Santa Margarita Region MS4 Permit – Pyrethroids Evaluation Jason E. Uhley, P.E. Riverside County Flood Control & Water Conservation District
Santa Margarita Watershed Overview Permit Requirements Ongoing Activities Presentation Outline
Issued within RWQCB jurisdiction on Countywide Basis Santa Ana Region – Santa Ana RWQCB Santa Margarita Region – San Diego RWQCB Whitewater River Region – Colorado RWQCB Introduction to NPDES MS4 Permits
General Watershed Information Total Area740 sq. mi. Riv. Co. Area540 sq. mi. Riv. Co. Population260,000 Watershed-Wide Non- Urban Land Use 93% Hydrologic ModificationYes Average Annual Rainfall10-12” in valleys Rainfall2.6” ImpairmentsNutrients, Metals, Turbidity Santa Margarita
Unique Conditions in the Santa Margarita Watershed Ephemeral – Receiving waters typically dry Limited rising groundwater near SMR No connectivity with urban runoff during dry conditions Introduction to NPDES MS4 Permits
Issued to municipal operators of MS4 (cities and County) Regulates stormwater and non-stormwater discharges Eliminate non-stormwater discharges Manage stormwater discharges Santa Margarita NPDES MS4 Permit (SD RWQCB) County of Riverside Cities of Temecula, Murrieta and now Wildomar RCFC&WCD NPDES MS4 Basics
Permittee Structure RCFC&WCD Principal Permittee Murrieta Co-Permittee Temecula Co-Permittee County Co-Permittee
Typical Permit Compliance Programs Address: Legal Authority Elimination of Illegal Connections/Discharges Construction Inspection Business Inspection Municipal Facility and Activity BMPs New Development BMPs Public Education and Outreach Watershed Monitoring/Annual Reporting Introduction to NPDES MS4 Permits
Permit Requires Monitoring at Major Receiving Waters Chemistry Bioassessment Toxicity If Toxicity detected, must conduct TIE After TIE verifies source, Toxicity Reduction Evaluation required Basic Monitoring Program
Monitoring Locations
– Persistent Toxicity detected in wet weather flows – Pyrethroids determined as likely source Initiated direct measurements for pyrethroids, TRE Notes: 1) Have not conducted sediment toxicity tests 2) Toxicity not detected during dry weather, however, receiving waters are limited to rising groundwater – no connectivity with urban runoff – during dry conditions Monitoring Results to Date
Monitoring TIEs to verify persistence Pyrethroids testing to assist with source tracking Regulatory CDPR Labeling Requirements CASQA Pesticides Sub-committee Education and Outreach HHW/ABOP Coordinate with Ag Commissioner and UC Cooperative Extension Require IPM for municipal operations Point of Sale Outreach General Education/Outreach Ongoing Activities
Toxicity Reduction Evaluation Continued evaluation of persistence and magnitude of toxicity Literature Review Source Evaluation and Tracking Pyrethroids monitoring Surveys of various representative land uses Evaluate store sales, Ag. Commissioner, and CDPR data Develop new BMPs Public Outreach Continued lobbying of CDPR, EPA Ongoing Activities
Annualized Costs$135,525 Toxicity Testing - $20,700 TIE - $69,625 Pyrethroids Monitoring $14,000 TRE Cost - $31,200 BMP Implementation – To Be Determined Ongoing Activities