economies on Transition: At the Crossroads of Development Olga Gassan-zade Center for Clean Air Policy, Ukraine SB-18, Bonn, June 9.
Interim report of WG 5/6 subgroup: Review of Phase 2 NAPs Mark Johnson 22/02/07.
Green Investment Scheme in Bulgaria Christo Christov, Energy Institute, Bulgaria Workshop Facilitation Green Investment Scheme: first lessons learnt and.
Offsets and Climate Policy: EPA Perspectives Dina Kruger Director, Climate Change Division U.S. Environmental Protection Agency May 30, 2008.
Latest on Bioenergy in the EU Emissions Trading System and in the CDM Latest on Bioenergy in the EU Emissions Trading System and in the CDM B. Schlamadinger.
Technology Transfer and Investment Risk in International Emissions Trading (TETRIS) Work Package 3: Permit Supply from the CDM (TETRIS Meeting, Amsterdam,
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Carbon Finance North America Workshop NYC Catherine A. Lee, Esq. Consultant to Maine DEP June 15, 2007 The Nation’s First GHG Cap and Trade Program
Baseline developments for NEC Directie revision Projections Expert Panel 25 October 2007 Dublin, Ireland Eduard Dame DG Environment C5, Energy & Environment.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
1945  Second World War ended  Europe united as the European Coal and Steel Community, the founding members of this organisation were Belgium, France,
IIASA J. Cofala Methodology for estimating the control potential and costs for PM emissions in Europe Costing method, cost components, parameters Types.
Non-CO 2 Greenhouse Gas Offset Projects: Basic Considerations Karl H. Schultz Climate Mitigation Works International LLC Panel Three: Design Issues RGGI.
Status of Joint Implementation Jari Vayrynen World Bank Carbon Finance Business Host Country Committee Washington 15 February, 2005.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Providing critical insights into energy and environmental markets EU ETS: Calm, but for how long? Energy Risk Europe 2006 Atle Christiansen,
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
WP 2 : Technology transfer in JI TETRIS PROJECT TEAM MEETING Jin Lee, Research Associate Jake Schmidt, International Program Manager 21 June 2006, Amsterdam.
1 Technology Transfer and Investment Risk in International Emissions Trading FP6 – Priority 8 - Policy-oriented Research Funded by: European Commission,
EU Emissions Trading System (EU ETS): Rationale, outcomes and ethics
U.S. EPA and the Global Methane Initiative: Supporting Coal Mine Methane Project Development in SW China Southwest China Coal Mine Methane (CMM) Development.
TÜV SÜD Group Carbon Management Service Methodology and Project Development – Notions of a DOE Methodology and Project Development – Notions of a DOE PCF.
GHG projections of Romania-How much is available? April 30 Bucharest, Romania Gamze Celikyilmaz-Aydemir Climate Change Department The Regional Environmental.
Policy, normative base and experience of Kyoto Protocol implementation in Bulgaria and other Central European Countries Daniela Stoycheva Consultant emissions.
EBRD and Emissions Trading Financing GHG emission reduction projects 29 September 2009, Sofia Friso de Jong Carbon Finance Analyst Energy Efficiency and.
The Emissions Trading System – ETS Innovation Fund, Modernisation Fund and Indirect costs 1 Marcin Bodio, Ph.D. Chief Executive Officer, CEEP the 4th of.
Estonia’s strategies regarding Joint Implementation and Green Investment Scheme Eve Tamme Estonian Environment Information Centre.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
PEOPLES’ FRIENDSHIP UNIVERSITY OF RUSSIA ENVIRONMENTAL DEPARTMENT Degree Work Thesis : Analyzing the Problem of Extension of the Kyoto Flexible Mechanisms.
UNFCCC Technical Workshop on Joint Implementation
Preparations for the revision of the Gothenburg Protocol
Recent Cap and Trade Programs: EU ETS and RGGI
UNFCCC JI Workshop, Bonn
Meeting with Stakeholders on proposed Article 7a of COM 2007(18)
European Commission ECCP II WG 1: ECCP Review
“GHG Data – 2006” Greenhouse Gas (GHG) Emissions Data for 1990–2004
Understanding Updates to the EPA Inventory of Greenhouse Gas Emissions from Natural Gas Systems Richard Meyer Managing Director, Energy Analysis August.
Global Summit of Women Warsaw, Poland
ERUPT Lennard de Klerk Moscow, 27 May 2004
Meeting with Member State experts on Life Cycle Assessment of fuel in relation to Article 7a of proposal COM 2007(18) Interaction with ETS 17 July 2007.
Possibilities for promoting environmental protection projects
Presentation transcript:

WP 5 : JI Potential in Eastern Europe TETRIS PROJECT TEAM MEETING Jake Schmidt, International Program Manager Jin Lee, Research Associate ******** 21 June 2006, Amsterdam

Methodology: Emissions in Eastern European Countries in the EU l Reviewed existing data on current and projected emissions in Eastern European countries in the EU »European Environment Agency »DG TREN l Summarized the National Allocation Plans »Phase I final NAPs »Assessments of EU Directive on Phase II NAPs »Summary of proposed Phase II NAPs where available

Almost All New Member States Below Kyoto Target Levels

Most on Path to Meet Their Kyoto Targets l For many of these countries they are also expected to be below their base year levels in 2010 with existing PAMS »Slovenia is exception & is projected to remain above its Kyoto Target w/ additional PAMs under consideration l The total surplus of emissions (difference between emissions and Kyoto target) projected to decline from over 30% in 2003 to 5-9% in 2010 l Implies that these countries will likely have excess AAUS for sale…Not surprising »Czech Republic and Poland are projected to have the greatest excess »Followed by Estonia

Methodology: JI Potential in Eastern Europe l Determined that the GAINS results from IIASA model provided the most comprehensive data on mitigation options and costs in Eastern European countries l Considered eight countries since they are the “big guys” »New EU Member States: Poland, Czech Republic, Slovakia, and Hungary »Accession Countries (or Candidate Countries): Bulgaria and Romania »Russia and Ukraine l Given issues of double-counting for countries in (or likely to be in) the EU ETS, only considered non-CO2 gases from these countries »For Russia and Ukraine included all options

GAINS Results: MAC curve for all Gases and all Countries

GAINS MAC Curve: CO 2 Russia & Ukraine

GAINS MAC Curve: CH 4 All Countries

Methodology: JI Potential in Eastern Europe (2) l Conducted “on-the-ground” case study in Poland to compare GAINS mitigation options with practicalities of JI »e.g., project size, existing methodologies in CDM, diffusion of reductions l The majority of F-gases emission in Poland comes from dispersed sources and does not lend itself easily to JI »To date there are no known JI projects implementing abatement of these gases. For these reasons, the emissions reduction opportunities in F-gases was left out of this consideration. l Of all the N 2 O abatement technical measures considered by the GAINS model, only N 2 O abatement technologies from nitric acid production can be considered as a potential JI project in Poland. l For CH 4 abatement, reduction of methane from coal mining and reduction of methane from landfills involve technologies recognized by approved CDM methodologies.

Methodology: JI Potential in Eastern Europe (3) l Modified GAINS results based upon Poland case study and other realities of JI: »All CO2 emissions reductions from Russia and Ukraine were considered potentially JI eligible. »Only reduction of N2O from nitric acid and adipic acid production was included for all countries. »For CH4, only reductions from coal mining, landfill gas recovery, capture of methane from oil and gas production, flaring instead of venting of gas in refineries, and biogas from manure management was included for all countries »For F-Gas emissions reductions, no options were included »For all feasible options, the full technical potential of GAINS was included »Only emissions reductions at less than €30 per ton CO2e are shown

JI Potential for All Countries l In total, estimated that there is a JI potential in these Eastern European countries of 14,798 million tCO2e available at less than €30 per ton

JI Potential By Country

Conclusion l For most of the Eastern European countries, the JI mitigation options are likely to mostly occur in the non-CO2 gases due to double counting l At less than €10 per tCO2e—close to the current JI price »Total emissions reduction of 14,783 million tCO2e is available as JI projects in these countries. »Approximately 44%—6,452 million tCO2e—of these reductions are available at a net savings through coal bed methane recovery measures. l An additional 7,697 million tCO2e is available at adipic and nitric acid plants at a cost of €0.4 per tCO2e. l Above €10 per tCO2e, the achievable emissions reductions are modest—15 million tCO2e— up to a price of €17 per tCO2e. l In comparison, the JI pipeline as of March 2006 (UNEP Risø Centre, 2006) had projects totaling 11.7 million tCO2e per year in the Eastern European countries in this study. »In reality, the actual JI projects are likely to be less than the technical potential assessed in GAINS and modified in this report since practical aspects will likely limit the amount. l Based upon the approach utilized in this report, the largest amount of JI potential emissions reductions at less than €10 per tCO2e are available in Poland (39%), followed by Czech Republic (19%), Ukraine (12%), and Romania (10%).

Next Steps l First draft of WP5 report delivered to Ecoplan l Revised Draft based upon Ecoplan’s comments provided 16 June l Awaiting additional review and distribution to other project partners l Then WP5 will be complete