C. Combaret 14 jan 2010 SDHCAL DAQ status in lyon C. Combaret, for the IPNL team.

Slides:



Advertisements
Similar presentations
Julie Prast, DHCAL Meeting, 24 janvier 2008 La carte DIF pour DHCAL (proto au m 2 et au m 3 ) Sebastien Cap, Julie Prast ( LAPP) Christophe Combaret (IPNL)
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
March 2003 CHEP Online Monitoring Software Framework in the ATLAS Experiment Serguei Kolos CERN/PNPI On behalf of the ATLAS Trigger/DAQ Online Software.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
Taikan Suehara, AIDA-2020 kickoff meeting, 3 Jun page 1 Requirements from CALICE-DAQ for WP5 Taikan Suehara (Kyushu University, Japan)
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
CALICE meeting Prague 2007, Hervé MATHEZ 1 DHCAL PCB STUDY for RPC and MicroMegas (Electronics recent developments for the European DHCAL) William TROMEUR,
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Boosting Event Building Performance Using Infiniband FDR for CMS Upgrade Andrew Forrest – CERN (PH/CMD) Technology and Instrumentation in Particle Physics.
Taikan Suehara, CALICE DAQ TF, 7 Apr page 1 CALICE DAQ TF meeting Taikan Suehara (Kyushu University, Japan)
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
C. CombaretCalice week at UT Arlington, march 2010 SDHCAL status in lyon - Power pulsing, DAQ and m3 C. Combaret, for the IPNL team.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Recent Software Issues L3 Review of SM Software, 28 Oct Recent Software Issues Occasional runs had large numbers of single-event files. INIT message.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
7. CBM collaboration meetingXDAQ evaluation - J.Adamczewski1.
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Organization for Micro-Electronics desiGn and Applications HARDROC 3 for SDHCAL OMEGA microelectronics group Ecole Polytechnique CNRS/IN2P3, Palaiseau.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
DAQ Andrea Petrucci 6 May 2008 – CMS-UCSD meeting OUTLINE Introduction SCX Setup Run Control Current Status of the Tests Summary.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
C. Combaret 27 jan 2010 SDHCAL Power pulsing tests status in lyon C. Combaret, for the IPNL team.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
CALICE meeting LYON 2009, Hervé MATHEZ Yannick ZOCCARATO 1 PCB DEVELOPMENTS AT IPNL (PCB and ASIC) PCB for 1m2 of RPC with HR2 William TROMEUR, Hervé MATHEZ,
ASU boards for RPC detectors Production status. Presentation outline Active Sensor Unit electronic board for GRPC detectors – quick reminder – board functional.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
14th january 2010 Actual Micromegas USB DAQ ASU and DIF
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
June 13rd, 2008 HARDROC2. June 13rd, 2008 European DHCAL meeting, NSM 2 HaRDROC1 architecture Variable gain (6bits) current preamps (50ohm input) One.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
14.4. Readout systems for innovative calorimeters
Status of the DHCAL 1m2 GRPC Acquisition
Calicoes Calice OnlinE System Frédéric Magniette
ASU board: PCB production and testings
Integration of CALICE DAQ in common DAQ
Digital Interface inside ASICs & Improvements for ROC Chips
HR3 status.
CALICE meeting 2007 – Prague
Controlling a large CPU farm using industrial tools
Comments on the DAQv2 advancement
Status of the DHCAL DIF Detector InterFace Board
DHCAL PCB STUDY For RPC 1 m2 PCB SOLUTION
The DHCAL DIF Board For the M2 Prototype
University of California Los Angeles
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
CALICE meeting 2007 – Prague
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
AIDA KICK OFF MEETING WP9
Presentation transcript:

C. Combaret 14 jan 2010 SDHCAL DAQ status in lyon C. Combaret, for the IPNL team

C. Combaret 14 jan 2010 News 1.Integration of XDAQ event builder (L. Mirabito) 2.Online analysis (L. Mirabito) 3.DAQ can now be started by main FSM instead of Manual control (still possible). 4.Coupling of small RPC DAQ (Labview) with m2 DAQ (Xdaq) using DIM (R. Dellanegra & L. Mirabito) 5.HR2 m2 tests : ASU OK, Xdaq OK. Scurve OK. 6.Power pulsing in (good) progress 7.Environmental monitoring : temperature, pressure and humidity (S. Cuzon)

C. Combaret 14 jan 2010 Integration of XDAQ event builder (L. Mirabito) DIF sup. 1DIF sup. 2DIF sup. n RU Collector 1 per PC 1 per Slab RU BU FU EVM Root Anaylzer Shared memory I2O RU: Readout Unit BU: Builder Unit FU: Filter Unit

C. Combaret 14 jan 2010 A detailed example SHM RUCollector RU BU FU DIF SHM RUCollector RU BU FU DIF RUCollector RU BU FU DimSupervisor DIM EVM LocalManager XDAQ Event Builder Triggers Tokens Trigger to BU's RootAnalyzer Storage Must run on the same PC Toolbox developped by IPNL Provided by XDAQ DHCAL specific application Processes

C. Combaret 14 jan 2010 Architecture Each application is a web service and can publish web pages –Direct hardware access –Monitoring Each application can be controlled by an FSM –Global configuration using SOAP message from the LocalManager The Event Builder (EVM/RU/BU/FU) is provided and maintained by XDAQ –Software triggers/tokens exchange between EVM and LocalManager –Some generic software developped I2O interfaces from RUCollector and RU and from FU to RootAnalyzer Local manager trigger loop Main constraint: Trigger driven –Trigger veto board needed ( controlled by the LocalManager) –Ok for external trigger, further development needed for auto trigger EVB

C. Combaret 14 jan 2010 Online analysis with Root (L. Mirabito) NumberOfAsic_InTimeHit_map_Level0/1 NumberOfFrame_vs_Asic_InTimeHit_map_OffTime_Level0/1 NumberOfHit_per_Frame_InTimeLastHit_map_Level0/1 NumberOfHit_per_Frame_OffTimeLastHit_map_OffTime_Level0/1 NumberOfHit_vs_Asic_InTimNumberOfFrame_vs_Asic For each DIF : Cumulated in time data Cumulated off time data Last data in time Last data off time

C. Combaret 14 jan 2010 Use of DAQ main FSM Each Xdaq application can be controlled by the main FSM. To do this, it must only know the following states : Halted, Configured and Enabled And implement the following transitions: Configure, Enable, Halt et Stop. Halted Configured Enabled Configure Enable Stop Halt

C. Combaret 14 jan 2010 Hardroc2 m2 Slab tests One buffer for Slow control slow clock is required to access 1 slab of 48 HR2 SLC clock is ok for a single ASU but too depredated for one slab of 48 HR2. Slab fully functional : SLC OK Power OK SLC OK Readout OK Calibration OK We learnt a lot from HR1 m2 : EMI/grounding/shielding problems and (then) solutions found for HR1 successfully implemented in HR2 ASUs Still some tests ongoing on the way to connect 2 ASU together (see Hervé’s talk)

C. Combaret 14 jan 2010 Power pulsing on Hardroc 2 ASU : method As discussed with HR2 designers : 1.Record (reference) Scurves and Bias levels with no capacitor removed 2.Enable PP hardware on DIF (use of Mezzanine pin 1) 3.Enable PP in DIF firmware : PowerOn_x = register OR Mezzanine_1 4.Try PP with no capacitor removed 5.Remove Capacitors on biases of 1 HR2 step by step and check That’s where we are today 6.Record Scurves 7.Remove Capacitors on biases of all asics and check again 8.Record Scurves

C. Combaret 14 jan 2010 Power pulsing on Hardroc 2 ASU : method

C. Combaret 14 jan 2010 Power pulsing on Hardroc 2 ASU : preliminary results Vbg (BandGap) PowerOn Command 10us

C. Combaret 14 jan 2010 Power pulsing on Hardroc 2 ASU : preliminary results Vth 0 PowerOn Command <20us

C. Combaret 14 jan 2010 Environmental monitoring (S. Cuzon) One independent measurement station developed (USB, based on Labjack unit) with : 1 Pressure channel (atmospheric range) 1 Humidity channel 6 Temperature channels One supplementary Labjack unit (8 independent free channels available) All included in a independent Xdaq application SOAP/I2O communication with Xdaq main DAQ Disk data logger Online display of parameters

C. Combaret 14 jan 2010 Thank you