BE-BI camera projects HS, SB, EB March 2015. outline New digital cameras New rad-hard cameras (vidicon replacement)

Slides:



Advertisements
Similar presentations
Children & Young Peoples Service. Service Commissioning Martin Satchwell.
Advertisements

IP Surveillance Business Partner Program April 2014.
IP Surveillance Business Partner Program April 2014.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Chapter 5 Buying business services. Program The increasing importance of services Differences between goods and services A classification of services.
WATTSTOR Limited Inaugural Shareholders Meeting Friday 10 th October 2014.
DfES/MIAP Unique Learner Number Consultation: 1st December th March Briefing on the consultation into the feasibility of the Unique Learner.
Modulight laser solutions for Industrial applications Powering your productivity.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
Rev 11.  Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps 
ICT and Education Indicators S
(BI) Needs and Experience with Cameras in Radioactive Environment Stephane Burger BE BI-PM BI review on Radiation development and testing 22 nd of November.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
From AquaPower A Leader in Electric Instantaneous Tankless Water Heaters 2011.
The Lean Sourcing Process
The new supply chain for books EDItX and Web Services Francis Cave EDItEUR The Book Business and International Information Standards EDItEUR Seminar, Moscow,
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
Collaboration Proposals HERMANN SCHMICKLER, MELBOURNE
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
MOVING TO GREEN TECHONOLOGIES VODAFONE GHANA EXPERIENCE by Mamle Asare Sustainability Manager Vodafone Ghana.
Agricultural Outlook and Situation Analysis for Food Security Proposal Submitted to National Food Security Mission Ministry of Agriculture By NCAER, New.
Doing business with CERN Anders Unnervik 3 November 2014.
Main findings Eurolib Annual Meeting Den Haag, June 2014 Francesca Rio (European Parliaments Research Services) Survey on tender procedures in EU.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
U.S. Department of the Interior U.S. Geological Survey Summary of OSL RFI Inputs Received 20 April 2011.
AWARENESS – Potential Activities Business Assist Programme.
Making the best of LSIS NW Learning Fair, March 2011 Jo Higgins Regional Development Manager, NW.
Virtual Collaborative Social Living Community for Elderly Kick Off Event University of Cyprus Prof. George Samaras Co-Living.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Memorandum of Understanding RD-51 Collaboration 1MPGD-WS, NIKHEF April 2008H.Taureg.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
Status of QUACO project
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ian Bird, WLCG MB; 27 th October 2015 October 27, 2015
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
‘Go e-sussex’ For a better broadband across East Sussex April 2013.
Technology Department WP2 Progress Report Th. Otto
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
The ATLAS Collaborative Tool Project A broad overview.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
WP4: Brainstorming meeting Geneva – 19 th March 2009 Outcome of the meeting Including follow-up sessions Session participants.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
Famosa S.A. Full Speed Supply Chain Jorge León Bello__Master GEPS.
Industrial Control Engineering ADE Rapid Application Development Environment.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Delivering value to the NHS Customer Satisfaction.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Roadmap for triplet cryostats
Brief Status SPS Prototype PSB Prototype Installed in LS1
Purchasing supplies at CERN
The Business-to-Business Market
(Procurement, testing of magnets)
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Best practices ideas for improvement of industrial return
Service lives of R&D.
The Lean Sourcing Process
Digital Marketing institute in bangalore.
Management Information Systems 8/e Chapter 1 Managing the Digital Firm
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Presentation transcript:

BE-BI camera projects HS, SB, EB March 2015

outline New digital cameras New rad-hard cameras (vidicon replacement)

New digital cameras(1/2) BE-BI has some 100 cameras installed, which need regular replacement. So far products have been bought from the consumer market. Problem: Short lifetime of products…every new procurement needs a new integration into the controls infrastructure Proposal: Design our own camera based on long term available camera chips, define interface to control system, have cameras designed and produced by collaboration partner/industry. Specifications in separate file

New digital cameras(2/2) So far done: Contact with KT group and FI department outcome: Follow procedure for industrial procurement, i.e. market survey, tendering, FC…. Proposal: Suggest development part to a partner institute, which shares the same worry…..do the development in collaboration up to a prototype (year 2016). Then launch MS etc. for industrial production of 100 pieces If by April 2015 no development partner institute is found, launch MS for development and production.

Vidicon replacement (1/2) Replacement of the rad-hard video systems needed: Vidicon tubes are no longer produced CERN has still a stock for some time, but action is needed now. So far no (European) industrial supplier found that offers a replacement tube (at a reasonable price). Recent contacts to a Russian provider; contact through Samara Space University. This Russian industry partner has similar products, but the size of the tube is different (30% smaller),the electrical interface is different and the scanning of the beam in the tube is based on a different principle….hence a new camera design is needed. There is an American provider with some rest stock of vidicon tubes

Vidicon replacement (2/2) Suggested action list: - Stephane buys “immediately” a significant stock of remaining tubes from the US provider…for 100 kCHF (the total available budget is 300k from consolidation) - we invite an expert from the Russian contact to CERN in order to explore the possibility of a complete outsourcing of new camera development plus long term delivery of tubes. - we still investigate possibilities for European suppliers: meeting with Mirion Technologies next week