Subgrade Soil Support and Stabilization

Slides:



Advertisements
Similar presentations
Soil Exploration Part II
Advertisements

CC-5: Post-Traffic Testing FAA Working Group Meeting DATE : April 24, 2012 By: Harkanwal Brar.
Pavement Rehabilitation Method
Dynamic Cone Penetrometer Testing on Airport Subgrade Soils
Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
Objectives Be able to use basic volume weight equations
 Soil compaction :  Compaction is the reduction in voids content due to air being forced out of the soil or dissolved in the soil water by mechanical.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Chemical Stabilization of Subgrades Section Engineers ’ Meeting Lake Cumberland State Resort Park March 5-7, 2013.
Full Depth Reclamation Current Practice Testing Variability Presented To: Canadian User Group for Asphalt Sunday, November 15, 2009 Delta Beausejour Hotel.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
INTRODUCTION Session 1 – 2
‘Characterisation of Granular Materials Rut Resistance’ Austroads project TT1819 Pavement Technology Program Andrew Papacostas (VicRoads) Austroads Project.
Project Title: Chemical Stabilization of Clay Design Department Presenter: Stephan Cheong Date: February 5,2015.
New England Soils 101 October 8, 2009.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
1 Characterization of Granular Base Materials for Design of Flexible Pavements Lulu Edwards, Walter Barker, Don Alexander US Army Engineer Research and.
PI: Erol Tutumluer RA: Tongyan Pan Testing of OMP Aggregates for Shape Properties O’HARE Airport Modernization Research Project.
In Tai Kim & Erol Tutumluer University of Illinois, Urbana-Champaign
Inverted Pavements Project: CSSTP (292)01 Troup County “South LaGrange Loop” Georgia Construction Aggregates Associations 2009 Management Workshops.
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
An Introduction To Chemical Soil Stabilization Presented by: Marco Silvestre, P.EGary Dukewits.
LIME TREATMENT APPLICATIONS at OMP
Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Road Construction Method
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
Soils Investigation Soil Investigation
Soil Compaction and Pavement Design
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting November 26 th 2014 Prof. Ing. Massimo.
Quality Control Testing
Electronic Storage and Interchange of Geotechnical Engineering Data Jennifer D. McPhail.
Module 2-5 Field Sampling and Testing.  Identify reasons for conducting field sampling and lab testing  Describe typical field sampling and testing.
Lecture-8 Shear Strength of Soils
Subsurface Investigation Building structure system.
PERFORMANCE-BASED PROCEDURES FOR IN-PLACE SOIL TESTING 2013 LTAP-TTAP National Conference Boise, Idaho July 24, 2013.
CEP Soil Engineering Laboratory
Nondestructive Testing and Data Analysis Module 2-3.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
1 Kh Training April Gudiance on the selection of Kh Soil Soil to Rock Rock Soil Soil to Rock Rock.
Center of Excellence for Airport Technology OMP Project Meeting, July 14, 2005 David Lange Department of Civil and Environmental Engineering University.
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting September 10 th 2015 Prof. Ing. Massimo.
Unconfined Compression Test ASTM D-2166 /02
 The objective of this task is to develop a mix design procedure for the various types of FDR  Determine what works and what does not work  Each.
HIGH TIRE PRESSURE AND TEMPERATURE EFFECTS ON HOT MIX ASPHALT CONCRETE PERMANENT DEFORMATION USING CUSTOMIZED ASPHALT PAVEMENT ANALYZER April 22, 2010.
Soil and Rock Soil and rock are the principle components of many construction projects. Knowledge of their properties, characteristics, and behavior is.
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
Liquid Soil Stabilizer & Road Compactor BASE2000 D. C. A. GEOTECHNIC. ENGINEERS TOP2000 Liquid Surface Sealer & Dust Control Base Marketing International.
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
R52 Rustenburg-Koster Road
SITE INVESTIGATION.
1 Field validation of constructed sub-grade and pavement John S. Popovics Jeffery Roesler Marshall Thompson David Lange Yi-Shi Liu John Ramirez Department.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
INNOVATIVE INTEGRATED METHODOLOGY FOR THE USE OF DECONTAMINATED RIVER SEDIMENTS IN ROAD CONSTRUCTION Progress Meeting Pisa, February 25 th 2016 “CLEANSED.
Highway Network System
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research.
Co-PIs: Erol Tutumluer Marshall R. Thompson RA: H.S. Brar Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project.
The Engineering of Foundations
Geotechnical Investigation
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
SOIL STABILIZATION USING WASTE FIBERS &FLY ASH
Structural Design of Highway
Field validation of constructed sub-grade and pavement
Pavement materials: Soil
lectures Notes on: Soil Mechanics
Presentation transcript:

Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Co-PIs: Erol Tutumluer Marshall R. Thompson RA: H.S. Brar

Introduction Subgrade performance is a key factor in the overall pavement performance P154 P209 National Airport Pavement Test Facility - Atlantic City, NJ Persistence length is the length which the polymer looks like straight. -e : one negative charge This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements

Introduction (cont’d) The preliminary concrete pavement design for the O’Hare Modernization Program (OMP): 15 – 17 inches of PCC Surface 6-inch Hot Mix Asphalt Base 6-inch Asphalt Treated Permeable Base (!?) “Stabilized” Subgrade Zone (SSZ) Prepared Subgrade North Runway (9L-27R, 7,500 ft) paving is scheduled first for the Spring 2006 (!?) Stockpiles of local soil on runway centerline (excavated from the “Deep Pond” nearby) Primarily fill and cut areas Persistence length is the length which the polymer looks like straight. -e : one negative charge

Research Objectives Consider pavement design inputs for subgrade support Modulus of subgrade reaction, k Consider subgrade support and stabilization requirements with respect to: Need for subgrade stabilization Stabilization admixture(s) stabilization Stabilization depth Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions Persistence length is the length which the polymer looks like straight. -e : one negative charge

Project Tasks Task 1: Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization (Ongoing) Reports and publications collected & submitted as “Technical Notes” on: Subgrade strength/stiffness evaluation techniques Subgrade stability requirements & IDOT Manual “Working platform” requirements for pavement construction Persistence length is the length which the polymer looks like straight. -e : one negative charge

Project Tasks Task 2: Evaluate currently available data for the subgrade test sections constructed in the Fall of 2003 and the necessity/usefulness of constructing additional subgrade treatment test sections at O’Hare (Effort completed) Plate load tests conducted (8/04) on the test sections: Plate 1: 12-inch stabilization/compaction – no admixture Plate 2: 12-inch quicklime fine (40 lb/yd2) & fly ash (80 lb/yd2) stabilization Plate 3: 12-inch quicklime fine stabilization (40 lb/yd2)  Plate 4: 12-inch lime kiln dust stabilization (40 lb/yd2)  Persistence length is the length which the polymer looks like straight. -e : one negative charge

Modulus of Subgrade Reaction, k Plate Load Tests Persistence length is the length which the polymer looks like straight. -e : one negative charge Modulus of Subgrade Reaction, k

Project Tasks Task 3: Advise OMP on current and future test section monitoring and field test evaluation programs (Effort completed) Various field tests may be useful to characterize the treated subgrade (OMP will arrange for testing): Dynamic Cone Penetrometer (8/04) Light-Weight Deflectometer (8/04) Clegg Hammer Geogauge Heavy Weight Deflectometer (HWD) Ground Penetrating Radar (GPR) Seismic Pavement Analyzer, SASW, etc. Persistence length is the length which the polymer looks like straight. -e : one negative charge

Dynamic Cone Penetrometer Light-Weight Deflectometer Persistence length is the length which the polymer looks like straight. -e : one negative charge

Project Tasks Task 4: Evaluate currently available geotechnical/subgrade data for the North Runway with emphasis on the stockpiled “Deep Pond” soils. Recommend further soil sampling & testing to be conducted (by an OMP designated testing firm) (Ongoing) Routine tests to establish representative soils existing for the runway subgrade Grain size distribution (including hydrometer) Atterberg limits (LL and PL for PI) Moisture-density-CBR PH value & calcareous content If needed, organic matter content Persistence length is the length which the polymer looks like straight. -e : one negative charge

Preliminary Geotechnical Report Soil sampling & testing conducted by Everest Engineering on OMP Runway 9L-27R - October 2004 Atterberg limits (LL and PL for PI) Persistence length is the length which the polymer looks like straight. -e : one negative charge Boring Logs

Preliminary Geotechnical Report Soil sampling & testing conducted by Everest Engineering on OMP Runway 9L-27R - October 2004 Grain size distribution (including hydrometer) Persistence length is the length which the polymer looks like straight. -e : one negative charge

Preliminary Geotechnical Report Soil sampling & testing conducted by Everest Engineering on OMP Runway 9L-27R - October 2004 Moisture-density-CBR Persistence length is the length which the polymer looks like straight. -e : one negative charge

Preliminary Geotechnical Report Soil sampling & testing conducted by Everest Engineering on OMP Runway 9L-27R - October 2004 Persistence length is the length which the polymer looks like straight. -e : one negative charge Unconfined Compressive Strength, Qu

Soil Sampling: Dec. 04 – Feb. 05 Current scheduled soil sampling & testing from the R9L-27R The Drilling Program Auger borings, 17 boreholes, MT-1 to MT-17 10’ to 45’ depths through fill & cut areas All reaching down to elev. 640’ in the natural subgrade 3 North of runway, 3 North edge of runway, 4 under runway, 2 South edge of runway, 2 between runway and taxiway, and 3 under taxiway SPT and soil sampling at 2.5’ Moisture content, LL, PI, grain size distribution (%clay) Shelby tube samples at each location (638’ to 642’) At least 1 bucket for each major soil in each borehole Two 5-gallon buckets (60-70 lbs./bucket) for each representative soil (composite sample) to test at the University of Illinois

Soil Sampling: Dec. 04 – Feb. 05 University of Illinois input/review – The Drilling Program Laboratory Testing Needs Check the pH of the soil samples Check the samples for “free carbonates” by squirting with 10% HCl solution How are the SPT samples handled? “N” counts will be helpful in assessing the mobility characteristics (sinkage/rolling resistance) of the stockpiled soils What tests are conducted with the Shelby tube samples? Undisturbed samples obtained from the natural subgrade (finished subgrade elevation) will be best utilized to run unconfined compressive strength and resilient modulus tests

Project Tasks Task 5: Based on the data and information gathered in Task 4, select (in consultation with OMP) the identified representative soils and recommend an admixture stabilization program (Ongoing) Tests to be conducted at the UIUC Advanced Transportation Research and Engineering Laboratory (ATREL) on both untreated & treated soils Moisture-Density-CBR Unconfined Compressive Strength Resilient Modulus Permanent Deformation @ 6-psi deviator stress Persistence length is the length which the polymer looks like straight. -e : one negative charge

Project Challenges Proper sampling of the R9L-27R stockpiled soils Selecting & identifying representative soil samples Adequately characterizing the representative soil samples by conducting tests at the UIUC ATREL for Moisture-Density-CBR Unconfined Compressive Strength Resilient Modulus Permanent Deformation @ 6-psi deviator stress Persistence length is the length which the polymer looks like straight. -e : one negative charge

University of Illinois Laboratory Testing Program at ATREL Advanced Transportation Research & Engineering Laboratory (ATREL)

Admixture Types / Sources Carmeuse (potential supplier) South Chicago (dolomitic lime) Buffington, IN (high calcium lime) Lime types Lime Kiln Dust (LKD) Quicklime fines Buffington is the primary source (We will work with this & confirm with S. Chicago)

Proctor Compaction (ASTM D698, D1557) Moisture- Density- CBR CBR (ASTM D1883) Untreated Proctor Compaction (ASTM D698, D1557)

Moisture-Density-CBR Lime treated Lime treated

Moisture-Density-CBR Treated LKD: Lime Kiln Dust

Unconfined Compressive Strength sd = s1 – s3(=0) failure C = (s1f)/2 = Qu/2 s3 = 0 s1 s1f s Cohesive Soils (c, f=0) (ASTM D2166)

Typical Unconfined s-e Data 60 Dupont Clay MC = 23 % 50 DD = 103.5 pcf CBR = 14 Qu = unconfined compressive strength = peak s1 10 20 30 40 MC = 26 % DD = 98 pcf CBR = 8 Axial Stress, psi MC = 28.5 % DD = 93.5 pcf CBR = 4 MC = 30.5 % DD = 92.5 pcf CBR = 2.5 5 10 15 Axial Strain, %

Deviator Stress at Failure

Deviator Stress at Failure Effect of Curing

Resilient Modulus Testing sd Unconfined: s3 = 0 2-in. in f MR = resilient modulus = sd / er sd : Deviator stress er : recoverable strain Conditioning: 200 load applications at s3 = 0, sd = 41 kPa Testing: 100 load applications sd = 14, 28, 41, 55, 69, 83, 96, 110 kPa

MR Tests – Soil Samples Cylindrical specimens, 2 in. f by 4 in. high Undisturbed soil samples – Shelby tube (f = 2.8, 4 in.)

Typical MR Characterization Greensboro, NC Airport Subgrade Soils 28 M R = - 2.21248 s d + 29.696 2 = 0.9497 24 A-4 soil at OMC RESILIENT MODULUS M R (ksi) A-4 soil at OMC+3 20 Bilinear or Arithmetic Model 16 M = - 0.6274 s + 1820 R d 2 12 R = 0.6617 8 4 M = - 0.4203 s + 8.351 R d M = 0.0408 s + 4.9412 R d R 2 = 0.8715 R 2 = 0.8796 2 4 6 8 10 12 14 16 18 APPLIED DEVIATOR STRESS s (psi) d

Resilient Modulus Testing

Resilient Modulus Testing

Resilient Modulus Testing

Project Deliverables Technical Notes have been / will be prepared and submitted to the OMP throughout the project duration to communicate specific findings and recommendations to OMP engineers Several of the Project Tasks are being pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP A Report summarizing the laboratory program will be prepared A Final Report will be prepared at the end of the one-year study (September/October 2005) We will continue to work with OMP on future subgrade soil support and stabilization needs for other runways/taxiways Persistence length is the length which the polymer looks like straight. -e : one negative charge

Illini Apparently Have Spent A Little Longer At No. 1 This Time!.. GO ILLINI !..