R&D PROGRAM June/2011. 2 TOPICS 1. 2. 3. General Information Neoenergia R&D Legislation.

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
Outsourcing of Social Services in Bulgaria. Reform on the Child Care System: Taking Stock and Accelerating Action3-6 July, Sofia, Bulgaria 2 Social Services.
Medium-term strategic plan: planned financial estimates for the period E/ICEF/2009/AB/L.5.
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
1 The EU and the Turkish Cypriot community Jan Truszczynski, Deputy Director General DG Enlargement, European Commission Nicosia, 6 March 2008.
Planning and use of funding instruments
Implications for the Regions EU-Regional Policy 1 Governance White Paper Introduction Adoption of White Paper on European Governance, July 25, 2001 Aim:
- GDP 2011 versus 2010 – increase by 5.5%
Standardization in China
0 - 0.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
1 Working Together to Lessen the Impact of Rising Energy Prices on Our Customers June 17, 2008 Delaware Public Service Commission Gary Stockbridge, President.
REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
Federal Buildings Personnel Training Act of 2010
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
BRAZIL: PUBLIC AND PRIVATE PARTNERS TOWARDS A WATER-SAVING MOVEMENT IN THE DOMESTIC ENVIRONMENT Zaragoza, June/2008.
Security metrics in SCADA system Master of Computer and Information Science Student: Nguyen Duc Nam Supervisor: Elena Sitnikova.
1 Experiences in Hydropower Development in Nepal An International Perspective Einar Stenstadvold Executive Vice President Asia, SN Power.
Engineering Technology Division
Technical Workshop on Tools and Measures to Inform Inclusive Green Economy Policies 2-4 July 2013 UNEP Joy A. Kim.
HIGH COUNCIL FOR ECONOMY, INDUSTRY, ENERGY AND TECHNOLOGIES 1 Metrology policies to foster the competitiveness of industry J.F. Magaña.
Simplified VO M&V Protocols Approved May 4 th, Simplified VO M&V Protocol can be applied to distribution systems with Residential and Small Commercial.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Energy Saving in Hospitals: Hong Kong Initiatives
São Paulo, Brazil, 30 July 2013 Environmental Sustainability Solutions for Sustainable Management Erika Barbosa Ribeiro, Project Coordinator, CPqD
Public Safety Related Applications Summary July, DRAFT -
Special Economic Zones of the Russian Federation Ministry for economic development of the Russian Federation Department of special economic zones, regional.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Power Generation In Singapore Presented By CHAN Y K Commercial Specialist Commercial Service, Singapore.
CETEC SENAI Mission: Technological Solutions for the Industry Challenges Total area (m 2 ): Built area (m 2 ): Technical depts.:11 Laboratories:54.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Foundation for Agricultural Innovation (FIA) MINISTRY OF AGRICULTURE Fernando Bas M. Executive Director Promoting the Use of Bioenergy in the agricultural.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
IURPA JULY 2003 IURPA - OCTOBER/2001 REVENUE PROTECTION IN BRAZIL SOME INFORMATION, FEW CERTANTIES AND MANY DOUBTS.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Cleve L. Freeman – Los Angeles, CA USA Energy Loss Reduction Programs & Profits, Rio de Janeiro, Brazil 11 – 13 August 2004.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
WELDINGH_DK_AUTHOR_6.2_12 Barcelona May Impact of the Deregulation on the Safety H. Weldingh –DEFU I.R. Ludvigsen –The Danish Electricity.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Distribution Systems-General
Business Process Mapping “Power Sector - Distribution”
Frankfurt (Germany), 6-9 June 2011 Paulo Pereira – Brazil – Session 2 – 0993 OPTIMIZATION OF VOLTAGE REGULATOR SETTINGS AND TRANSFORMER TAP ZONES IN DISTRIBUTION.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Fort Stanwix National Monument Energy Audit Contract
The Ontario Energy Board and Demand-Side Management
Transmission and Distribution Loss Study
Brazilian Electricity Regulatory Agency ANEEL
Presentation transcript:

R&D PROGRAM June/2011

2 TOPICS General Information Neoenergia R&D Legislation

3 Regulation: Federal law 9.991/2000 states that Generation, Transmisson and Distribution utilities should invest a minimun % of net operating revenue in R&D. Aneel establishes guidelines and instructions that regulate the elaboration and approval of R&D projects. Main objective: encouraging the constant search for innovations and to confront the technological challenges of the electrical sector. R&D for Electric Utilities in Brazil

4 RESOURCES FOR R&D % of Net Operating Revenue GenerationTransmissionDistribution 0.4% 0.2% Brazilian electric companies should invest ~R$ 350 milion/year in R&D projects

5 INSTITUCIONAL ARRANGEMENT ANEEL Consultants Utilities ANEEL Universities R&D Centers Development of Project Proposal Evaluation of Proposals Monitoring Supervision Manufacturers

6 R&D ANEEL GUIDELINE (2008) Criteria for development and appraisal of proposals The participation of foreign researchers should be through direct contracting by the national executing entities, being required to carry out the project activities in Brazil

7 PRIORITY ISSUES FOR R&D Energy eficiency Alternative energy Power quality and reliability Metering, billing, colect and comercial losses Social and Environment (Sustentability) Planning and operation of electric systems Supervision, protection and control Safety of people and facilities

8 NEOENERGIA PROGRAM – KEY FIGURES Beginning of Program: projects approved by ANEEL 182 completed projects; 35 ongoing projects R$ 88,30 millions invested 54 participating entities Coelba Annual spending: R$ 7,5 millions Celpe Annual spending: R$ 5,1 millions Cosern Annual spending: R$ 2,0 millions Neoenergia annual spending (G,T,D): R$ 18 millions

9 MAIN PROJECTS – EXAMPLES Fault Locator Construction and pilot implementation of a low cost prototype automatic fault locator for distribution (13,8 kV). Fast Magnetic Suppressor of Voltage Variation - SMRFT Development, prototype construction and application, in the utilitys electrical system at 13,8kV, of equipment used to minimize SDVVs (short duration voltage variations) and voltage stabilization in steady state. Supervisory System of Operation Control of Electrical System in Isolated Places Development of a control supervisory system for electrical system operation in isolated places, based on a pilot model of a hybrid energy matrix implementation, with pilot application on the island of Fernando de Noronha.

10 MAIN PROJECTS – EXAMPLES Robotic Camera in Hot Stick for the Inspection of Networks and High Voltage Prototype of an inspection system for networks of medium and high voltage energized using robotic video camera to stick. Insertion of New Fluid in Circuit Breakers Economic mixture of vegetable oil and mineral in circuit breakers and technically with efficiency gains

11 Equipment for load protection against sag voltage - Prototype MAIN PROJECTS – EXAMPLES

12 System to Record and Read Equipment Information Using RFID Tags and PDA MAIN PROJECTS – EXAMPLES

13 Sustainable Crossarm Using Planted Eucalyptus Forests MAIN PROJECTS – EXAMPLES

14 Tools for Replacement of Conductors with Hot Line MAIN PROJECTS – EXAMPLES

15 Thanks!