Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.

Slides:



Advertisements
Similar presentations
High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
Advertisements

1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
GSA: American Recovery & Reinvestment Act
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
Campus Energy Efficiency Fund PERC Fall Conference and Annual Meeting Climate Change Panel Joyce Ferris October 29, 2013.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
Learning by Design Using LEED to enhance teaching and learning.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Policy: Zero Net Energy Homes in 2020 Martha Brook, P.E. High Performance Buildings.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Federal High Performance and Sustainable Buildings, the MOU and DOE Briefing May 1, 2006 Anne Crawley DOE Energy Efficiency and Renewable Energy Federal.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
1 Going Green An Overview of New Requirements for Sustainable Facility Design and Construction NIH – Office of Research Facilities Development and Operations.
Phoenix Convention Center Phoenix, Arizona Supporting Today’s Energy Manager: Tools and Training from DOE FEMP Agency Energy Manager Energy Manager Skill.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
U.S. General Services Administration GSA & the American Recovery and Reinvestment Act of 2009.
Phoenix Convention Center Phoenix, Arizona Sustainable Success in the Desert Sustainability Green Buildings: Architecture, Landscape, and Operations Lance.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
Green Universities and Colleges Subcommittee March 16, 2011.
Phoenix Convention Center Phoenix, Arizona Procurement & Benchmarking Strategies for High Performing Buildings Procurement, Process, & People: The Path.
Phoenix Convention Center Phoenix, Arizona Engaging and Empowering Building Occupants to Meet Energy Goals Track 9: Institutional Change August 12, 2015.
Phoenix Convention Center Phoenix, Arizona GSA’s Actions under the PPCC GSA’s Pipeline Session 1, Track 5Meeting the PPCC Sharon Conger Public Building.
Phoenix Convention Center Phoenix, Arizona Business as Usual: Cost-Saving Activities that Green the Federal Government Solution ShowcaseGreening the Federal.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Track 7, Session 7 Overview Building Performance Data Center Energy.
Northwest Power Planning Council The Fifth Plan’s Draft Conservation Resource Assessment Summary of Results To Date April 8, 2003.
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Intelligent Building Systems a Key to Sustainability Paul Ehrlich, PE President Building Intelligence Group EPRI Summer Seminar 2008 San Francisco, CA.
THE U.S. GENERAL SERVICES ADMINISTRATION Who Are We? August 31, 2010 Georgia Tech Research Institute Atlanta, Georgia.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Phoenix Convention Center Phoenix, Arizona Building Performance Using DOE’s Energy Modeling Tools For Retrofit Planning Using DOE’s Energy Modeling Ecosystem.
Demand Side Energy Management & Conservation Lighting Retrofits The University of Texas at Austin.
The American Recovery and Reinvestment Act: A NIH Overview.
Phoenix Convention Center Phoenix, Arizona Greening the Federal Government Track 1: Solution Showcase August 11, 2015.
Sustainable Laboratory Design: Challenges and Solutions
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
University of Central Florida David Norvell PE, LEED AP December 15,
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Phoenix Convention Center Phoenix, Arizona HVAC Technologies Track 3: Energy Technologies August 12, 2015.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Martin Weiland, P.E.
ENERGY EFFICIENCY & SUSTAINABILITY IN NEW SCHOOL CONSTRUCTION August 10, 2006 SFB STUDY SESSION.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
LEED Volume Certification Program for Operations & Maintenance and Guiding Principles Compliance CTG Energetics, Inc. Lisa Stanley, CEM, CPM, LEED AP O+M.
Phoenix Convention Center Phoenix, Arizona Case Studies of Institutional Change at the Campus Level Track 9: Institutional Change August 13, 2015.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
High Performing and Sustainable Buildings – Per UFC and AGRAM 17-01  
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
County of Kane Facility Efficiency Improvements.
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED AP (BD + C) US General Services Administration August 13, 2015

Energy Exchange : Federal Sustainability for the Next Decade Lessons Learned from ARRA Projects Overview What worked: process What worked: technology and project case studies What worked less-well than planned 2

Energy Exchange : Federal Sustainability for the Next Decade What worked: process Methodical selection criteria GSA selected projects that met the American Recovery and Reinvestment Act’s criteria based on two overarching criteria: Ability of the project to put people back to work quickly, and transforming Federal buildings into high-performance green buildings. The complete list of selection criteria, in descending priority order is: – High-performance features concentrating on energy conservation and renewable energy generation. – Speed of construction start (creating jobs), with an emphasis on those projects that could begin within 120 days. – Execution Risk (ensuring that the projects will not fail due to unforeseen conditions) – Facility Condition. The Facility Condition Index is a standard real estate industry index that reflects the cost of the repair and alteration backlog of a particular building relative to the building's replacement value. – Improving Asset Utilization – Return on Investment – Avoiding Lease Costs – Historic Significance In any construction or modernization project, objectives go far beyond just saving energy. GSA has carefully implemented the objectives of the Recovery Act, and continues to deliver projects that combine different types of work to yield sound overall value. 3

Energy Exchange : Federal Sustainability for the Next Decade What worked: process Systematic data gathering GSA’s gBUILD project tracking tool – Collect and review high performance green building project information, including scope details and performance projections – Verify compliance with the Guiding Principles “On Green” performance measure – GSA’s Minimum Performance Criteria Recurring dashboards and reports for unprecedented transparency 4

Energy Exchange : Federal Sustainability for the Next Decade What worked: technologies and project case studies Dayton Federal Building & U.S. Courthouse Completion Date: FY2012 Project Cost: $4,701,240 Actual Energy Reduction: 32% The Dayton Federal Building & U.S. Courthouse in Dayton, OH, invested Recovery Act funding for daylight harvesting and occupancy sensors, the installation of high performance heating ventilation and air conditioning components, a new rooftop air handling unit, building pressurization, and low-flow restroom fixtures with lavatory sensors. 5

Energy Exchange : Federal Sustainability for the Next Decade What worked: technologies and project case studies Thomas S. Foley U.S. Courthouse Completion Date: FY2013 Project Cost: $43,743,451 Actual Energy Reduction: 47% The Thomas S. Foley U.S. Courthouse in Spokane, Washington used Recovery Act funding to turn an aging building into a modernized and operationally efficient high-performance green building. The project focused on upgrades and replacements of building systems including electrical, HVAC, and lighting systems. Resource efficiency improvements include system level submetering of lighting and plug loads, indoor lighting retrofits with LED lamps, occupant sensors, time scheduling and integration with building automation system (BAS), and outdoor lighting retrofits. Indoor environmental quality was also improved through task ambient conditioning systems that allow occupants to control thermal conditions in small, localized zones. Indoor water conservation measures include installation of new low-flow, sensor-controlled lavatory fixtures. This renovated U.S. Courthouse earned LEED Silver certification. 6

Energy Exchange : Federal Sustainability for the Next Decade What worked less-well than planned – Energy models can make unrealistic assumptions – Faulty commissioning – Insufficient training – Buildings with old, poorly-designed systems (thermal loops upon loops, single-pane glass, etc.) – Insufficient recirculation of conditioned air Difficulty parsing out HPGB-specific cost Burden of data gathering upon PMs 7

Energy Exchange : Federal Sustainability for the Next Decade Next Steps Continue Light-Touch Measurement & Verification Review Implementation strategy for achieving 2025 goals set out in EO Assessing performance of buildings meeting the Guiding Principles – Follow on to GSA’s post occupancy evaluation and Green Building Performance reports 8