2009 DOE ISM Conference Putting Spokes in the Wheel: Understanding Feedback and Improvement Vance S. Tisdale Operational Performance Improvement Manager.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Effective Contract Management Planning
Disclaimer DISCLAIMER: This material was produced under grant number SH F-12 from the Occupational Safety and Health Administration, U.S.
Laser Direct Manufacturing of Nuclear Power Components
Smart Grid Communication System (SGCS) Jeff Nichols Sr. Director IT Infrastructure San Diego Gas & Electric 1.
More CMM Part Two : Details.
Implementing American Recovery and Reinvestment Act Work Safely Sam Easterling ES&H Projects Specialist ES&H B&W Y-12.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Smart Grid Primer Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Energy Bar Association – Primer for Lawyers.
Megan Houchin Safety Analysis Engineering Y-12 National Security Complex SAWG May 7 th, 2012.
Keeping your Automated Devices Alive
Purpose of the Standards
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
PMP® Exam Preparation Course
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
NIST Special Publication Revision 1
Integrated Safety Management Summit Y-12 Safety Performance Driven by Employee Teams Doug LeVan Director, ES&H Performance Improvement August 2009.
Deposition Velocity Issues at Y-12 Bruce A Wilson Chief Engineer, Nuclear Facility Safety Douglas Clark Analyst B&W Technical Services Y-12 May 9, 2012.
1 Floyd Galvan October 12-13, 2011.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Modeling and Validation of a Large Scale, Multiphase Carbon Capture System William A. Lane a, Kelsey R. Bilsback b, Emily M. Ryan a a Department of Mechanical.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
PRES-ET A011 Lynn J. Harkey SDIT Project Engineer Uranium Processing Facility Project B&W Y-12 August 26, 2009 The Process, Methods and Tool Used.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Optimal Food Safety Sampling Under a Budget Constraint Mark Powell U.S. Department of Agriculture, Office of Risk Assessment and Cost-Benefit Analysis.
OG&E’s Smart Study TOGETHER: Impact Assessment of Enabling Technologies and Dynamic Pricing Rates Katie Chiccarelli, Craig Williamson January 24, 2012.
SacProNet An Overview of Project Management Techniques.
USAEE Conference 2011, CJN Oct 2011 The Role of CCS under a Clean Energy Standard 30 th USAEE/IAEE Conference Oct 10, 2011 Washington, DC Chris Nichols,
2011 Broward Municipal Green Initiatives Survey Results GHG Mitigation Energy 2/3 of Broward’s reporting municipalities have implemented incentives or.
Georgia Institute of Technology CS 4320 Fall 2003.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Y-12 Integration of Security and Safety Basis, Including Firearms Safety David Sheffey Safety Analysis, Compliance, and Oversight Manager B&W Technical.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
V Work Environment Forecast – Dec There is a COLD WIND a coming… Larry Supina Manager, Pantex Readiness Consolidated Nuclear Security, LLC
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
What’s All This I Hear About Information “Architecture?” InterLab 06 Joe Chervenak & Marsha Luevane National Renewable Energy Laboratory.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Technical Report NREL/TP April 2008 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2008 Composite Data.
THE Y-12 EXPERIENCE: IMPLEMENTING AND MEASURING A NUCLEAR SAFETY CULTURE Dr. Jeff Miller, Oak Ridge Associated Universities (ORAU) Paul Wasilko, B&W Y-12.
John Blair Woods Manager, Program Analysis and Evaluation Safeguards, Security, & Emergency Services B&W Y-12 August 27, 2009 Integrated Safety and Security.
1 Technical Report NREL/TP June 2010 Early Fuel Cell Market Deployments: ARRA Quarter 1 of 2010 Composite Data Products Final Version February.
V UNCLASSIFIED This document has been reviewed by a Y-12 DC/UCNI-RO and has been determined to be UNCLASSIFIED and contains no UCNI. This review does not.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Improvement of Integrated Work Management and ISM Presented.
Project Management Process
National Renewable Energy Laboratory 1 Innovation for Our Energy Future.
Evaluation of the Impact to the Safety Basis of Research Conducted in Production Facilities at the Y-12 National Security Complex Rebecca N. Bell Senior.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
1 Working with Project Stakeholders in a Statewide Project PMI-SVC PMO Forum Monthly Meeting Dan Conway, PMP October 22, 2008.
IMPLEMENTATION PAPAC PROCESS NASA Customers and Stakeholders FORMULATION APPROVAL Manage Strategically Communicate Knowledge Generate Knowledge EVALUATIONEVALUATION.
Planning for Succession
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Subset Selection in Multiple Linear Regression
September Workshop and Advisory Board Meeting Presenter Affiliation
September Workshop and Advisory Board Meeting Presenter Affiliation
9995 Overloaded Drum Incident
2/3 20% 71% Half 54% Over Half 45% 14% Introduction GHG Mitigation
Presentation transcript:

2009 DOE ISM Conference Putting Spokes in the Wheel: Understanding Feedback and Improvement Vance S. Tisdale Operational Performance Improvement Manager August 27, 2009

Personal Biography - Vance S. Tisdale Vance has been employed at Y-12 since December of He has served in eight different positions during his tenure including: –Operations Manager –Technical Assistant –Production Manager in Manufacturing –Program/Project Manager for Readiness in Technical Base and Facilities –Currently serving as Operational Performance Improvement Manager since May of 2007 Vance gained his prior experience in the United States Navy where he served in the Nuclear Submarine Force. He graduated from the United States Naval Academy in 1983 with a Bachelors Degree in Mathematics. He earned his Masters Degree in Operations Analysis from the Naval Postgraduate School in Monterey, CA in He served on board the USS Woodrow Wilson (SSBN-624) as a Division Officer. His Department Head tour included positions as Engineering Officer and Navigator on board the USS Daniel Boone (SSBN-629). His final tour of duty in the Navy was serving on the Joint Staff at the Pentagon. Vance is married to Kori Tisdale of Pensacola, Florida. They have four sons: Brian – 25, Justin – 22, Shawn – 19, and Jeremy – 18.

The Wheel as We Know It Define the Scope of Work Analyze the Hazards Develop and Implement Controls Perform the Work Provide Feedback and Improvement

Key Definitions Feedback – The return of a portion of the output of a system or process to the input, especially in order to correct, control, or modify the output. Process by which a continuing action is controlled or corrected. Improvement – The act of raising a process to a higher or more desirable condition. To increase in value or excellence. To make better.

The “Spokes” of Feedback and Improvement

Define the Scope of Work Scope of Work F & I Translate missions into work, standards & requirements, expectations, task schedules, and resource allocations WORKER right and responsibility to participate NNSA proposes work scope; contractor evaluates against current capacity/resources/priorities Budget and funding based on proper use of resources (judicious use of OT, future planning, maint., const.) Unresolved items in budgeting/prioritization to Senior Management (Executive Steering Group) Budget reconciliation Performance measures/metrics show commitment to continuous improvement Baseline Change Proposals to update/revise scope

Analyze Hazards Identify, analyze, and categorize hazards associated with the work Participation from all involved (technical and subject matter experts, ES&H disciplines, WORKERS) Detailed Engineering Analyses (Design Analysis Calculations) Automated Job Hazards Analysis (AJHA) Design Safety Analysis (SAR) and Unreviewed Safety Question Determination (USQD) process for changes Applicable Lessons Learned captured and applied Job-specific hazards formally identified F & I Analyz e Hazard s

Develop and Implement Controls F & I D & I Contro ls Implement identified controls to mitigate risk of the hazards Tailor controls to the scope of work Implement engineered controls/admin controls/PPE Design/construct systems (passive controls over active) Follow Technical Safety Requirements (TSR) Maintain configuration management/control of SSCs Flow down controls into procedural steps/testing requirements (WORKER involvement/ownership) Confirm readiness (mock-ups/surrogate materials) Obtain approval of Operational Safety Board or Management Review Board (OSB/MRB) Authorize work (Operations Manager via POW/POD)

Perform the Work Perfor m Work F & I Do the work within the identified controls and Conduct of Operations (CONOPS) requirements Control of operations in a disciplined manner (rigor and formality) Shift Manager grants work start approval (changing conditions) Pre-job Briefings Compensatory Measures Step-by-step performance of Technical Procedures Peer checks and Independent Verification (critical steps)

Perform the Work Perfor m Work F & I Do the work within the identified controls and CONOPS requirements Area walk-downs by management/OPI Reps/External Reps Management Oversight Personnel (MOP) for new Start-up evolutions OPI Assist Visits as requested by management Formal Assessments of Work (MA, IA, external organizations) Suspend and Stop Work Authority

The STAR of the Show Feedback and Improveme nt Gather feedback information on the effectiveness of controls and the conduct of work to identify continuous opportunities for improvement Worker involvement at all levels Post-job debriefings Abnormal events (IEI, Critique Determination, Formal Critique, Occurrence Reporting) CONOPS Index (grading, normalizing, and trending of “CONOPS Errors”) Lessons Learned and News You Can Use Continuous improvement of knowledge and experience at all levels (training and qualification, continuing training, OPI Focus Area Training)

The STAR of the Show Feedback and Improveme nt Gather feedback information on the effectiveness of controls and the conduct of work to identify continuous opportunities for improvement Issues Management System (corrective action plan, field verification, beware “completion complacency”) Tracking and Trending of assessment data and corrective action plan progress Housekeeping to improve WORKER morale, direct involvement (funded efforts, results measured in tons) YSO/Y-12 regular interface (daily conference call) Incentive fees awarded for accomplishing milestones OPI recommended improvements

The STAR of the Show Feedback and Improveme nt Gather feedback information on the effectiveness of controls and the conduct of work to identify continuous opportunities for improvement Feedback and Improvement Working Group (FIWG) −Analysis of performance trends and conclusions −Evaluate site-wide performance – explore programmatic or systemic issues −Present results to senior management (ESG) −Support improvement DECISIONS Corporate Independent Assessment of ISM Implementation

Conclusion: The Spokes of the ISM Wheel

DISCLAIMER This work of authorship and those incorporated herein were prepared by Contractor as accounts of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Contractor, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, use made, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency or Contractor thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency or Contractor thereof.