An Overview of the CLIC Testing Program W. Wuensch CLIC ACE 16-2-2008.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Recent 30 GHz CTF2 M. Gerbaux, S. Döbert, Jan Kovermann, R. Zennaro.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Design of Standing-Wave Accelerator Structure
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Structure Nick-Names and Documentation Germana creates/created a structure traveler describing the handling (Features: each step, with date and description,
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
CLIC RF manipulation for positron at CLIC Scenarios studies on hybrid source Freddy Poirier 12/08/2010.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Progress and Plans on Warm Cavity Technology Sergio Calatroni – CERN On behalf of the CLIC Structures Team.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
Accelerating structure and PETS baseline parameters and layouts - selected issues W. Wuensch
High-gradient rf constraints W. Wuensch X-band workshop
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
CLIC Accelerating Structure R&D Introduction W. Wuensch CLIC ACE
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
Update on PETS experiments (Igor for the CLIC collaboration)
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Test Accelerating Structures Designs, Objectives and Critical Issues
An Overview of the CLIC RF Structure Development Program ~
NC Accelerator Structures
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Summary of the test structure design
Testing Infrastructure, Program and Milestones
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Progress in the design of a damped an
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

An Overview of the CLIC Testing Program W. Wuensch CLIC ACE

Outline 1.Key issues. 2.High-power RF testing objectives 3.Testing with beam 4.Specialized tests

Key Issues The two main high-power effects which limit gradient are RF breakdown and pulsed surface heating. Dark current capture may one day limit gradient but some (limited) analysis indicates that it should not be a significant problem. RF breakdown Pulsed surface heating

Are CLIC parameters within reach? We have fully designed CLIC PETS and CLIC_G which are based on our latest high-power constraints (Alexej’s talk). The constraints are in turn based on quite a number of tests, mainly from the NLC/JLC program, and a reasonably consistent theory. Consequently the structures should work. From another perspective, we have two (more and less) direct tests that that indicate that 100 MV/m is feasible for certain geometries of accelerating structures.

CLIC goal Old CERN X-band structure tested at SLAC, 153 MV/m (first cell), 150 ns stable over minutes. 100 MV/m within reach?

136 MW within reach? Judging the likelihood of feasibility from previous results from PETS in CTF2 is very difficult – different geometry, short pulse, power loss with damping material installed, no breakdown rate measurement. On the other hand the CTF3 mid-linac PETS has produced up to 100 MW in a 9 mm aperture at 30 GHz. However it doesn’t have any higher-order mode damping and no breakdown rate measurement has been done (yet). What makes us most confident is that all high-power parameters are lower in the PETS than the accelerating structure except total power.

Plans Demonstrating feasibility should thus simply consist of building and testing the CLIC PETS and the nominal CLIC accelerating structure. Two milestones and everybody is happy. We will do this. This is ‘ Plan A ’. Special note on PETS: CTF3 can be used to test nominal geometry but the structure needs to be longer to compensate for the lower current than in CLIC. PETS test program will be described in detail by Igor. We will also test other structures to cover a number of uncertainties, a number of things that could go wrong, provide data for further optimization and help with basic understanding and work towards higher efficiency. This is ‘ Plan B ’. I will discuss this next. Details of the testing accelerating structure program will be presented in Riccardo’s and Steffen’s talks. Test structure fabrication by Germana.

Subjects and questions for Plan B The damping features may directly or indirectly affect gradient. The test results shown were for undamped structures. The main indirect effect of damping waveguides is to lower v g and R/Q for the same iris aperture. P/C and Sc (Alexej’s talk) change relatively little but if there is a direct v g dependence this could be important. Potential direct effects include pulse-surface-heating-induced-breakdown (NLC/JLC couplers) and slots in the high electric field region directly result in field enhancements. ACTION – test structures with and without damping features. Dependence on gradient on iris diameter. Smaller diameter is clearly better for gradient (experiment and theory) BUT worse for beam dynamics and consequently efficiency. Optimized CLIC structures are generally smaller aperture than NLC/JLC structures so we are obliged to make some extrapolation of the dependence. ACTION – we have an iris scan experiment.

Plan B continued Effect of tapering. Optimized CLIC structures generally have stronger tapering than NLC/JLC structures since we are not constrained by precise dipole mode detuning. We have some evidence that a particular geometry reacts differently to breakdown at the beginning and end of the structure (Igor). ACTION – we test more and less tapered structures. Fabrication and preparation. For the old CLIC parameters, 30 GHz and 150 MV/m, we focused on milled quadrant manufacture which has given mixed and hard to interpret high-power results so far. We need a feasibility demonstration as soon as possible so it is best to take advantage of all the NLC/JLC expertise. ACTION – order complete test structures, about 13 in pipeline, from SLAC and KEK and resurrect old CLIC disk technology. Details in Germana’s talk. Statistics. We do not have clear idea of the reproducibility of gradient (Toshi and Chris have high statistics mentioning this point). ACTION – fabricate at least two of every structure type. Is this nearly enough? Couplers. We know this will be an issue but we already have a full test program. ACTION – use proven mode launcher couplers for the moment even if they are too long to use in CLIC.

Plan B, last but NOT least Soft copper. We already have indications from rf pulsed heating and other tests that soft copper may be unacceptable for CLIC structures (Sami, talk of Samuli and Alexej). We may end up demonstrating gradient with an unacceptable lifetime. ACTION – continue development and testing of quadrants so that copper alloys can be used (Mauro and Samuli) and continue/strengthen pulsed surface heating testing. In addition, the only option we can see for the PETS are milled octants (with no fundamental difference between octants and quadrants expected) so we are stuck with the technology anyway. PETS tests occur very late. The first tests of PETS in CTF3 will occur in the middle of the year at the latest. Experience with quadrants in accelerating structures very relevant but clearly not enough. ACTION - we will also test the PETS at SLAC in ‘waveguide mode’ to get an indication of performance sooner. The field profile of a PETS with the power fed into the structure is probably much less favorable, we have a high-power first-cell rather than last-cell.

Test Facilities High-power RF: 30 GHz mid linac test stand in CTF3 – 1 port source but with limited availability since CTF3 has many users and objectives. SLAC – 4 to 6 port source but other users to compete with. Are the resources (still) there to run everything? KEK – 1 port source, dedicated. Starting up again in new location. 12 GHz power source at CERN – 1 port source. On line in 2009? Complete presentation of RF test facilities in talk by Steffen. Two-beam test stand: Beam-based source. Primary objectives are: high-power PETS operation with beam, accelerating structure and PETS breakdown kick, accelerating structure and PETS wakefield monitor, inter-structure alignment, breakdown rate as a function of beam loading, beam loading energy spread compensation, CLIC module installation and other non-structure work like stabilization. Can also be used as a high power source for accelerating structures but this will not be easy to use regularly. Roger will describe all this. TBL: Beam based source. Primary objectives are beam dynamics experiments on deceleration but these may lead to feedback on the PETS design. Many PETS will be operated at high-power so much useful information expected. TBL review by Steffen.

Specialized Test Facilities Pulsed surface heating at SLAC: Medium-power source feeding special standing wave cavity is being used to test interchangeable circular samples. CLIC collaborates by supplying samples of materials which are also tested with ultrasound. EXTREMELY interesting and important preliminary results. Samuli will describe all the fatigue experiments. Pulsed surface heating at Dubna: 33 GHz FEM powers traveling wave cell so gives correct pulse length. Slow progress but low cost. Ultrasonic fatigue experiments: For understanding the extension of RF data to CLIC lifetime and a simple and high-availability test set-up to test many materials and material states. Laser fatigue: Started a few years ago to gain experience with short-pulse-length low- depth fatigue and to start while waiting for RF experiments to come on-line. dc spark: The dc spark experiments are used to provide fundamental breakdown data on materials, preparation, effect of/on vacuum, spectra, etc. Simple set-up and samples allows high throughput. Measurements taken with RF have been established for dc spark including breakdown rate. Sergio will describe some dc spark results.