Bewdley Flood Alleviation Scheme. Bewdley, November 2000.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

3.2.7 Off-Site Housing and Tenure Improvement in the Philippines: The Case of Medium Rise Housing (MRH) Project in Muntinlupa City 1 UPA Package 3, Module.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Totnes Bridge Presentation to Totnes Town Council 5 November 2012 John Fewings.
Huntly Flood Alleviation Scheme
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
UPPER SLIDE RAVINE WORKSHOP City of Grass Valley September 29, 2009.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Innovating in a compact environment
Hebden Bridge A case study considering the contribution of overland flow processes to flood risk in Hebden Bridge, West Yorkshire.
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
PROGRESS REPORT JULY 2012 Published August 20, 2012.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Flooding John Backley,OCC and The Environment Agency.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Caythorpe Gas Storage Project Liaison Committee Meeting 28 th September 2009.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Crisis in Shrewsbury Flooding impacts and risk management.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Replacement of existing rock groynes and other in river restoration works to improve rapids and habitats in the River Wye at Symonds Yat.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Richard Cairns, Executive Director of Infrastructure and Regeneration Community Alliance 5 August 2015.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
STORM IMPACT THE CLARE EXPERIENCE. Tom Tiernan SE, Clare Co Co Cyril Feeney SEE, Clare Co Co.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
FLOOD DEFENCES ALONG THE R. MEDWAY AROUND TONBRIDGE.
Totnes Old Bridge Presentation to the Totnes Traffic and Transport Forum 10 October 2012 John Fewings.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Tunnelling underground space MSc Tunnelling & Underground Space Environmental management on site part 1.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
What are the management challenges associated with the development of river landscapes? Managing river landscapes is often about balancing socio-economic.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
Downtown Marina Authorization for 30% Design Contract for Downtown Marina and Adjacent Areas & Functions Stockton City Council December 6, 2005 Agenda.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Stage 2 Light Rail Transit Program “In the ground ready”
Potomac Yard Metrorail Station
Finance Committee & City Council October 10, 2016
OPW FLOOD DEFENCE WORKS
Abbey Creative Quarter Update September 2016
Little Rapids Habitat Restoration St
Western Orbital Local Liaison Forum 11TH September 2017.
NORTH TRUNK SEWER REPLACEMENT PROJECT
Measure A Financial Oversight Committee August 7, 2013
Hebden Bridge A case study considering the contribution of overland flow processes to flood risk in Hebden Bridge, West Yorkshire.
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
New Public Transport Infrastructure
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Manilla Low Level Crossing Project
Presentation transcript:

Bewdley Flood Alleviation Scheme

Bewdley, November 2000

Tourists

The Team The Environment Agency Halcrow (Severnside North) Worcestershire County Council Birse Construction( Severnside North ) Bauer/IBS

Options Considered Dredging works By-pass tunnel Upstream storage combined with by-pass Defences at Severnside North and South

Bewdley Overview Cost/benefit analysis precludes a flood defence scheme for Wribbenhall/Beales Corner. Scheme for right bank (Bewdley town) to be implemented in two stages: Phase 1 - Severn Side North ( ) Phase 2 - Severn Side South ( ) Design scheme for both Severn Side North and Severnside South consists of both demountable and permanent section of flood defence walls.

Chosen line of defence on Severn Side North Preferred line selected as best solution on consideration of the following issues: Defence has to link Bewdley Bridge to high ground in Dog Lane Car Park. Engineering constraints including location of existing utilities, drainage and need for cut-off wall. Environmental constraints including potential impacts on listed buildings and Bewdley Bridge.

Proposed line of SSN defence

Typical section of demountable defence along Severn Side North All permanent works below ground level The quay wall has been repaired and strengthened The quay surface be relaid and repaired

IBS/Bauer Demountable Flood Protection System in action

I

Typical section of permanent brick faced defence adjacent to Dog Lane Car Park

Severnside North Construction Piling and construction of cut-off wall and foundation for defences forms major part of construction work. Noise, access restrictions for cars and visual intrusion will be the main impacts during the work. The contractor operated from the quay and river bank, only needing to work in the channel at Tolleys Corner where the new section of quay has been built as one of the last items.

Mitigation Mitigation during construction - noise and vibration minimised. - pedestrian access maintained along SSN. - working hours restricted. - alternative parking arranged. Environmental mitigation - existing setting and character to be retained. - no impact tie-in of defence to Bewdley Bridge. - archaeological watching brief during works. - brick facing on permanent defence. - existing groundwater regime maintained.

Environmental Enhancement New 30 metre section of quayside with stone-faced quay wall and paving to match Severn Side North constructed adjacent to Tolleys Corner. Restoration of existing quay wall and quayside paving, steps and railings. Riverside park enhancement adjacent to Dog Lane Car Park including planting and paving works. Access along riverside footpath (Worcestershire Way) to be improved over the length of the quayside extension.

Progress Public Exhibition and meetings Site Investigation for Severn Side North including ground, sewer and topographical surveys. Severn Fluvial Strategy (in progress). Consultations with Statutory bodies and utility companies, in particular Severn Trent Water to resolve the drainage issues. Consultations with interested parties including residents and Bewdley Flood Relief Committee, Wyre Forest D C, English Heritage and others.

Progress Publication of Environmental Statement in June Planning Permission granted in July 2001 for Severnside North. Agency Board approval to whole Severnside scheme granted in August DEFRA, (formerly MAFF) approval to whole Severnside scheme granted in November 2001 Agreement reached in October 2001 with Severn Trent Water, DEFRA and OFWAT to resolve the drainage issues.

Progress Quay wall repair contract completed by Nuttalls in early November 2001 Main contract awarded to Birse Construction in November 2001 following DEFRA approval of scheme Birse set up offices in late November Start of main works January 2002 with completion in October 2002

Pile rig on Severnside North

Extending the quay wall Severnside North