© J. Christopher Beck 2007 Commentary on Session A J. Christopher Beck Department of Mechanical & Industrial Engineering University of Toronto, Canada.

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

Keys to Maximizing Component Reuse: Lessons and Case Studies OReilly Conference on Enterprise Java March 29, 2001 Presented by Gary Baney CTO, Flashline.com.
Systems Planning Sample Questions and Answers
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Help communities share knowledge more effectively across the language barrier Automated Community Content Editing PorTal.
Information Systems in Business
Session B Wrap-up Summary and Commentary Roman Barták Charles University (Czech Republic)
Braiding Initiatives Steve Goodman, Michigan’s Integrated Behavior and Learning Initiative (MiBLSi) April 16, :00PM – 3:30PM
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Assessing Plant Performance for Energy Savings Elizabeth Dutrow ENERGY STAR
11.1 Lecture 11 CASE tools IMS Systems Design and Implementation.
SE 464: Industrial Information systems Systems Engineering Department Industrial Information System LAB 02: Introduction to SAP.
Software Product Lines
Information Systems In The Enterprise
9.614 Information Age Organizations Instructor: Bob Travica Class 1 IT/IS and Organizational Effects (Chapters: 2; 4, pp ; 10, pp ) Asper.
Challenges of Bringing Information Markets to the Organization.
Horizon 2020 Energy Efficiency Information Day 12 December 2014 Parallel session: Energy Efficiency in Industry (large companies and SMEs) – Topics EE16.
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
EU Macro-regions e.g. Baltic Sea Region Macro-regions e.g. Baltic Sea Region National Regional City-regions Cluster Policy in Europe Local.
Engineering & Physical Sciences Research Council.
Assessing The Value of Web 2.0 on Knowledge Management A HEALTH CARE REIMBURSEMENT STUDY ICELW CONFERENCE JUNE 2013.
AQIP Quality Checkup Visit Six Sigma Annette McIver Project Coordinator Human Resource Development/ SkillsMAX March 14, 2008.
Developing an IS/IT Strategy
IGEM Project Technology Name Presenter’s Information and Title Title of Industry Contacts and University Contacts.
Electronic Controls and Communications. The Global Challenge Of Strategic Standardization Management Alec McMillan Rockwell Automation Director, Global.
Assessing Plant Performance for Energy Savings. Today’s discussion Critical foundation for plant assessments – a strategic energy management program Background.
Project Management Fundamentals Success Skills for Supervisors The Supervision Series, Level 2 Presenter: Galen Lentz April 16, 2015.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Section V Financial and Accounting Dimensions. Financial and Accounting Dimensions Three Myopic Views Exchange Rates; Asymmetry in Pricing Capital Investments;
Software Testing in the Cloud Leah Riungu-Kalliosaari.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
 All companies have to adapt to change  Driving forces that affect an industry environment:  External Forces + New Competitive Change = Change in an.
Slide 6-2 ORGANIZATIONAL MARKETS AND BUYER BEHAVIOR C HAPTER.
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
Workshop on the Future of Scientific Workflows Break Out #2: Workflow System Design Moderators Chris Carothers (RPI), Doug Thain (ND)
Introduction to Human Resource Development -Achin Bansal -Anu A Natraj.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Economic Evaluation of IT Impacts.
6/6/01 1 Copyright 2001 by Ralph R. Young Effective Requirements Practices Designed to improve individual, project, and organizational effectiveness. Based.
The Impact of Open Source Software on Competition on Software Markets Jens Mundhenke Kiel Institute for World Economics Baltic IT&T 2005 Forum Seminar.
Copyright © - The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
EU Projects – FP7 Workshop 6: EU Funding –What’s Next? Carolina Fernandes Innovation & Funding Manager GLE Group.
ISO (C)SR Standard: Implications from a market access perspective Tom Rotherham International Institute for Sustainable Development (IISD)
Integrating Climate Change with Core Business Activities Jonatan Pinkse & Ans Kolk University of Amsterdam Business School The Netherlands.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
Tom Vereijken | Chairman, Eucetsa TOWARDS A EUROPEAN ETV SYSTEM Tom Vereijken EUCETSA.
The future of Statistical Production CSPA. 50 task team members 7 task teams CSPA 2015 project.
Meeting an Evaluation Challenge: Identifying and Overcoming Methodological Problems Joint CEA/AEA Evaluation 2005 “Crossing Borders, Crossing Boundaries”
United States-Canada Regulatory Cooperation Council TBWG Fall Plenary November,
Foundational Program Overview September  2004 Copyright RosettaNet. RosettaNet Foundational Programs Program Overview ProgramPhase InvestigateDesignImplement.
PeersNet (A community based media/web builder platform) A one stop solution to get community based web/media portal and infrastructure with highly rich.
1 Human Resource Development Introduction. MH 2 Definition of HRD A set of systematic and planned activities designed by an organization to provide its.
New System for Funding & Payment Processing. Content Background Key Elements High Level Scoping (phase 1) Requirements Gathering(phase 2) Key issues for.
Bob BERSANI, GS1 Vice President Global Standards GS1 Standards Development Update.
Using common indicators: A tool-building approach Becca Blakewood, US Impact Study.
Continuing Studies Database By: Matthew Hammond. What is Continuing Studies? Continuing Studies – Provides opportunities for working individuals – Several.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
HOW A PMO CAN DRIVE A PROJECT MANAGEMENT CULTURE Allan R. Loucks, M.A., Psy.D. Robert J. Hess, PMP January 27, 2010.
Test all the things! Improving code quality at the OU with Continuous Integration MoodleMoot Ireland UK 2016 Mark Johnson Tony Lin.
Schlenker, H. , R. Kluge, and J. Koehl
HCS 586 Competitive Success/snaptutorial.com
Organizational Cost Reduction Steps to Use CRM Applications for.
HCS 586 Enthusiastic Studysnaptutorial.com
Software Product Testing
Presented to IEEE Standards Education Committee 11 April 2014
DOCUMENTAL SOLUTIONS Market Analysis Intelligence & Tools
Gongbo Lin & Qiping Shen Journal of Management in Engineering
Addressing Test coverage in Continuous Testing
Stock Market Trading Hours Finasko.com. NYSE Trading Schedule Trading Days – Monday to Friday Opening Time – 9:30 a.m. Eastern Standard Time Closing Time.
Case Study: Multi-System Migration to ENOVIA PLM
Presentation transcript:

© J. Christopher Beck 2007 Commentary on Session A J. Christopher Beck Department of Mechanical & Industrial Engineering University of Toronto, Canada Scheduling a Scheduling Competition, Providence, Sept 2007

2 © J. Christopher Beck Papers Ghersi et al. focuses on an operational question –how do we judge the results? –important, technical issue –valuable for whoever runs the competition Other 3 papers focus on a more strategic question –what problem types should the competition address?

3 © J. Christopher Beck 2007 Some Operational Issues Automated verification of results Entries need to run on the same platform Not just source code vs. binary –License issues?

4 © J. Christopher Beck 2007 Integration vs. Focus Rich problems (Le Pape; Guerri et al.) vs. a single fundamental issue (Cicirello) Things to consider: –industry impact –potential for research progress/breakthroughs will we understand the results? –barriers to entry easier to participate in Cicirello-style track –is this an OR vs. AI issue?

5 © J. Christopher Beck 2007 Multiple Tracks? Perhaps of increasing difficulty Things to consider: –spreading the competition too much one entry per track is not very interesting –“granularity” of tracks –creating a challenge –barriers to entry

6 © J. Christopher Beck 2007 Robustness as a Criteria Bias evaluation toward good performance on all instances (Le Pape) Best all-round single machine scheduler across different opt. funcs (Cicirello) Things to consider: –“jack of all trades, master of none” give up on being “the” best on a given problem marketing –industry vs. research –another OR vs. AI issue?

7 © J. Christopher Beck 2007 Competition or “Challenge” Competition –like SAT or Planning competition –multiple tracks Challenge –one problem type (e.g., one of Guerri et al.’s, one of Le Pape’s) –long work horizon (e.g., 6 months – 1 year) –like the CP Modeling Challenge (2005)

8 © J. Christopher Beck 2007 Competition or “Challenge” Things to consider: –marketing –(end user) industry interest and commitment –barriers to entry –potential for lack of community interest –organizational overhead