Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No. 40114 New Hanover and Brunswick Counties, North Carolina October.

Slides:



Advertisements
Similar presentations
State Bridge Program STIP Development Process Oregon Department of Transportation October 3, 2007.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Mead Valley Municipal Advisory Council October 17, 2012
Great Western Corridor Feasibility Study
Forest Service Management Systems (MS) for Forest Highways (FH) SAFETEA-LU Training Webcast April 2006 SAFETEA-LU Training Webcast April 2006.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Harlan to Hazard Study Public Workshop #2 Harlan to Hazard Study Public Workshop #2 Harlan, Leslie, & Perry Counties, KY December 2003 Harlan, Leslie,
New I-65 Interchange at Worthsville Road Welcome!.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
Federal Aid Project No. STP 2603 (501) Environmental Assessment
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
EEM Established in 1989 Section of the Streets and Highways Code provides the Legislature with the authority to allocate $10 million annually. Fiscal.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
MTF Rail Development Forum
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Presentation Outline Summary of efforts-to-date Broward County LRTP Amendment Process Next steps.
Destination 2030 Regional Transportation Plan Timeline and Process January 2004.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Trends in Rural Transportation Planning John Marshall Western Piedmont Council of Governments Hickory, NC.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Current Construction Projects Major Projects Pinellas County.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Dallas County Area Transportation Projects Update Dallas County Commissioner John Wiley Price.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
FY 2017-FY 2021 Project Priorities Okaloosa-Walton TPO Gary Kramer Senior Planner, TPO Staff
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 1 Process Development and Integration for the Six-Year Program.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
US-169 / I-70 “North Loop” Planning Environmental Linkages Study Pre-Proposal Workshop.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Interagency Coordination in Long Range Transportation Planning
Potomac Yard Metrorail Station
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Regional Roads Committee
Willow Meadows Civic Club Meeting September 13, 2011
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Wilmington Collector Street Plan
N.C. Strategic Transportation Corridors Master Plans
N.C. Strategic Transportation Corridors Master Plans
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October 14, 2009

Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October 14, 2009

About Cape Fear Skyway

Project History  “Southern Outer Loop” Project from 1993 Thoroughfare Plan Described part of this loop as the “Southern Bridge” – an extension from Independence Blvd. northward to Eagle Island to interchange with US 74/76

1993 Thoroughfare Plan Proposed Southern Outer Loop

Project History  Project described as “Southern Bridge” in Greater Wilmington Urban Area Transportation Plan Revised description to have western terminus at existing US 17 and proposed Wilmington Bypass (I-140) interchange 2025 Plan removed “Southern Outer Loop” project completely

Project History  Included in current WMPO Long Range Transportation Plan (2030) as “Cape Fear Skyway” Described as a project that extends east from US 17 at the proposed I-140 (Wilmington Bypass) interchange, across the Cape Fear River, to Independence Boulevard at US 421. Listed as one of six priority projects in the 2030 Plan.  Included in the Strategic Highway Corridor Initiative and the NC Intrastate System

2005 Thoroughfare Plan Proposed Southern Bridge

The I-140 Loop I-140 FUTURE I-140“A” “B”

I-140 and the Cape Fear Skyway Study Area Future I-140 Cape Fear Skyway Study Area

Feasibility Study Alignment Cape Fear Skyway

Preliminary Alternatives

Brunswick Forest Development Plan Brunswick Forest Proposed New Development Mallory Creek

Brunswick Forest – Current Development Brunswick Forest Mallory Creek Proposed New Development

Additional Preliminary Alignment Segments Mallory Creek Proposed New Development Brunswick Forest

Potential New Corridors Brunswick Forest Mallory Creek Proposed New Development

Project History  Feasibility Study in 2003 by NCDOT  Current WMPO LRTP adopted in 2005  Agency Scoping Meeting – January 13, 2006  Citizen’s Informational Workshops – April 10, 2006 and April 11, 2006  Notice of Intent – May 11, 2006  Project included in NCDOT’s STIP

Project Status  Preliminary design and planning studies are currently being developed Purpose and Need Statement Alternatives Screening

Project Status – Milestones Achieved  Prepared Draft Section 6002 Coordination Plan  Prepared Draft Purpose & Need Report  Prepared Draft Alternatives Screening Analysis  Prepared Draft Bridge Study Report  Conducted Preliminary Field Studies  Prepared functional design plans for bridge crossing area

Project Status – Anticipated Milestones  Draft Environmental Impact StatementMarch 2011  Final Environmental Impact StatementMarch 2012  Record of DecisionSeptember 2012