GCRP – DS3 Update 11 th February 2015 Robbie Aherne.

Slides:



Advertisements
Similar presentations
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Advertisements

The Internal Energy Market: Remaining challenges and the role of wind power Paul Wilczek Senior Regulatory Affairs Advisor – Grids and Internal Market.
RES-E Impact on Transmission Grid and Power System Reserves
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Balancing Update Stakeholder Group Meeting - 4 November 2009.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne.
Energy Storage Battery Storage February MW Los Andes Chile, MW Johnson City New York, MW Laurel Mtn. West Virginia, 2011 AES.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Grid Compliance and Wind turbines in weak and Island grids –
SINTEF Energy Research 1 Fault ride-through testing of wind turbines Presented by: Olve Mo Paper co-authors: John Olav Tande Leif Warland Kjell Ljøkelsøy.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
LABORELEC © LABORELEC – 2006 – 1 dr. ir. Marcel Didden Choosing the appropriate voltage dip mitigation.
1 The Tres Amigas SuperStation VLPGO November 2011.
RTWG Report to TAC August 5, 2010 Howard Daniels.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Sanjay Garg General Manager PGCIL/ Ministry of Power
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
Future Energy Scenarios 2015 Operability John West Electricity Policy and Performance Manager, Network Strategy.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Power Quality: A Nonlinear Adaptive Filter for Improved Power System Operation and Protection Research Overview: Focuses on the application of a new algorithm.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
Long Term Study Transmission Results May 21 st, 2013.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Energy Storage Modeling for Distribution Planning Roger C. Dugan Jason A. Taylor Davis Montenegro EPRI.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
Agenda TSOG 8th November
GC0087 Frequency Response Provisions
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
DS3 and Qualifier Trials Update
Challenges of integrating Variable Renewable Energy Sources (V-RES)
EU-IPA12/CS02 Development of the Renewable Energy Sector
Solar Energy Commercialization
Jim Mcintosh Director, Executive Operations Advisor California ISO
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

GCRP – DS3 Update 11 th February 2015 Robbie Aherne

System Services Decision 60 €m 7 Services 235 €m 14 Services Ancillary Services Capacity Payments Energy Payments Ancillary Services / System Services Capacity Payments Energy Payments Today Tomorrow 2

System Services Decision Availability payment basis Interim Regulated Tariff 2016/17 Regulated Tariff & Annual Auction 235 €M Cap in 2020/21 3

RoCoF Implementation Project 4 Generator Studies Project TSO-DSO Implementation Project Alternative / Complementary Solutions Project Plan A: Move to 1 Hz/s over 500ms Plan B: Stay at 0.5 Hz/s 1.Synch Comps / Rotating Stabiliser 2.Storage 3.Flexible Plant 4.Parking 5.Non Synchronous Response (DSM, HVDC, WFs) 6.Operational Measures 7.AC Interconnection to GB Can synchronous generators ride through a high RoCoF event? Can DSOs protect against islanding using different settings or measures

System Policy Cauteen Nodal Voltage Control Pilot Project with ESBN – progressing Ramping policy and tool development – progressing Primary and static reserve requirement study – progressing Automated approach to large scale dynamic studies using Plexos – complete * High SNSP Report – H complete * High Wind Speed Shut Down report 2013 – complete * Glenree unity power factor study – complete *

WSAT & CCTC WSAT WSAT frequency assessment gone live in Dublin and Belfast Control Centre Tools & Capability Inertia and RoCoF constraints functionality included in RCUC on 15/11/2014 Significant improvements in accuracy of short circuit tool – due to be complete by Q1 2015

Workstream Plans – Annual Review Draft to DSOs Draft to RAs Draft to Advisory Council Publication Revised “Operational Capability Outlook”

2015 Focus Areas RoCoF Implementation Project System Services Detailed Design and Implementation Project Operational policy –Frequency regulation –Ramping –Voltage dip induced frequency dips –System high frequency mitigation etc. Control Centre Tools –Short circuit analysis tool –Increased WSAT functionality –EMS Integration Project Continued TSO-DSO co-operation